Municipality Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Municipality Tender

Works
Civil And Construction
Road Construction
Opening Date10 Jan 2025
Closing Date20 Jan 2025
Tender Amount₹ 4,02,462 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Path Holes;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, but excluding centering, shuttering.

4.8

10628

51016.03

... More
Path Holes;Cutting road surface including stacking of excavated materialsfor pipe line trench work(Cutting C.C.Road Surface)

4.8

2664

12788.5

... More
Path Holes;Vaccum drying of freshly laid cement concrete floor using 100% air tight suction mat of suitable size and length, vaccum pump to maintain vaccum pressure 0.7-0.8 atmospheres as per the standard procedures floating with power floater, mechanically travelling,finishing with sound edges and corners including hire and operational charges of machinery,labour,fuel etc., complete for finished item of work as directed by Engineer-in-charge of the work( As per Quotation ).

37.5

75

2812.5

... More
Path Holes;Cement Concrete Pavement Construction of un-reinforced, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification

16.88

6423

108398.93

... More
Path Holes;BLD-CSTN-2-8 (16): Filling with dust in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309&310)

17.32

1045

18107.22

... More
Path Holes;Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with initial lift of 3 mts and lead up to 50m as per Technical Specification Clause 302.3 MORD.

17.32

305

5296.95

... More
Path Holes;Cutting road surface including stacking of excavated materialsfor pipe line trench work(Cutting C.C.Road Surface)

17.32

2664

46158.48

... More
Path Holes;Carting of surplus excavated earth from the site to a distance suitable including loading, unloading charges, cost & conveyance, dumping, labour charges, all leads & lifts and other incidental and operational charges etc., complete

5.76

72

419.33

... More
Path Holes;Plain Cement Concrete (M15)- Nominal Mix (1:2.5:5) Prop with 40,20,10 mm metal hand mixing including cost and conveyance of all materials and labour charges etc., complete for Concrete Bed.In Vent Portion(0.05+0.05)/2=0.05

0.36

5382

1937.52

... More
Path Holes;Plain Cement Concrete (M10)- Nominal Mix (1:3:6) Prop with 20mm metal hand/machine mixing including cost and conveyance of all materials and labour charges etc., complete for Walls.

4.32

6865

29660.6

... More
Path Holes;BLD-CSTN-3-5 (22) P.C.C. (1:4:8) proportion nominal mix (cement : fine aggregate: coarse aggregate) using 40mm size HBG (SS5) metal from approved quarry including cost and conveyance of all mate-rials like cement, sand, coarse aggregate, water etc. all operational, incidental, and labour charges such as mixing, laying and ramming finishing top surface, curing concrete, etc,.. complete for finished item of work Foundations.

1.44

4607

6634.25

... More
Path Holes;Supply and Filling with 2.36mm and below HBG stone Chips as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH including cost and conveyance of all materials and labour charges etc., complete for finished items of work.

1.44

1173

1689.88

... More
Path Holes;Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, removal of stumps and other deleterious material and disposal upto a lead of 50 m, etc complete for pipe line trenches & building foundations where depth is less than 1.50 times the width (RBR-FNDN-1)

2.3

285

657.47

... More
Path Holes;Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, removal of stumps and other deleterious material and disposal upto a lead of 50 m, etc complete for pipe line trenches & building foundations where depth is less than 1.50 times the width (RBR-FNDN-1)

9.22

128

1182.28



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.