Municipality Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Municipality Tender

Works
Civil And Construction
Excavation
Opening Date12 Feb 2024
Closing Date19 Feb 2024
Tender Amount₹ 5,56,144 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
boq;For Footings

1.73

9551

16524

... More
boq;For Plinth Beams

1.17

12424

14537

... More
boq;for Columns

1.71

12875

22017

... More
boq;Roof bems - at 3.5m Height

3.63

12369

44901

... More
boq;Roof Slabs 150mm thick

4.9

10931

53566

... More
boq;Construction of RR Masonary in CM (1:8) prop including cost and conveyance of all materials and labour charges etc complete.

6.39

4403

28139

... More
boq;Construction of CRS Masonary in CM (1:8) prop including cost and conveyance of all materials and labour charges etc complete.

3.56

4937

17577

... More
boq;Supply and Filling of Gravel in foundation trenches including cost & conveyance of all materials, labour charges, seigniorage charges etc., complete.

9.29

421

3920

... More
boq;Plastering with CM 2 coats, 12 mm thick, base coat in CM (1:5), 8mm thick and top coat in CM (1:3), 4mm thick with sponze finishing. including cost & conveyance of all materials like cement, Sand,. Water, etc., to site all operational, incidental charges, labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves where ever necessary etc., complete for finished item of work for uneven surface of walls, (As per SS 904)

44.8

511

22928

... More
boq;Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and technical specifications for Bars below 36 mm dia including over laps and wastage, where they are not welded.

768.67

78

60318

... More
boq;Earthwork excavation and depositting on bank with an initial lead of 10.00Mts and lift of 2.00Mts in loamy, Clayey soils, etc. complete for finished item of work.

2.37

419

994

... More
boq;Supply and Filling of Sand in foundation trenches including cost & conveyance of all materials, labour charges, seigniorage charges etc., complete.

0.2

959

192

... More
boq;Laying of V.C.C. (1:4:8) using 40 mm m/c metal and OPC,coarse and fine aggregate with concrete mixture. All work upto plinth level including cost & conveyance of all materials, labour charges, machine mixing, centering, laying in position, curing etc., complete.

0.39

5040

1966

... More
boq;Construction of RR Masonary in CM (1:8) prop including cost and conveyance of all materials and labour charges etc complete.

2.37

4403

10437

... More
boq;Construction of CRS Masonary in CM (1:8) prop including cost and conveyance of all materials and labour charges etc complete.

2.23

4937

11010

... More
boq;Laying of V.C.C. (1:4:8) using 40 mm m/c metal and OPC,coarse and fine aggregate with concrete mixture. All work upto plinth level including cost & conveyance of all materials, labour charges, machine mixing, centering, laying in position, curing etc., complete.

0.25

5040

1260

... More
boq;Plastering with CM 2 coats, 12 mm thick, base coat in CM (1:5), 8mm thick and top coat in CM (1:3), 4mm thick with sponze finishing. including cost & conveyance of all materials like cement, Sand,. Water, etc., to site all operational, incidental charges, labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves where ever necessary etc., complete for finished item of work for uneven surface of walls, (As per SS 904)

5.94

511

3040

... More
boq;BLD-CSTN-12-3-(170) ; Painting to walls with One coats of water proof cement paint of approved brand and shade over existing base coat of water based primer of exterior grade-2 of approved brand, making 2 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads & contractors profit for finished item of work as per SS 912 for external walls for:-External Colouring - Water proof cement paint m of work.

5.94

145

862

... More
boq;Earthwork excavation and depositting on bank with an initial lead of 10.00Mts and lift of 2.00Mts in loamy, Clayey soils, etc. complete for finished item of work.

6.91

419

2898

... More
boq;Supply and Filling of Sand in foundation trenches including cost & conveyance of all materials, labour charges, seigniorage charges etc., complete.

0.58

959

556

... More
boq;Laying of V.C.C. (1:4:8) using 40 mm m/c metal and OPC,coarse and fine aggregate with concrete mixture. All work upto plinth level including cost & conveyance of all materials, labour charges, machine mixing, centering, laying in position, curing etc., complete.

1.15

5040

5796

... More
boq;Construction of RR Masonary in CM (1:8) prop including cost and conveyance of all materials and labour charges etc complete.

5.18

4403

22811

... More
boq;Construction of CRS Masonary in CM (1:8) prop including cost and conveyance of all materials and labour charges etc complete.

3.89

4937

19206

... More
boq;Construction of Brick Masonry in Brick Masonry in CM (1:6) with 2nd class Bricks traditional size 23 x 11 x 7 cms including cost and conveyance of all materials and labour charges etc complete.

10.29

8084

83194

... More
boq;Supplying and fixing of MS Hollow Squre pipe i)M.S Hollow Square 50x50x2.5 mm Thick of Length = 6.0 mts (4 No's.), ii) M.S Hollow Square 50x50x2.5mm Thick of Length = 3.6 mts (3 No's),iii)M.S Hollow Square 25x25x2.5mm -LONG PIPE bottom iv)M.S Hollow Square 25x25x2.5mm -verical long bars supporting including cost and conveyance of all materials ,Locking arrangment, Ornamental pieces etc ,cutting, bending, welding including all operational charges and all labour charges etc., complete for finished item of work.

140

128

17920

... More
boq;Roofing: - Roofing will be provided with 0.5mm thick galvanized / pre painted G.I. profiled sheets fixed to the purlins with 14 size self-drilling screws with neoprene washer. Side laps are stitched with self tapping/ drilling screws. End laps are to be sealed with 25x3 mm Butyl tape. The sheets are provided with anti-capillary grove.

24.3

922

22418

... More
boq;BLD-CSTN-8-6-(81) : Plastering with 15mm thick in single coat in CM (1:4) finished smooth including cost and conveyance of all materials to site, finishing, curing, scaffolding and all operational, incidental, labour charges etc., including cutting grooves where ever necessary etc., complete for finished item of work. (As per SS 903). per 1 Sqm. (External walls).

42.17

218

9203

... More
boq;BLD-CSTN-8-4-(79): Plastering with 12mm thick in single coat in CM (1:6) finished smooth including cost and conveyance of all materials to site, finishing, curing, scaffolding and all operational, incidental, labour charges etc., including cutting grooves where ever necessary etc., complete for finished item of work. (As per SS 903). per 10 Sqm.

45.81

185

8510

... More
boq;BLD-CSTN-12-1-(168) : Painting to new walls with 2 coats of ready mixed oil bound wahsable distemper of approved brand and shade over a base coat of appropriate primer of approved brand, making 3 coats in all to give an even shade after thourughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 911 for internal walls

87.98

218

19201



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.