For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Municipality Tender

Civil And Construction
Building Construction
Opening Date18 Apr 2023
Closing Date27 Apr 2023
Tender Amount₹ 19,67,584 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Community Hall W12;Supply, Transportation and fixing of following MS threaded Flanges 2 Nos with nuts and bolts including cost and conveyance of all materials, taxes etc., complete.50mm dia MS flanges set (2 Nos) 150mm dia OD, 12mm thick each flange with required dia bolts and nuts.

3

319

957

... More
Community Hall W12;Supply, Transportation and fixing of following MS threaded Flanges 2 Nos with nuts and bolts including cost and conveyance of all materials, taxes etc., complete.

6

438

2628

... More
Community Hall W12;As per SSR 2022-23 Pg-499/546:Manufacture, supply, & delivery of High Density Polyethylene pipes (PE-100 Grade) for water supply conforming to IS 4984-2016 including transportation to any where in T.G, etc., complete.(Supply upto 90 mm dia in coil & above 90 mm dia stright length in 6 M.)

70

188

13160

... More
Community Hall W12;Supply abd delivery of PVC insulated and PV sheated flexible 3 core flat type submersible cables suitable for submersible pumpsets conductors composed of ennealed high conductivity copper wire, conforming to IS 694 with its revisions and ammendments from time to time and delivery at site of installation of pumpset including freight and transit.

70

72

5104.4

... More
Community Hall W12;Supply and delivery of FRPP Flexible Conduit Pipe to encase the submersible cable Make: Precision or its equivalet

70

16

1120

... More
Community Hall W12;Supply and Transportation of control panel for single phase submersible motors up to 3 HP @ 220V 50Hz operating range between 80 to 240V including supply and fixing of Direct - on - Line LTLK / SIEMENS / CROMPTON make Volt meter and Ammeter with starting and running capacitors assembled with ISI mark contactors and fitted with Legrand make ISI mark MCB etc., complete.

1

7734

7734

... More
Community Hall W12;Supply and delivery,of submersible pumpsets suitable to 150mm dia Borewell coupled with motors Single phase 2880 RPM 340V(-15%+10% range-290 to 375 Volts) / 3 Phase 2880 RPM 400V(-15%+10% range-340 to 440 Volts) of reputed make with minimum overall efficiency of 40% at the duty point with Radial / mixed flow with a trail run of One week.The pumpset should confirm to IS 8034/2002 & 9283/1995 with up to date amendments with ISI mark and a guarantee period of 18 months from the date of installation. The rates are inclusive of , transportation, installation, errection of pumpsets and accessories etc, complete. Makes:Texmo / CRI / KSB / Aryan Varsha / Lubi 3.00 HP 5-10 Stage

1

31749

31749

... More
Community Hall W12;Investigation and Geologist Charges (Rate as per EEDR PH TS.No-1011/2018-19,Dt.19-02-2019)

1

1000

1000

... More
Community Hall W12;SSR-2022-23 Pg:508/546:Manufacture, Supply and Delivery of Unplasticised PVCs Pipes for potable water supplies conforming to IS :4985/2000 (3rd revision) with bell ends (Socket) as per specification in light Grey/Natural Ivory Grey/ Any other Color (except White) inclusive of transportation to the sub-divisional stores anywhere in TG excluding Taxes.

30

688

20640

... More
Community Hall W12;Drilling of Bore well by down the hole hammer drilling to a finished dia of 112/165 mm dia in all formations suitable for down the hole hammer drilling such as medium hard rock formation to hard rock formation, all consolidated formation etc. and drilling in over burden to dia not less than 200 mm etc and reaming the bore well to suit insertion of suitable casing pipe etc., including insertion of casing pipe with couplings, caps any other relevant materials upto required depth as directed by the department including transportation of drilling rigs and supporting vehicle and including bore development (Flushing of Bore Well at an average pressure of 150 PSI) conducting yield test, consumables charges, Crew charges required in fixation of pipe assembly completely done to the satisfaction of the department and including all labour charges and but excluding the cost of casing pipe, couplings, cap etc., The entire work should be carried out as per IS -2800 Part I & II 1979 and amended from time to time. depth upto 0 to 90.0 Mtrs

70

300

21000

... More
Community Hall W12;Providing Circular Rings for Septic Tank for stocking sewerage with a weight of 25-100 kg and thickness 40-50mm with 1000mm dia

7

800

5600

... More
Community Hall W12;Plastering with 20mm thick in single coat in CM (1:4) finished smooth including cost and conveyance of all materials to site, seigniorage charges on all materials, finishing, curing, scaffolding and all operational, incidental, labour charges etc., including cutting grooves where ever necessary etc., complete for finished item of work. (As per SS 903). per 10 Sqm.

0.01

268

2.68

... More
Community Hall W12;Using Concrete mixture all works up to Plinth Level: Plain Cement concrete nominal mix (1:5:10) prop (Cement : fine aggregate: coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , seigniorage charges on all materials, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed.

0.03

4384

131.54

... More
Community Hall W12;Septic Tank: Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work including seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308).

1.08

258

278.7

... More
Community Hall W12;Providing & Placing on Terrace (at all floor levels) polyethylene water storage tank with Double layer approved brand & manufacture with cover and suitable locking arrangement & making necessary holes for inlet & outlets and over flow pipes but without fittings & base support for tanks

1000

10

10230

... More
Community Hall W12;Supplying & fixing GI pipe Medium Grade as per IS 1239 ISI mark in ground or on wall including cost of tees, elbows, bends, reducers, couplings, running joints, union flanges, unions etc. with necessary excavation in all types of soils except rock requiring blasting, refilling, chasing masonry walls and making good the walls & floors to the originals, surface and fixing MS clamps of TW block on walls, including cost and conveyance of all materials and labour charges complete for finished item of work.

30

220

6612.3

... More
Community Hall W12;Providing 110 mm Dia ISI marked P.V.C.down water take pipes 2.5mm thick 4kg/sq.cm pressure of ISI marked including cost of necessary PVC Bends, shoes, iron / PVC clamps and all other accessories and fixing in position including cost and conveyance of all materials, sales & other taxes on materials to site, operational & incidental charges including all labour charges for fixing at site etc., complete for finished item of work. (APSS No. 1328)

30

370

11128.5

... More
Community Hall W12;Supplying, laying, jointing and testing 101.6 mm SWG SP-1 pipes of ISI make conforming to ISI 651 & 4127 with airtight cement joints in CM 1.5:1 prop. Including excavation of trenches and socket pits in any soil (except rock requiring blasting) up to 1524 mm(5'0") depth and refilling with watering and tamping.

30

651

19530.3

... More
Community Hall W12;S&F of 15 mm brass body CP finish bib tap of not less than 300 grams weight screw type (full turn) with internal /external threaded connection conforming to IS 8931

2

296

593.08

... More
Community Hall W12;S&F Stainless steel 4" dia round Grating with frame for nahany or floor trap cover with or without hole.

2

77

154.52

... More
Community Hall W12;Supplying & fixing 150 mm x 100 mm SWG gully traps conforming to ISI 651 & 4127 with C.I Grating & Cost. Brick masonry in CM 1:6 prop. Intermediate chamber and fitted with 304.8 mm x 288.6mm (12"x9") C.I Frame and hinged cover

2

820

1640.6

... More
Community Hall W12;S&F CP finish brass body 32 mm dia nominal size waste coupling with half/full thread & brass check nut conforming to IS 2963: 1979-Urinals

2

316

633.98

... More
Community Hall W12;Supplying & Fixing 450 x 300 mm - Indian make Flat Back Wash Hand Basin (HSW/Parryware/Neycer) 1st quality conforming to IS:2556-Part-4:1972 with waste fittings like rubber plug, chain, 32 mm nominal size C.P. Fitting with parallel pipe thread conforming to IS:2963-1979 and fitted with 15 mm nominal bore Chromium Plated Pillar Tap of 1st quality Indian make 400 grams Seiko/ Senior/ Nice/ Esso or equivalent complete with standard CI brackets including wooden block: Single C.P. Pillar cock

2

1653

3306.2

... More
Community Hall W12;Supply & fixing white glazed European water closet with variety as approved by Engineer-in-charge, P" or S" trap with 4" CI outlet pipe of approved make, plastic seat and lid for EWC and rubber buffers as per ISI 2548 1963 with and low down porcelain flushing tank with lid 10 Lit Capacity with internal components and fixed with wooden gutties with required size nails, 32mm dia short CP bend, 15 mm PVC connections with brass union nuts and 12.70 mm (1/2")NP stop cock heavy duty (300 grams), complete including cost and conveyance of all materials to site, for finished item of work for all floors.

1

7836

7836.03

... More
Community Hall W12;Internal Water Supply and Sanitary arrangements:Providing and fixing 23" (584.2mm) long white glazed Indian WC Orissa pan of parry/Neycer/HSW make with P or S trap with brick masonry seat, CC squatting plate as approved by Engineer-in-charge, W.C. shall be encased on CC (1:2:4) 6? alround well above the joint to stop leakage at the joint etc., complete including cost and conveyance of all materials to site, cost of CC bed, labour charges and segniorage charges etc., complete for finished item of work.

1

2258

2258.67

... More
Community Hall W12;Providing independent earthing for Important equipment with 40mm dia 'B' class 2.5m long G.I pipe and 19mm dia 'B' class G.I pipe of 0.3mtr. long connected with reducer providing G.I funnel with mesh enclosed in C.C/ brick massonry chamber of 450m x 450m x 400mm with R.C.C. Slab cover duly providing staggered holes filling with 20Kg Salt and 40Kg Charcoal or 40Kg bentonite powder from the bottom of the pipe giving earth connection from electrode through G.I strip of 40 x 6mm x 200mm length with all accessories and labour charges complete, as per IS specifications 732/1982 (Part II)

1

5836

5836

... More
Community Hall W12;Supply and run of 2 of 36/0.3mm (2.5 Sq.mm) F.R P.V.C. insulated flexible copper cable in existing pipe for mains inlcuding all labour charges etc., complete.

30

93

2801.7

... More
Community Hall W12;Supply and run of 1 of 14 /0.3mm (1.0 Sq.mm) FR P.V.C. insulated flexible copper cable in existing pipe for earth continuity including all labour charges etc., complete.

60

22

1346.4

... More
Community Hall W12;Supply and fixing of 16A 3pin / 6A 3pin plug socket with indicator lamp and 16Amps fuse unit and 16 Amps switch control (5 in one) on decolam sheet covered board including earth connection and all labour charges etc., complete on wall.

1

261

261.6

... More
Community Hall W12;Wiring with 2 runs of 14/0.3mm (1.0 Sq.mm) Fire Retardant (FR) P.V.C. insulated flexible copper cable (ISI MARK) in existing pipe with 6A switch, Ceiling rose and 3mm thick hylam sheet covering to switch control box including all labour charges etc., complete for light, bell, fan and exhaust fan points in Non-Residential Buildings

2

530

1060.88

... More
Community Hall W12;Supply of 28W T5 fluorescent tube.Makes : Crompton / Bajaj / Phillips /Surya / Havells.

1

107

107

... More
Community Hall W12;Supply of 18W Pin type CFL Lamp.Makes : Phillips / Crompton / Bajaj /Surya / Havells / HPL / Halonix

1

103

103

... More
Community Hall W12;Supply and fixing of batten holder / slanting holder in lieu of ceiling rose of light point complete with all connections and all labour charges without 40W bulb (for new installation).

2

248

497.6

... More
Community Hall W12;Supply and Fixing of 20mm dia1.5mm thick P.V.C. pipe (ISI MARK) concealed in wall with all required accessories including masonary work for light, fan and separate plug point with well seasoned wooden deep box including all labour charges etc., complete.

30

83

2493

... More
Community Hall W12;Internal Electrification: Supply and Fixing of 25mm dia 2mm thick PVC pipe (ISI MARK) concealed in Roof Slabs with all required accessories including masonary work and labour charges etc., complete.

30

84

2535.9

... More
Community Hall W12;S&F of pre-cast RCC Grills of any design of 50 mm thick manufactured with M-30 grade of concrete using vibro- compaction process using joint less FRP moulds to achieve shuttering finish and adequately reinforced for long use and to prevent damage during handling, transportation & erection etc

0.54

728

393.27

... More
Community Hall W12;Dadooing to walls with plain white glazed wall tiles of any size and of 5 to 7 mm thick set over a base coat of CM(1:3) Prop. 12mm thick and neat Gray cement slurry of Honey like consistancy sread at the rate of 3.30 Kg of cement per One Square Meter and jointed wiyh neat White cement paste mixed with pigmant of matching shade including cost and conveyance of all materials like cement, sand, water, flooring Tiles etc. to site, all operational, incidental and labour charges such as mixing of cement mortar, laying, jointing, curing, lift charges etc., complete for finished item of work (for toilets)

26.27

594

15611.47

... More
Community Hall W12;Flooring with Non-skid red or white full body Ceramic floor tiles of size 300 x 300 mm and thickness between 7-8 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and design, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete, including seigniorage charges, etc., complete for finished item of work,including the cost and conveyance of all materials.

12.6

920

11599.69

... More
Community Hall W12;Providing of 35mm thick Factory made Prelaminated ABS (Acrylonitrile Butadiene Styrene) Door shutter mouldedin different designs, consisting of all round Frame made out of water proof solid foam PVC bar of size 20x32mm,reinforced by 32x 32mm - 2 nos. for vertical made out of LVL (Laminated Veneer Lumber),core material of 32 mm thick high density craft paper honey comb board, sandwiched on both sides with prelaminated ABS sheetthickness of 1.5mm . PVC edge banding of size 0.45mmon the vertical sides for each shutter and ISI make S.S round lock complete for finished item of work .

2.7

7515

20292.2

... More
Community Hall W12;Providing and fixing factory made solid Wood Polymer Composite (WPC) single extruded Door Frame section of100*65 MM with encapsulation of 6 MM rigid layer on all external surfaces. The door frame will have a rebate of32MM/ 37 MM. The two Vertical members are to be joined together with the horizontal member using 8x75 MM long MS Star full thread screws to be used withreverse forward speed control hand drilling machine. The ready/assembled door frame is fixed to wall using Z Hand fast 300 MM long hold fast.

9.9

850

8424.7

... More
Community Hall W12;Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) / Mild steel (MS) steel bars (Fe 415/ Fe 500 grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc., complete for finished item of work in all floors.( APSS No.126

120

88

10618.8

... More
Community Hall W12;Colour washing two coats with approved Colour and quality to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work, but excluding conveyance charges of materials

66.01

69

4570.53

... More
Community Hall W12;White washing two coats with whiting of approved quality to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work, but excluding conveyance charges of materials

66.01

46

3047.02

... More
Community Hall W12;Plastering with 12mm thick in single coat in CM (1:4) finished smooth including cost and conveyance of all materials to site, seigniorage charges on all materials, finishing, curing, scaffolding and all operational, incidental, labour charges etc., including cutting grooves where ever necessary etc., complete for finished item of work. (As per SS 903).

37.03

188

6965.34

... More
Community Hall W12;Plastering with 15mm thick in single coat in CM (1:4) finished smooth including cost and conveyance of all materials to site, seigniorage charges on all materials, finishing, curing, scaffolding and all operational, incidental, labour charges etc., including cutting grooves where ever necessary etc., complete for finished item of work. (As per SS 903).

28.98

190

5533.15

... More
Community Hall W12;11.5 cm wide Brick masonry for super-structure on ground floor in cm (1:3) using second class traditional size bricks including cost of all materials, seigniorage charges, labour and all operations for constructing half brick masonry, mixing cement mortar, curing etc., complete for finished item of work, but excluding conveyance charges of materials.

12.35

970

11982.34

... More
Community Hall W12;Brick Masonary 2nd Class Ground moulded or treditional size 23x11x7 Cm in Cement Mortor 1:6 Prop including Cost & conveyance of all Materials like Cement, Sand, Bricks, Water, etc., to site cost of Seigniorage charges on all materials, including all labour charges like mixing Cement Mortor, scaffoding charges lift charges , curing charges etc., complete for finished item of work

4.76

7761

36946.41

... More
Community Hall W12;Supply and placing of the M-20 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. for RCC LINTEL.

0.13

10331

1343.16

... More
Community Hall W12;Supply and placing of the M-20 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. for RCC ROOF SLABS.

1.37

11391

15607.03

... More
Community Hall W12;Filling with Gravel in trenches,sides of foundations and basement with initial lead in layers not exceeding 15cm thick,watering and ramming including cost and conveyance of water to work site and all peraitonal,incidental,loabour charges,hire charges of T&P etc., and overheads & contractors profit complete for fnished item of work(APSS NO.309&310)

1.97

358

707.21

... More
Community Hall W12;Filling with useful available excavated earth (excluding rock) in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

6.34

36

232.23

... More
Community Hall W12;Construction of RR Masonary in Cement Mortor ( 1:6 ) Prop using hard granite stone including cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones, including Seigniorage Charges on all Materials, ,labour charges for cutting Stones to required size and shape, mixing of Cement Mortor ,Construction, Scaffolding Charges curing etc., complete for finished item of Work

2.03

4315

8760.77

... More
Community Hall W12;Random Rubble stone masonry in CM (1:8) prop: (Cement: Sand) using hard granite stones carted from approved quarry including cost and conveyance of all materials like cement, sand, water, stones etc., from approved quarry, to site and including seigniorage charges, sales & other taxes on all materials including labour for cutting stones to required size and shape, mixing, of cement, mortar, construction, curing etc.,and overheads & contractors profit complete for finished item of work in foundation and basement

3.92

4281

16782.74

... More
Community Hall W12;Plain Cement Concrete (1:5:10) (cement: fine aggregate: Coarse aggregate) for foundations and under flooring bed using coarse aggregate 40mm size hard , machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including seigniorage charges, sales & other taxes on all materials and including all charges for machine mixing, laying concrete in foundations and under flooring bed, ramming in 15 cm layers finishing top surface to the required level curing etc.,and overheads & contractors profit complete for finished item of work. (APSS No. 402)

1.54

4384

6752.31

... More
Community Hall W12;Filling with Stone Dust (below 2.36mm stone chips) in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

1.21

1191

1441.49

... More
Community Hall W12;Earth work excavation Hard rock (blasting prohibited)-Up to 3 m depth using Hydraulic Excavator with Breaker Attachment for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring,sheeting, planking, strutting, etc. complete for finished item of work excluding seigniorage anf dewatering charges etc as per SS - 20 B (APSS 308).

1.85

2202

4074.57

... More
Community Hall W12;Toilet Block: Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work including seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308).

7.42

258

1914.81

... More
Community Hall W12;Supply, Transportation of energy efficient fan, 1200 mm sweep, aluminium body, consuming 28 W, BEE 5 star rated, ceiling fan with Brush Less Direct Current(BLDC)motor, class of insulation: B, 3 no's blades, 30 cm long down rod, 2 no's canopies, shackle'kit, safety rope, copper winding, Power Factor greater than 0.90, Service Value (CMMAV) greater than 8.5,Air delivery minimum 235 CMM, 350 RPM(tolerance as per IS:374-2019), THD less than 10%. single phase AC supply, earthing etc., including all standard accessories etc., complete.Makes : Atomberg (Efficio ) / Havells /Orient

3

2882

8646

... More
Community Hall W12;Supply and fixing SPN Distribution board with IP-43 protection (Metal Door) suitable for single phase ELCB / RCCB/DP Isolator as incomer and 10kA SP MCBs as outing going including internal connection and labour charges for surface / flush mounting etc., complete. 40A DP Isolator/ RCCB / ELCB - 1 No 6-32A SP MCBs - 4 Nos

1

4575

4575

... More
Community Hall W12;Supply and Run of 2 of 6 Sq.mm WPSC Aluminium cable along with No.10 SWG G.I bearer wire through PVC cleats with all accessories including labour charges etc., complete for service mains.

60

66

4008

... More
Community Hall W12;Supply and run of 1 of 14 /0.3mm (1.0Sq.mm) FR P.V.C. insulated flexible copper cable in existing pipe for earth continuity including all labour charges etc., complete.

60

22

1346.4

... More
Community Hall W12;Supply and run of 2 of 22/0.3mm (1.5 Sq.mm) F.R P.V.C. insulated flexible copper cable in existing pipe for mains inlcuding all labour charges etc., complete.

60

66

3985.8

... More
Community Hall W12;Supply and run of 2 of 36/0.3mm (2.5 Sq.mm) F.R P.V.C. insulated flexible copper cable in existing pipe for mains inlcuding all labour charges etc., complete.

60

93

5603.4

... More
Community Hall W12;Supply and fixing of 6A 3 pin wall plug socket with 6A switch control on a common switch board with earth continuity including wire leads, earth connections along with all labour charges etc., complete.

4

138

555.48

... More
Community Hall W12;Supply of 18 WPin type CFL Lamp.Makes : Phillips / Crompton / Bajaj / Surya/ Havells / HPL / Halonix.

4

103

412

... More
Community Hall W12;Supply of 28W T5 fluorescent tube.Makes : Crompton / Bajaj / Phillips / Surya/ Havells.

4

107

428

... More
Community Hall W12;Supply and fixing of batten / slanting type 3 plate ceiling rose of light/fan point complete with all connections and all labour charges etc.

4

96

387.2

... More
Community Hall W12;Wiring with 2 runs of 14/0.3mm (1.0 Sq.mm) P.V.C. insulated F.R flexible copper cable (ISI MARK) in existing pipe with 6A switch, Ceiling rose and 3mm thick hylam sheet covering to switch control box including all labour charges etc., complete for light, bell, fan and exhaust fan points in Residential Buildings.

8

341

2734.96

... More
Community Hall W12;Supply and Fixing of 20mm dia1.5mm thick P.V.C. pipe (ISI MARK) concealed in wall with all required accessories including masonary work for light, fan and separate plug point with well seasoned wooden deep box including all labour charges etc., complete.

60

83

4986

... More
Community Hall W12;Internal Electrification:Supply and Fixing of 25mm dia 1.5mm thick PVC pipe (ISI MARK) concealed in Roof Slabs with all required accessories including masonary work and labour charges etc., complete.

60

84

5085.6

... More
Community Hall W12;Supplying and fixing of Unplasticised Poly Vinyl Chloride (UPVC) casement windows openable shutters duly manufactured using UPVC reinforced profiles of (48 mm x 60 mm)/ (58 mm x 60 mm) x 2.0 mm for outer frames, (64 mm x 60 mm)/(72 mm x 60mm) x 2.0 mm for mullion sections for two or more openable shutters and (78 mm x 60 mm)/(72 mm x 42 mm) x 2.0 mm for outward openable shutter frame or (70 mm x 60 mm)/ (72 mmx 42 mm) x 2.0 mm for inward openable shutter frame capable of mounting single glazing system structurally reinforced with hot dip galvanized up to 50 microns of minimum thickness of 1.2 mm prefabricated & welded through fusion welding the window sash shall be fitted with 5 mm thick clear float glass of reputedmake duly fixed with TPV Gaskets/ EPDM weathering seal resistant accessories for casement window friction stay hinges of stainless steel grade 304- 2 Nos., per sash, handle with mazak alloy casting 1 No. per sash, locking system suitably concealed 1 No., per sas provided with raiser wedges for smooth operation and the system is to be installed at the site using anchor fasteners, silicon rubber sealant, easy glazing/ deglazing at site etc., including cost and conveyance of all materials, accessories, labour charges for transportation, erection at site with templates for casement sizing complete for finished item of work

7.56

7129

53897.81

... More
Community Hall W12;Painting to new walls with 2 coats of plastic emulsion paint of approved brand and shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 911 for External walls

99.68

183

18299.25

... More
Community Hall W12;Painting to new walls with 2 coats of plastic emulsion paint of approved brand and shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 911 for Internal walls

254.7

182

46503.13

... More
Community Hall W12;Providing of 35mm thick Factory made Prelaminated ABS (Acrylonitrile Butadiene Styrene) Door shutter mouldedin different designs, consisting of all round Frame made out of water proof solid foam PVC bar of size 20x32mm,reinforced by 32x 32mm - 2 nos. for vertical made out of LVL (Laminated Veneer Lumber),core material of 32 mm thick high density craft paper honey comb board, sandwiched on both sides with prelaminated ABS sheetthickness of 1.5mm . PVC edge banding of size 0.45mmon the vertical sides for each shutter and ISI make S.S round lock complete for finished item of work .

1.89

7515

14204.54

... More
Community Hall W12;Providing and fixing factory made solid Wood Polymer Composite (WPC) single extruded Door Frame section of100*65 MM with encapsulation of 6 MM rigid layer on all external surfaces. The door frame will have a rebate of32MM/ 37 MM. The two Vertical members are to be joined together with the horizontal member using 8x75 MM long MS Star full thread screws to be used withreverse forward speed control hand drilling machine. The ready/assembled door frame is fixed to wall using Z Hand fast 300 MM long hold fast.

5.1

850

4340

... More
Community Hall W12;Supply and Fixing of Main Door with Double leaf shutter, Door with Sal/ Country Wood Frame of sections size 100mm x 125mm with Door Shutter 50mm thick Sal/ Country Wood including cost of fixtures such as Brass Tower Bolts 300mm long 4 Nos, Brass Handles 150mm long 2 Nos, 300mm long Brass Aldrops 2No, 125mm long Brass butt hinges 6Nos, Door stopper 2 Nos, Brass Hold fasts 4Nos 230mm long , Sales and Other Taxes, cost and convenyance of all materials to site all Labour charges such as Fixing of Door Frame and shutter Fixing in position , with Hardware fixtures etc., complete for finsihed item of work.

1

25994

25994.49

... More
Community Hall W12;Providing High Yield Strength Deformed (HYSD)/ Mild steel (MS) steel bars (Fe 500/550/550D) grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc., complete for finished item of work in all floors.( APSS No.126)

4156.6

88

367817.53

... More
Community Hall W12;Flooring with Nano polished /stain free soluble salt porcelain vitrified tiles screen printed of size 600 x 600 mm and thickness between 8-10 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc. including seigniorage charges, etc., complete for finished item of work, including the cost and conveyance of all materials

59.29

1073

63652.56

... More
Community Hall W12;Plastering with 12mm thick in single coat in CM (1:3) finished smooth including cost and conveyance of all materials to site, ,on all materials, finishing, curing, scaffolding and all operational, incidental, labour charges etc., including cutting grooves where ever necessary etc., complete for finished item of work. (As per SS 903). ( only for Ceiling)

59.29

183

10888.61

... More
Community Hall W12;Plastering with 12mm thick in single coat in CM (1:4) finished smooth including cost and conveyance of all materials to site, , finishing, curing, scaffolding and all operational, incidental, labour charges etc., including cutting grooves where ever necessary etc., complete for finished item of work. (As per SS 903)

95.73

172

16543.1

... More
Community Hall W12;Plastering with 15mm thick in single coat in CM (1:4) finished smooth including cost and conveyance of all materials to site, ,on all materials, finishing, curing, scaffolding and all operational, incidental, labour charges etc., including cutting grooves where ever necessary etc., complete for finished item of work. (As per SS 903).

99.68

188

18749.81

... More
Community Hall W12;Brick Masonary 2nd Class Ground moulded or treditional size 23x11x7 Cm in Cement Mortor 1:6 Prop including Cost & conveyance of all Materials like Cement, Sand, Bricks, Water, etc., to site cost of , including all labour charges like mixing Cement Mortor, scaffoding charges lift charges , curing charges etc., complete for finished item of work

17.47

7761

135599.52

... More
Community Hall W12;Carting away the surplus excavated earth from the work site with a lead of 5.0 km beyond initial lead including loading, unloading and conveyance but excluding stacking charges etc., complete for roads/drains- 1 cum

52.11

71

3699.81

... More
Community Hall W12;Filling with Gravel in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

33.06

358

11868.21

... More
Community Hall W12;Filling with useful available excavated earth (excluding rock) in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

56.71

36

2077.29

... More
Community Hall W12;Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering, shuttering charges etc.,complete but excluding cost of steel and its fabrication charges (APSS No. 402) with minimum cement content as per IS code for finished item of work. for RCC STAIR CASE.

1.61

10777

17352.27

... More
Community Hall W12;Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering, shuttering charges etc.,complete but excluding cost of steel and its fabrication charges (APSS No. 402) with minimum cement content as per IS code for finished item of work. for RCC ROOF BEAMS.

5.63

12063

67917.28

... More
Community Hall W12;Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering, shuttering charges etc.,complete but excluding cost of steel and its fabrication charges (APSS No. 402) with minimum cement content as per IS code for finished item of work. for RCC ROOF SLABS

8.6

11572

99524.7

... More
Community Hall W12;Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site , sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering and suttering charges etc.,complete but excluding seignorage charges, cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code for LINTELS.

0.25

10512

2628.15

... More
Community Hall W12;Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site , sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering and suttering charges etc.,complete but excluding seignorage charges, cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code for COLUMNS.

6.16

13117

80801.77

... More
Community Hall W12;Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site . sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering and suttering charges etc.,complete but excluding seignorage charges, cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code for PLINTH.

8.72

12759

111264.32

... More
Community Hall W12;Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site . sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering and suttering charges etc.,complete but excluding seignorage charges, cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code for PEDESTALS.

2.46

10690

26299.22

... More
Community Hall W12;Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site . sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering and suttering charges etc.,complete but excluding seignorage charges, cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code for FOOTINGS.

14.63

10130

148210.97

... More
Community Hall W12;Construction of CRS Masonary 2nd Sort in Cement Mortor ( 1:6 ) Prop using hard granite stone including cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones, including ,on all Materials, ,labour charges for cutting Stones to required size and shape, mixing of Cement Mortor, Construction, Scaffolding Charges curing etc., complete for finished item of Work .

5.05

4842

24452.3

... More
Community Hall W12;Construction of RR Masonary in Cement Mortor ( 1:8 ) Prop using hard granite stone including cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones, including ,on all Materials, ,labour charges for cutting Stones to required size and shape, mixing of Cement Mortor ,Construction, Scaffolding Charges curing etc., complete for finished item of Work .

13.77

4281

58953.64

... More
Community Hall W12;Using Concrete mixture all works up to Plinth Level: Plain Cement concrete nominal mix (1:5:10) prop (Cement : fine aggregate: coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , ,on all materials, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed.

15.09

4384

66163.92

... More
Community Hall W12;Earth work Excavation for Foundation Ordinary Soil-Manual Means-Upto 3 m depth: Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work excluding dewatering charges etc as per SS - 20 B (APSS 308).

108.82

258

28082.09



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.