Municipality Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Municipality Tender

Works
Civil And Construction
Civil Works Others
Opening Date28 Feb 2024
Closing Date2 Mar 2024
Tender Amount₹ 5,03,807 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Completion of incomplete works to Crematoria;Labour charges for Fixing of Ceiling fan and regulator including transportation and giving connections with twin core wire etc., complete.

1

206

206.76

... More
Completion of incomplete works to Crematoria;SSupply of 36" (900mm) Sweep 5 Star rated Ceiling Fan without Regulator of makes Crompton High Speed Decora / Bajaj Regal star / Havells Fusion 50 / Orient Summer Crown / Usha technix decorative

1

3538

3538.93

... More
Completion of incomplete works to Crematoria;Supply and fixing SPN Distribution board with IP-20 protection suitable for single phase Earth Leakage Circute Braker (ELCB) / Residual Current Circute Braker (RCCB) / Double Pole (DP) Isolator as incomer and 10kA SP MCBs as out going including internal connections and labour charges for surface / flush mounting etc., complete.

1

4845

4845.11

... More
Completion of incomplete works to Crematoria;Supply and run of 1 of 14 /0.3mm (1.0 Sq.mm) FR P.V.C. insulated flexible copper cable in existing pipe for earth continuity including all labour charges etc., complete.and as per 3.1.2 of Sta revised data of BLD -TBSE-3-1-2

135

26

3615.3

... More
Completion of incomplete works to Crematoria;Supply and run of 2 of 36/0.3mm (2.5 Sq.mm)Finolex F.R P.V.C. insulated flexible copper cable in existing pipe for mains inlcuding all labour charges etc., complete.

180

107

19301.4

... More
Completion of incomplete works to Crematoria;Supply and fixing of batten holder / slanting holder in lieu of ceiling rose of light point complete with all connections and all labour charges with 40W bulb (for new installation).

4

348

1395.2

... More
Completion of incomplete works to Crematoria;Supply and errecting of 6A 3 Pin triangle deluxe ISI approved including giving connections and cost and conveyance of all materials and labour charges etc., complete (2 in 1 Points)

10

152

1527.3

... More
Completion of incomplete works to Crematoria;Wiring with 2x1.0 Sq.mm (14/0.3mm) PVC insulated flexible copper (Phase, Neutral, earth) cable in the existing metallic/ Non-metallic conduit pipe with 6A flush marked switch, ceiling rose and 3mm thick Hylum sheet covering to Switch control box including all labour charges etc., complete for Lights, Bell & Exhaust Fans points in the non-residential buildings except circukt mains

15

594

8924.4

... More
Completion of incomplete works to Crematoria;Supply and Fixing of 25mm dia 1.5mm thick surface P.V.C. pipe (ISI MARK) with all accessories fixing on chromium plated metallic base saddles including all labour charges etc., complete for run of mains and as per 1.3.2 of Sta revised data of BLD -TBSE-1-3.2

60

104

6253.8

... More
Completion of incomplete works to Crematoria;Supply and Fixing of 25mm dia 2mm thick PVC pipe (ISI MARK) concealed in Roof Slabs with all required accessories including masonary work and labour charges etc., complete.

60

106

6367.2

... More
Completion of incomplete works to Crematoria;Supply & Manufacture of Gate to specified design and labour charges for fabricating steel works like window Grills, Compound wall Grills, Iron Doors, Windows including cost of welding rods, power charges, excluding cost of fixing in position.

270

120

32516.1

... More
Completion of incomplete works to Crematoria;Providing high yield strength deformed (HYSD) steel bars (Fe 415 grade as per IS 1786-1985) of different diameters, cutting, bending, to required sizes and shapes placing in position with cover blocks of approved size and binding wire of 20SWG, forming grills for reinforcement work as per approved designs and drawings including cost and conveyance of bars from approved sources to site of work, including cost and conveyance of binding wire, cover blocks and all operational, incidental, and labour charges such as cutting, bending, placing in position, tying etc., and sales & other taxes,on cost of all materials complete for finished item of work (APSS No.126) in all floors. Including overhead charges & Contract profit but excluding GST.

0.1

89335

8933.55

... More
Completion of incomplete works to Crematoria;Painting to New wood work and flush shutters with painting two coats of synthetic enamel paint 1st grade of approved brand and shade including cost and conveyance of all materials to site cost of primer coat and all labour charges etc. complete including applying sand paper on lappam coats for neat finish including sales & other taxes on cost of all materials etc. complete (APSS No.1200, 1207 & 1211) in all floors.

4.96

2293

1137.47

... More
Completion of incomplete works to Crematoria;Painting to walls with water proof cement paint of apporved brand and shade over a base coat of approved cement primer grade I making making 2 coats in all to give an even shade after thourughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 912 for internal walls. Including overhead charges & Contract profit but excluding GST.

552.2

2203

121693.28

... More
Completion of incomplete works to Crematoria;Flooring with ceramic tiles, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete for finished item of work, but excluding the cost of conveyance of all materials. Including overhead charges & Contract profit but excluding GST & Seigniorage

1.94

8141

1579.54

... More
Completion of incomplete works to Crematoria;Dadooing to walls with coloured glazed tiles 1st. quality of any size of brand as approved by Engineer - in - charge and set over a base coat of CM (1:5), 12mm thick and neat cement paste at the rate of 3.3 Kg/Sqmt. and jointed with white cement paste mixed with pigment of matching shade including cost and conveyance of all materials like cement, fine sand (screened), water, tiles, etc. to site, such as mixing of cement mortar, laying in position, curing, lift charges etc., complete for finished item of work (APSS No.701 & 707) Including overhead charges & Contract profit but excluding GST & Seigniorage

39.35

7875

30988.13

... More
Completion of incomplete works to Crematoria;Providing skirting to internal walls to 10 cm height/risers of steps with 10 mm thick polished Shahabad stone length equal to flooring stones, set over base coat of CM (1:3) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like Shahabad stone, cement, sand and water etc., complete including seigniorage charges, etc., complete for finished item of work

12.65

121

1533.43

... More
Completion of incomplete works to Crematoria;Flooring with 15-18mm thick polished shabad stones set over base coat of CM (1:8) over already laid CC bed / RCC Roof Slab, including neat cement slurry of honey like consistency spread @ 3.3 kgs per sqm. & Jointed with neat cement to full depth including cost of all materials like cement, sand, and water and flooring stones etc., complete, including seigniorage charges, labour charges for dressing of flooring stones etc., complete for finished item of work, but excluding the cost of conveyance of all materials.

28.65

8298

23776.32

... More
Completion of incomplete works to Crematoria;Plastering with CM 2 coats, 20 mm thick, base coat in CM (1:6), 16mm thick and top coat in CM (1:4), 4mm thick with Dubara sponze finishing. including cost and conveyance of all materials like cement, sand, water etc., to site, all operational, incidental and labour charges such as mixing mortar, scaffolding charges, lift charges, including cutting of Grooves wherever necessary as directed by Engineer - in - charge, finishing, curing, etc., complete for Even Surfaces of Wall for finished item of work. (APSS 901,903 & 904). Including overhead charges & Contract profit but excluding GST & Seigniorage Out Side Plastering

264.12

4579

120958.51

... More
Completion of incomplete works to Crematoria;Oranamental plastering to ceiling 12mm thick in CM(1:4) with dubara sponge finich including cost and conveyance of all materials like cement sand water etd to site including seigniorage charges sales & other axes on all materials all operational incidental and labour charges such as mixing motor finishing scafolding lifg charges cutting of grooves where ever necessary as directed by Engneer-in- charge curing etc., complete for finished item of work (APSSNo.901 &903 &904). Ceiling

78.63

5196

40858.82

... More
Completion of incomplete works to Crematoria;Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site, all operational, incidental and labour charges such as mixing mortar, scaffolding charges, lift charges, including cutting of Grooves wherever necessary as directed by Engineer - in - charge, finishing, curing, etc., complete for Even Surfaces of Wall for finished item of work. (APSS 901,903 & 904), Including overhead charges & Contract profit but excluding GST & Seigniorage Internal Plastering.

53.76

5218

28054.87

... More
Completion of incomplete works to Crematoria;Providing and fixing 30mm thick Solid panel PVC door shutter consisting of frame made out of M.S. tubes of 19 gauge thickness and size of 19mm x 19mm for stiles, & 15mm x 15mm for top & bottom rails. M.S. frame shall have a coat of steel primers of approved make and manufacture. M.S. frame shall be covered with 5mm thick heat moulded PVC ?C? channel of size 30 x 50mm forming stiles, and 5mm thick, 75mm wide PVC sheets for top rail, lock rail & bottom rail on either side, and 10mm (5mm x 2) thick, 20mm wide cross PVC sheet as gap insert for top rail & bottom rail. Paneling of 5mm thick PVC sheet to be fitted in the M.S. frame welded / sealed to the stiles & rails with 30mm wide x 5mm thick PVC sheet beading on either side, and joined together with solvent cement adhesive etc. An additional 5mm thick PVC strip of 20mm width is to be stuck on the interior side of the ?C? Channel using PVC solvent adhesive. Complete as per direction of Engineer-incharge, anufacturer?s specification & drawing for finished item of work TBSC-L.III-01

4.41

2604

11483.9

... More
Completion of incomplete works to Crematoria;Providing impervious coat over RCC roof slab to required slopes with CM (1:3) prop. 20mm thick (average) mixed with water proofing compound manufactured by reputed manufacturers as approved by Engineer-in-charge at 1Kg/bag of cement, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm including cost and conveyance of all materials like cement, sand, water proofing compound, water etc., to site, all operational, incidental and labour charges such as mixing mortar, laying, rounding off at junctions of wall and slab, rendering smooth with thread lining, curing, lift charges, etc., complete for finished item of work (APSS No. 901 & 903). Including overhead charges & Contract profit but excluding GST & Seigniorage charges

3.83

5811

2225.79

... More
Completion of incomplete works to Crematoria;Roof slab

3.83

1684

6453.36

... More
Completion of incomplete works to Crematoria;Roof beams

0.29

14189

4114.96

... More
Completion of incomplete works to Crematoria;Item Detailed Specification Description

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.