Municipality Tender
... More
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Municipality Tender
Civil And Construction
Building Construction
Opening Date19 Sep 2023
Closing Date26 Sep 2023
Tender Amount₹ 1,47,55,428
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
461003Bid Award Id
ViewTender No
E1/1954/HMDA works /packageIV/2023Tender Authority
Municipality ViewPurchaser Address
-Website
http://tender.telangana.gov.inPackage Tenders
E1/1954/HMDA works /packageIII/2023E1/1954/HMDA works /package V/2023E1/1954/HMDA works /packageII/2023...more
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Developmenatl works under HMDA pckg V;Lowering the RCC S/S pipes carefully into the trench laying them true to alignment and gradient, jointing RCC pipes with cement joints including curing, the cost of jointing materials i.e., Cement Mortar (1:1.5), hemp yarn etc., and testing including filling with water with a water lead upto 500 metres excluding cost of rubber rings as per BIS No.783/85. 450 mm dia
208
231
48091.68
... More
Developmenatl works under HMDA pckg V;BLD-CSTN-2-2(10) : Earth work excavation in Ordinary soils by Mechcanical Means-Upto 3 m depth for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work excluding dewatering charges etc as per SS - 20 B (APSS 308).
228.8
127
29101.07
... More
Developmenatl works under HMDA pckg V;Manufacture, Supply and Delivery of R.C.C. Socket and Spigot pipes conforming to B.I.S. 458/2003 at ex-factory (rate per meter of effective length) Excluding transportation, taxes & duties. 450 mm dia
208
1257
261483.04
... More
Developmenatl works under HMDA pckg V;Saw cut joints for freshly laid concrete pavement including all materials and labour charges 2-3mm
2968
97
290003.28
... More
Developmenatl works under HMDA pckg V;Vaccume drying of freshly laid cement concrete floor using 100% air tight suction mat suitable size and length vaccume pump to maintain vaccume pressure 0.7 to 0.8 atmospheres as per the standard procedure, floating with power floter, mechanical travelling, finishing with sound edges and corners including hire and operational charges of machinary, labour fuel etc complete for finished item of work as directed by Engineer-In-Charge of the work.
12500
75
937500
... More
Developmenatl works under HMDA pckg V;RBR-CCPV-6: Construction of un-reinforced, dowel jointed, plain cement concrete pavement of RMC -M 30 Grade over a prepared sub base with 43 grade cement @ 350 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing and Technical Specification 602 MORTH.
1875
5613
10524712.5
... More
Developmenatl works under HMDA pckg V;Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN / Vibratory Roller 80-100 kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406 MORD / MORTH.
1130.51
2013
2276180.14
... More
Developmenatl works under HMDA pckg V;RBR-EECD-8(c) : RBR-EECD-8(c) : Earthwork excavation for road way in soil by mechanical means including cutting and pushing the earth to side of embankment upto a lead of 100 metres including trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections etc., complete for finished item of work for trench cutting as per MOR&H specification No.301 and as directed by the Engineer-in-Charge- (Hydraulic Excavator)
1178.81
76
89837.11
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements