For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Municipality Tender
Civil And Construction
Civil Works Others
Opening Date31 Jul 2024
Closing Date5 Aug 2024
Tender Amount₹ 9,70,908
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
532250Tender No
E1/303-08/NRPT/CH-BW/2024-25Tender Authority
Municipality ViewPurchaser Address
-Website
http://tender.telangana.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Balance work of community hall in ward 13;RCC M- 20 ( 1 : 1 1/2 : 3 ) Nominal mix ( cement: fine aggregate: course aggregate) corresponding to table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (course aggregate) from approval quarry including cost and conveyance of all materials and labour charges curing etc,complete.( Culverts ) for SLAB on Drain 150mm thick.
1.6
9673
15477.84
Balance work of community hall in ward 13;RBR-FNDN-4 :Providing PCC/VRCC M15 nominal mix (1:2.5:5) prop. ( cement : fine aggregate : coarse aggregate) using 20 mm size graded HBG crushed metal including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc.,to site seniorage charges on all materials, labour charges for mixing, laying concrete,raming in 15 cm layers finishing top surface to the required level curing etc., complete for finished item of work as directed by Engineer-in Charge for wearing coat ( Benching Concrete)
0.31
5239
1624.23
Balance work of community hall in ward 13;Plain Cement concrete nominal mix (1:3:6) prop (Cement : fine aggregate: coarse aggregate ) using 20mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , seigniorage charges on all materials, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed.
2.07
7997
16554.16
Balance work of community hall in ward 13;RBR-FNDN-4 :Providing PCC/VRCC M15 nominal mix (1:2.5:5) prop. ( cement : fine aggregate : coarse aggregate) using 20 mm size graded HBG crushed metal including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc.,to site seniorage charges on all materials, labour charges for mixing, laying concrete,raming in 15 cm layers finishing top surface to the required level curing etc., complete for finished item of work as directed by Engineer-in Charge( for drain bottom)
2.88
5441
15670.68
Balance work of community hall in ward 13;Using Concrete mixture all works up to Plinth Level: Plain Cement concrete nominal mix (1:5:10) prop (Cement : fine aggregate: coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , seigniorage charges on all materials, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed.
1.35
4478
6045.91
Balance work of community hall in ward 13;Filling with Stone dust in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)
0.68
1363
927.37
Balance work of community hall in ward 13;Earthwork in excavation for Drains as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH
8.1
270
2190.81
Balance work of community hall in ward 13;RBR-STCL-5 : Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202 MORD / MORTH
1.84
743
1368.7
Balance work of community hall in ward 13;BLD-CSTN-5-11 (49) : 11.5 cm wide Brick masonry for super-structure on ground floor in cm (1:3) using second class traditional size bricks including cost of all materials,labour and all operations for constructing half brick masonry, mixing cement mortar, curing etc., complete for finished item of work, but excluding conveyance charges of materials.
16
978
15649.44
Balance work of community hall in ward 13;Supply and transportation of 20W, +/ 10% , >/ 2300 lumens, 1200mm length LED light housing made with alluminium anodised body, wide operating voltage with PF=0.9, Surge protection: > 2KV, THD<10%, with inbuilt driver and frosted cover CCT: 3000K - 6500K as desired by the department as per IS, minimum CRI=80 etc., complete with 5 years warranty with BIS Certification with BIS Certification. LUMINAIRE MAKE: Phillips / OSRAM / GE Venture / Wipro / Crompton / Bajaj / Havells / Jaquar / IB LED / Panasonic / Halonix / HPL / Syska / Eveready / Surya / Keselec/ FIEM. LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA / OSRAM / SAMSUNG / LG LEDs.
10
733
7339.5
Balance work of community hall in ward 13;Supply and Fixing of 1200 mm (48") sweep 230V, A.C 50 Hz.Ceiling fan with 3 Blades and double ball bearings with all standard accessoriesand 400W Mini Modular Stepped type Electronic Regulator with Cover Frame including providing fan hook of 12/15mm dia M.S. rod / bar grouted in RCC slab with making the slab as original and 19/20mm steel tube down rod of one meter length with bolts & nuts duly painted with matching colour of fan etc,. complete
6
4094
24567
Balance work of community hall in ward 13;3 Plate Jumbo Ceiling Rose . Ref: ELEC - 1.7.1.m
20
26
522.6
Balance work of community hall in ward 13;BLD-ELEC-2-1-3 : Wiring with 2 of 22/0.3mm (1.5 Sq.mm) P.V.C. insulated F.R. flexible copper cable (ISI MARK) in existing pipe with 6A switch control and 3/2 pin sockets fixing on separate board including all labour charges etc., complete.
20
485
9717.8
Balance work of community hall in ward 13;BLD-CSTN-9-21 - (119) : Providing skirting to internal walls to 15 cm height/risers of steps with 8 mm thick mirror polished granite tiles of any shade length equal to flooring stones, set over base coat of CM (1:3) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., complete including seigniorage charges, etc., complete for finished item of work
6.03
4354
26258.06
Balance work of community hall in ward 13;BLD-CSTN-9-7-(105) :Flooring with High Polished Granite 16 to 18 mm thick up to 8'-00 (2.43 M) other than black / premium colours slabs set over base coat of cement mortar (1:8), 20 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like cement, sand water and tilesetc., complete, including seigniorage charges, labour charges for dressing of tilesetc., complete for finished item of work,including the cost and conveyance of all materials.
76.16
4682
356632.91
Balance work of community hall in ward 13;Painting to new walls with 2 coats of acrylic emulsion paint exterior grade with silicon additives having VOC (Volatile Organic Compound) content less than 50 grams/ litre of approved brand and shade over a base coat of approved water based Cement Primer of Exterior Grade- 2 making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads & contractors profit for finished item of work as per SS 912 for external walls for:-External Colouring - Plastic emulsion paint - 3 Coats.
604.48
275
166588.64