Municipality Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Municipality Tender

Works
Opening Date22 Feb 2024
Closing Date28 Feb 2024
Tender Amount₹ 4,21,701 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Development of Nursery;Mixing of sandy soil and FYM in 5:1 proportion (50 % of volume of bed) with exacavated soil and refilling the bed and levelling.

35

14

502.25

... More
Development of Nursery;Covering the beds with dried grass and leaf litter and burning them to ash which can form the upper layer

35

16

574

... More
Development of Nursery;Cost of seed - seed weight, germination percentage and target of planting stock of individual species are to be taken into consideration while estimating the requirement of seeds

59500

40000

23800

... More
Development of Nursery;Sowing of seed (finer seeds like Adina, Mitragyna, Anthocephalus etc. to be mixed with sand and broadcast - Bigger seeds to be dibbled in lines 1-2 cm apart) and covering the bed to a thickness of 2.5 cm with paddy hay including cost and conveyance

35

16

572

... More
Development of Nursery;Watering the primary nursery beds with rose water cans twice daily for a maximum period of 2 months.

35

18

643

... More
Development of Nursery;Cost of chemicals, fungicide and insecticide

59500

1000

595

... More
Development of Nursery;Site preparation for Old Site - Clearing of growth, weeds, grass etc.,

59

17

1034

... More
Development of Nursery;Cost of Gusseted Polybags (including the cost of certification): To ensure quality control, the quality of bags have to be certified by CIPET (Central Institute of Plastic Engineering & Technology), Hyderabad at the cost of tenderer by taking samples from various lots of gussetted polybags.

203

153

31059

... More
Development of Nursery;Cost and Transport of ingredients for Potting Mixture: Red Soil, tank-silt, FYM in 2:1:1 ratio. To this soil mixture, 220 gm of Indophyll M-45, 4.5 kg of single super phosphate (SSP) and 250 gm of phorate granules per 1 cum of potting mixture will be added. Cost of chemicals is as per actuals

59500

434

25879

... More
Development of Nursery;For every extra km beyond 5 km up to 25 km

59500

193

11489

... More
Development of Nursery;Preparation of Potting Mixture by powdering of various ingredients, sieving and mixing them in prescribed proportion; opening of bags and filling with potting mixture and gently pressing the same with finger tips and arranging in beds.

59500

1260

75003

... More
Development of Nursery;Alignment of beds including alignment of inspection paths etc

35

10

352

... More
Development of Nursery;Pricking out seedlings from primary beds and transplanting into polybags

35700

186

6645

... More
Development of Nursery;Sowing /dibbling of pre-treated seeds (e.g. Yegisa, Nalamadi,Yerumaddi etc.) directly into bags including cost of treatment

23800

110

2636

... More
Development of Nursery;Watering the plants twice a day from October - March

35

361

63229

... More
Development of Nursery;Weeding to be done for every 2 months from the date of transplantation up to March ( Three Times)

35

66

4645

... More
Development of Nursery;1st shifting and grading after three months and consecutive shifting and grading after every two months till the nursery stock is lifted ( Three Times)

35

309

21694

... More
Development of Nursery;Replacement of casualties after sorting out the empty bags and keeping at one end of the bed (maximum 10% of total stock is permissible)

4

87

352

... More
Development of Nursery;Cost of foliar nutritient formulations like multiplex or NPK-19:19:19; fungicides and insecticides

59500

2000

1190

... More
Development of Nursery;As per actuals with a maximum limit of Rs. 2000/ per 1 lakh polybag seedings

35

45

1584

... More
Development of Nursery;Cost of Protection: One Nursery Watcher is allowed up to1 lakh RT nursery or 100 secondary beds of polybags / 100 Teak beds of 10 m x 1 m size or combination of both. One additional Nursery Watcher is permitted for nurseries having more than 1 lakh upto 3 lakh RT seedlings or more than 100 upto 300 secondray beds or Teak beds of 10 m x 1 msize or combination of both. For more than 3 lakh RT or 300secodary beds of Teak beds or combination of both anotheradditional Nursery Watcher is allowed. While calculating the number of Nursery Watcher, care shall be taken to include the nursery raising under all Schemes at a particular site. No extra Nursery Watcher is allowed for primary beds of 1 m x1 m size. However, the above narrative is subject to the provisions cited under general instructions.

8

9654

77237

... More
Development of Nursery;CONVERSION of Root Trainer plants or 4"x7" or 5"x9" or 6"x8" bag-plants into higher size bags - to be done during May-June and September - October. At the time of conversion, the height of the plants should be at least above 0.45m in height (excluding the height of polybag).

9000

464

4184

... More
Development of Nursery;Preparation of Potting Mixture by powdering of various ingredients, sieving and mixing them in prescribed proportion; opening of bags and filling with potting mixture and gently pressing the same with finger tips and arranging in beds.

9000

2243

20188

... More
Development of Nursery;Cost & Transport of ingredients for Potting Mixture: Red Soil, tank-silt / claey soil, FYM in 2:1:1 ratio. To this soil mixture, 220 gm of Indophyll M-45, 4.5 kg of single super phosphate (SSP) and 250 gm of phorate granules per 1 cum of potting mixture will be added. Cost of chemicals is as per actuals.

9000

4753

42778



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.