For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Municipality Tender
Civil And Construction
Drainage Work
Opening Date27 Mar 2025
Closing Date2 Apr 2025
Tender Amount₹ 16,64,576
Costs
EMD
₹ 16,646Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
584411Tender No
E2/2780-215/2024Tender Authority
Municipality ViewPurchaser Address
-Website
http://tender.telangana.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
UGD Drain;Plain Cement concrete (1:3:6) using 20 mm HBG graded metal machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including seigniorage charges, sales & other taxes on all materials and including all charges for machine mixing, Centering and laying concrete in under bed and side walls, compacted by vibration including curing for 14 days complete but excluding cost of steel and its fabrication charges for finished item of work as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH. RBR-FNDN-4 Bottom bed Drains
20.83
5006
104282.69
... More
UGD Drain;Laying Plain Cement concrete (1:5:10) using 20 mm graded metal with crushed as per SS-3 mechanically mixed and placed and compacted by vibration and including curing for 21 days complete but excluding cost of steel and its fabrication charges for finished item of work as per drawings and technical specifications etc. for CC pavement. RBR-FNDN-4
27.78
4410
122516.19
... More
UGD Drain;Earthwork in excavation for roadway in soil and drains as per drawing and technical specifications Clause 305.1 including setting out, removal of stumps and other deleterious material and disposal upto a lead of 50 m, etc complete for where depth is less than 1.50 times the width (RBR-FNDN-1)
208.31
285
59443.34
... More
UGD Drain;Plain Cement Concrete (1:2:4) (cement: fine aggregate, Coarse aggregate) under bed using coarse aggregate 40mm size machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc., to site, including seigniorage charges, sales & other taxes on all materials and including all charges for machine mixing, laying concrete in under bed, ramming in 15 cm layers finishing top surface to the required level curing etc., complete for finished item of work. (AP55 No. 402)-BLD- CSTN-3-5
22.5
5498
123706.8
... More
UGD Drain;Constructing 457.2 mm x 457.2 mm (1'6"x1'6") brick in CM 1:6 prop Masonry Inspection chamber up to 914.4 mm (30") and fitted with light weight 457.2 mm x 457.2 mm (1'6"x1'6") CI frame and cover of 20
29.2
8707
254263.67
... More
UGD Drain;Supply, delivery, lowering of 300 mm dia. RCC NP2 Class S/S pipes carefully into the ready made trenches laying them true to alignment and gradient, jointing with rubber rings and testing including filling with water lead upto 500 meters including cost of rubber rings as per BIS No. 783/1985, etc. complete - 1 Rimt.
292
1062
310171.16
... More
UGD Drain;Laying Plain Cement concrete (1:5:10) using 20 mm graded metal with crushed as per SS-3 mechanically mixed and placed and compacted by vibration and including curing for 21 days complete but excluding cost of steel and its fabrication charges for finished item of work as per drawings and technical specifications etc. for CC pavement. RBR-FNDN-4
17.52
4410
77267.23
... More
UGD Drain;Carting the surplus earth including loading unloading and conveyance of all materials
105.12
157
16529.07
... More
UGD Drain;Earthwork in excavation for roadway in soil and drains as per drawing and technical specifications Clause 305.1 including setting out, removal of stumps and other deleterious material and disposal upto a lead of 50 m, etc complete for where depth is less than 1.50 times the width (RBR-FNDN-1)
131.4
285
37496.3