Municipality Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
510371Bid Award Id
ViewTender No
E1/CBF/33/01/2023-24Tender Authority
Municipality ViewPurchaser Address
-Website
http://tender.telangana.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Construction of Kerbwalls,Filling of red soil and water supply fittings for plantation at Integrated;Supply of premium make CPVC Pipes of 28.60mm OD Pipe- SDR 13.5 TBSP-J.III-03
40
267
10680
... More
Construction of Kerbwalls,Filling of red soil and water supply fittings for plantation at Integrated;S& F 25 mm Nominal Bore GI pipe Light Grade properties & weight as per IS 1239 ISI mark with GI fittings including the cost of pipe & its fittings &labour charges complete TBSP-G.I-03
120
345
41446.8
... More
Construction of Kerbwalls,Filling of red soil and water supply fittings for plantation at Integrated;Painting to new walls with 2 coats of water proof cement paint of approved brand and shade over a base coat of approved cement primer grade I making making 3 coats in all to give an even shade after thourughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 912
78
245
19148.22
... More
Construction of Kerbwalls,Filling of red soil and water supply fittings for plantation at Integrated;Plastering with 12mm thick in single coat in CM(1:4) finished smooth including cost & Conveyance of all materials to site, seigiorage charges on all materials, finsihing, curing, scaffolding and all operational, incidental, labour charges etc., including cutting grooves where ever necessary etc., complete for finsihed item of work
126
181
22819.86
... More
Construction of Kerbwalls,Filling of red soil and water supply fittings for plantation at Integrated;BLD-CSTN-5-17-(55): Brick Masonry work in CM (1:6) prop with Flyash Cement solid blocks of size 290 x 112/100 x 140 mm for manufacturing of flyash solid blocks using flyash of 80 kgs, cement of 15 kgs. Gypsum of 5 kgs. and stone dust including cost and conveyance of all materials, labour charges, scaffolding and curing etc., complete with a compresive strength not lessthan 50 kg/sqm for walls for Superstructure Walls.
7.52
6973
52443.65
... More
Construction of Kerbwalls,Filling of red soil and water supply fittings for plantation at Integrated;(BLD-CSTN 3-2) - Plain Cement Concrete M10 Nominal Mix; using 40mm guage hard granite machine crushed metal including cost and conveyance of all materials to site, centering, machine mixing, lifts and delifts, leads, laying in position, compacting, curing, all labour charges, etc., complete as directed by the departmental officers.
5.01
5447
27290.02
... More
Construction of Kerbwalls,Filling of red soil and water supply fittings for plantation at Integrated;Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work including excluding dewatering charges etc as per SS - 20 B (APSS 308).
7.52
439
3305.12
... More
Construction of Kerbwalls,Filling of red soil and water supply fittings for plantation at Integrated;Item Detailed Specification Description
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements