Municipality Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Municipality Tender
Civil And Construction
Drainage Work
Opening Date31 Dec 2024
Closing Date7 Jan 2025
Tender Amount₹ 40,50,098
Costs
EMD
₹ 40,501Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
565210Tender No
E1/21-05/2024-25Tender Authority
Municipality ViewPurchaser Address
-Website
http://tender.telangana.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
UGD MAINTENANCE;PHE-LRCS-6: Lowering the RCC S/S pipes carefully into the trenches laying them true to alignment and gradient, jointing with rubber rings and testing including filling with water with a water lead upto 500 meters excluding cost of rubber rings as per BIS No. 783/1985 600mm Dia
30
288
8662.5
... More
UGD MAINTENANCE;PHE-LRCS-6: Lowering the RCC S/S pipes carefully into the trenches laying them true to alignment and gradient, jointing with rubber rings and testing including filling with water with a water lead upto 500 meters excluding cost of rubber rings as per BIS No. 783/1985 450mm Dia
30
251
7548.9
... More
UGD MAINTENANCE;MANUFACTURE, SUPPLY AND DELIVERY OF __________ DIA R.C.C. SOCKET AND SPIGOT NP-3 PIPES CONFORMING TO B.I.S. 458/2003 EX-FACTORY (RATE PER METER OF EFFECTIVE LENGTH) INCLUDING TRANSPORTATION,TAXES & DUTIES.( NON PRESSURE) 600mm Dia
30
3712
111367.2
... More
UGD MAINTENANCE;MANUFACTURE, SUPPLY AND DELIVERY OF __________ DIA R.C.C. SOCKET AND SPIGOT NP-3 PIPES CONFORMING TO B.I.S. 458/2003 EX-FACTORY (RATE PER METER OF EFFECTIVE LENGTH) INCLUDING TRANSPORTATION,TAXES & DUTIES.( NON PRESSURE) 450mm Dia
30
2319
69586.8
... More
UGD MAINTENANCE;Supply, Lowering and Laying in ready made trench true to alignment and gradient, jointing, and testing of stone ware pipes including cost of jointing material such as cement mortar (1:1) proportion & spun yarn including cost and conveyance of pipe. (Reference to specifications BIS No. 6530/72) 250mm Dia SWG
20
1690
33810.8
... More
UGD MAINTENANCE;Supply, Lowering and Laying in ready made trench true to alignment and gradient, jointing, and testing of stone ware pipes including cost of jointing material such as cement mortar (1:1) proportion & spun yarn including cost and conveyance of pipe. (Reference to specifications BIS No. 6530/72) 300mm Dia SWG
130
2291
297915.8
... More
UGD MAINTENANCE;BLD-CSTN-2-7 - (15) ; Earth work excavation in Hard rock (blasting prohibited)-Upto 3 m depth for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work including seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308).
27
2340
63201.6
... More
UGD MAINTENANCE;Earthwork in excavation for pipeline trenches as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH (RBR-FNDN-1 -Manual means)
221.4
475
105295.63
... More
UGD MAINTENANCE;Manufacture as per BIS:12592 (Part 1&2) Supply & Delivery of manhole covers and frames with ISI marking anywhere in A.P., F.O.R. destination including, loading, un-loading & stacking at site but excluding central excise duty, sales tax, octroi and other Govt levies etc., as applicable I.S.I Mark 24X24 H.D.-20
84
2735
229811.4
... More
UGD MAINTENANCE;Manufacture as per BIS:12592 (Part 1&2) Supply & Delivery of manhole covers and frames with ISI marking anywhere in A.P., F.O.R. destination including, loading, un-loading & stacking at site but excluding central excise duty, sales tax, octroi and other Govt levies etc., as applicable H.D.-20 with 560mm diaclear opening H.D.-35with 560mm diaclear opening
200
3307
661466
... More
UGD MAINTENANCE;Manufacture as per BIS:12592 (Part 1&2) Supply & Delivery of manhole covers and frames with ISI marking anywhere in A.P., F.O.R. destination including, loading, un-loading & stacking at site but excluding central excise duty, sales tax, octroi and other Govt levies etc., as applicable H.D.-20 with 560mm diaclear opening
250
3085
771445
... More
UGD MAINTENANCE;Repairs to existing manhole of 0.9 dia upto 0.60 mt depth with 2nd class traditional Bricks in Cm(1:4) including Internal plastering 20 mm thick in CM(1:3) and External Plastering 12 mm thick in CM(1:3) and top benching in CC(1:2:4) including cost and con
236
2833
668588
... More
UGD MAINTENANCE;Repairs to existing manhole of 0.9 dia upto 0.45 mt depth with 2nd class traditional Bricks in Cm(1:4) including Internal plastering 20 mm thick in CM(1:3) and External Plastering 12 mm thick in CM(1:3) and top benching in CC(1:2:4) including cost and con
315
1726
543872.7
... More
UGD MAINTENANCE;Repairs tof existing manhole of 0.9m dia upto 0.30mt depth with 2nd class traditional Bricks in Cm(1:4) including internal plastering 20 mm thick in CM(1:3) and External Plastering 12 mm thick in CM(1:3) and top benching in CC(1:2:4) including cost and co
318
811
258037.92
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements