For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Municipality Tender

Works
Civil And Construction
Opening Date12 Mar 2024
Closing Date16 Mar 2024
Tender Amount₹ 33,36,075 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of Dumping Yard;Painting to walls with water proof cement paint of apporved brand and shade over a base coat of approved cement primer grade I making making 2 coats in all to give an even shade after thourughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 912 for internal walls. Including overhead charges & Contract profit but excluding GST.

813.56

2203

179291.54

... More
Construction of Dumping Yard;Plastering with CM 2 coats, 20 mm thick, base coat in CM (1:6), 16mm thick and top coat in CM (1:4), 4mm thick with Dubara sponze finishing. including cost and conveyance of all materials like cement, sand, water etc., to site, all operational, incidental and labour charges such as mixing mortar, scaffolding charges, lift charges, including cutting of Grooves wherever necessary as directed by Engineer - in - charge, finishing, curing, etc., complete for Even Surfaces of Wall for finished item of work. (APSS 901,903 & 904). Including overhead charges & Contract profit but excluding GST & Seigniorage Out Side Plastering

503.96

4579

230797.55

... More
Construction of Dumping Yard;Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site, all operational, incidental and labour charges such as mixing mortar, scaffolding charges, lift charges, including cutting of Grooves wherever necessary as directed by Engineer - in - charge, finishing, curing, etc., complete for Even Surfaces of Wall for finished item of work. (APSS 901,903 & 904), Including overhead charges & Contract profit but excluding GST & Seigniorage Internal Plastering.

309.6

5218

161566

... More
Construction of Dumping Yard;Roofing with Supply of Pre-painted Galvalume Trapezoidal Profile Roofing sheets with 0.50mm thickness, Coating: Alu-Zinc coating AZ150 GSM Tensile Strength: 550 MPA.Paint coating: Regular Modified Polyester painting.Painting hickness (Top): 18 to 20 Microns,(Bottom): 5 to 7 Microns. Sheet Width: 1.020, Length:Maximum 12 Meters with Regular Range Coloursfixed with G.I ?J? bolts & nuts 8 mm dia with bitumen & G.I limpet washers filled with white lead & including a coat of approved steel primer and two coats of approved paint on over lapping of sheets complete (up to a pitch of 600) and eigniorage charges, etc., complete, excluding the cost of purlins, rafters, trusses & cost of conveyance of all materials

285.48

887

253497.68

... More
Construction of Dumping Yard;Supply and fixing of Mild Steel Tubes for Purlins including the cost of conveyance of all materials & Labour charges

1495.89

169

253748.66

... More
Construction of Dumping Yard;c) 40 x 40

358.52

169

60830.09

... More
Construction of Dumping Yard;b) 50 x 50 Maintruss

728.3

169

123570.66

... More
Construction of Dumping Yard;a) No. of Trusses

1311.74

169

222562.93

... More
Construction of Dumping Yard;Supply and fixing of Mild Steel Tubes & Piped Truss of required diameters as per IS-1161 inclduing Labour charges for fabricating all heavy steel works like Trusses, Stanchions, Heavy Beams and Girders including cost of welding rods, power charges, etc excluding cost of fixing in position and including Labour charges for fixing heavy iron grills, Trusses, Stanchions, Heavy Beams and Girders erecting in position and fixing by using chain pulley blocks, Derek pole arrangements and cranes etc., complete in position

-

-

-

... More
Construction of Dumping Yard;Supply and fixing of 4 nos of 20 mm dia bolts 500 mm long with nuts for jointing truss and vertical pipe.

99.93

99

9893.07

... More
Construction of Dumping Yard;Supply and fibercation and of base plate 10mm thick ms plate wih 10 mm dia nuts and boltes icluding cost,conyance of labour charges etc. complete

117.75

78

9233.95

... More
Construction of Dumping Yard;Brick masonry in superstructure with CM (1:6) prop: using traditional bricks from approved quarry including Cost and Conveyance of all materials like cement, sand, bricks, water etc., to site, including materials, all operational, incidental and labour charges such as mixing cement mortar, constructing masonry, scaffolding charges, lift charges, curing, etc., complete for finished item of work. (APSS No. 501 & 504).

71.2

8493

604769.24

... More
Construction of Dumping Yard;d) Plinth Beam

4.22

12777

53922.02

... More
Construction of Dumping Yard;c) Columns

0.75

12878

9658.66

... More
Construction of Dumping Yard;b) Tedestal

2.59

9732

25208.08

... More
Construction of Dumping Yard;a) Foodings

5.18

9112

47202.8

... More
Construction of Dumping Yard;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, but excluding centering, shuttering. Including overhead charges & Contract profit but excluding GST & Seigniorage charges

-

-

-

... More
Construction of Dumping Yard;CRS Masonry in CM (1:6) (Cement: Sand) using hard granite stones from approved quarry including cost and conveyance of all materials like Granite stones, cement, sand, water, etc., to site including all operational, incidental, and labour charges such as cutting stones to required size and shape, mixing of cement mortar, constructing masonry, curing etc., complete for finished item of work for foundation and basement (APSS No. 601 & 615). Including overhead charges & Contract profit but excluding GST & Seigniorage

47.23

5270

248942.72

... More
Construction of Dumping Yard;Random Rubble stone masonry, in CM (1:6) prop: (Cement: Sand) using hard granite stones from approved quarry including cost and conveyance of all materials like Granite stones, cement, sand, water, etc., to site including all operational, incidental, and labour charges such as cutting stones to required size and shape, mixing of cement mortar, constructing masonry, curing etc., complete for finished item of work for foundation and basement (APSS No. 601 & 615). Including overhead charges & Contract profit but excluding GST & Seigniorage.

62.98

4778

300931.04

... More
Construction of Dumping Yard;Filling in foundation trenches with Gravel as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH. Including overhead charges & Contract profit but excluding GST.

146.98

518

76198.84

... More
Construction of Dumping Yard;Filling with useful available excavated earth (excluding rock) in trenches, sides of foundations and basement with initial lead in layers not exceeding 15cm thick, consolidating each deposited layer by watering and ramming including all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310). Including overhead charges & Contract profit but excluding GST.

94.23

321

30340.18

... More
Construction of Dumping Yard;Plain Cement Concrete corresponding to M 5 grade as per IS 456 equivalent to (1:5:10) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 40mm size HBG (SS5) metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including seigniorage charges, sales & other taxes on all materials, all operational, incidental, and labour charges such as mixing, laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete, etc., complete for finished item of work(APSS No. 402). Including overhead charges & Contract profit but excluding GST & Seigniorage charges

20.99

4827

101329.22

... More
Construction of Dumping Yard;Plain Cement Concrete corresponding to M 10 grade as per IS 456 equivalent to (1:4:8) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 40mm size HBG (SS5) metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including seigniorage charges, sales & other taxes on all materials, all operational, incidental, and labour charges such as mixing, laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete, etc., complete for finished item of work(APSS No. 402). Including overhead charges & Contract profit but excluding GST & Seigniorage charges

2.59

5026

13018.07

... More
Construction of Dumping Yard;Earth work excavation and depositing on bank with initial lead of 10m and initial lift of 2m in Loamy & Clayey Soils like BC Soils, Red Earth & Ordinary Gravelly Soils ( SS 20-B) including shoring, strutting, sheeting, planking and dewatering including cost of hire charges of T & P, labour charges etc., complete for finished item of work. Including overhead charges & Contract profit but excluding GST.

104.71

270

28319.87



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.