Municipality Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Municipality Tender
Civil And Construction
Building Construction
Opening Date31 Jan 2024
Closing Date7 Feb 2024
Tender Amount₹ 3,98,957
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
493678Tender No
E1/Srcl/E-PROC.25/2023-24/8, Dt: 29-01-2024Tender Authority
Municipality ViewPurchaser Address
-Website
http://tender.telangana.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Construction of Community hall;BLD-CSTN-6-6-(61) : Construction of CRS Masonary 2nd Sort in Cement Mortor ( 1:6 ) Prop using hard granite stone including cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones, including , ,labour charges for cutting Stones to required size and shape, mixing of Cement Mortor, Construction, Scaffolding Charges curing etc., complete for finished item of Work .
3.1
4666
14466
Construction of Community hall;BLD-CSTN-6-13-(68) : Construction of RR Masonary in Cement Mortor ( 1:8 ) Prop using hard granite stone including cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones, including Seigniorage Charges on all Materials, ,labour charges for cutting Stones to required size and shape, mixing of Cement Mortor ,Construction, Scaffolding Charges curing etc., complete for finished item of Work .
3.47
4075
14143
Construction of Community hall;RCC M20 for Sun shades of 0.60M width, 75mm th. at fixed end and 50mm th. at free end - up to 3.66m above GL
7.2
958
6899
Construction of Community hall;BLD-CSTN-3-13- ( 30 ) - C - Nominal mix: RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and charges, including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, but including centering and shuttering charges for RCC SLABS, BEAMS -WOODEN SCAFFOLDING Stair Case Waist Slab
1.11
10095
11206
Construction of Community hall;BLD-CSTN-3-13- ( 30 ) - C - Nominal mix: RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and charges, including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, but including centering and shuttering charges for RCC SLABS, BEAMS -WOODEN SCAFFOLDING ROOF BEAMS
3.07
11157
34254
Construction of Community hall;BLD-CSTN-3-13- ( 30 ) - C - Nominal mix: RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and charges, including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, but including centering and shuttering charges for RCC SLABS, BEAMS -WOODEN SCAFFOLDING ROOF SLABS
6.02
10750
64718
Construction of Community hall;BLD-CSTN-3-13- ( 30 ) - B- Nominal mix: RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and charges, including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, but including centering and shuttering charges for COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS - WOODEN SCAFFOLDING LINTELS
0.28
12070
3380
Construction of Community hall;BLD-CSTN-3-13- ( 30 ) - B- Nominal mix: RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and charges, including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, but including centering and shuttering charges for COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS - WOODEN SCAFFOLDING COLUMNS
3.89
12198
47453
Construction of Community hall;BLD-CSTN-3-13- ( 30 ) - A- Nominal mix: RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and charges, including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, but including centering and shuttering charges for FOUNDATIONS, PLINTH, PEDESTALS Plinth Beams
2.78
12916
35908
Construction of Community hall;BLD-CSTN-3-13- ( 30 ) - A- Nominal mix: RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and charges, including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, but including centering and shuttering charges for FOUNDATIONS, PLINTH, PEDESTALS Pedastals
1.15
10606
12198
Construction of Community hall;BLD-CSTN-3-13- ( 30 ) - A- Nominal mix: RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and charges, including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, but including centering and shuttering charges for FOUNDATIONS, PLINTH, PEDESTALS FOOTINGS
7.06
9911
69972
Construction of Community hall;BLD-CSTN-3-5 (22) -Using Concrete mixture all works up to Plinth Level : Plain Cement concrete nominal mix (1:4:8) prop (Cement : fine aggregate: coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site ,labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed.
8.29
4603
38163
Construction of Community hall;BLD-CSTN-2-1 (9): Earth work excavation in Ordinary Soil by Manual Means-Upto 3 m depth for structures in all types of soil as per drawing and technical specifications and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work excluding dewatering charges etc as per SS - 20 B (APSS 308).
4.64
270
1255
Construction of Community hall;BLD-CSTN-2-1 (9): Earth work excavation in Ordinary Soil by Manual Means-Upto 3 m depth for structures in all types of soil as per drawing and technical specifications and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work excluding dewatering charges etc as per SS - 20 B (APSS 308).
46.08
270
12463
Evaluation Notes How It Works ?
Potential Partner