Municipality Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Municipality Tender
Civil And Construction
Drainage Work
Opening Date25 Jul 2024
Closing Date2 Aug 2024
Tender Amount₹ 23,28,208
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
530997Bid Award Id
ViewTender No
E1/165/MNCL/2024-25/43Tender Authority
Municipality ViewPurchaser Address
-Website
http://tender.telangana.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
retaining wall;BLD-CSTN-2-8 (16): Collection ,Supply and filling with HBG stone chips 2.36 mm & below from approved quarry to work site and stacking at work site to Dept. gauge for premeasurements including cost and convenyance of all material and all labour charges etc. complete as per standard specifications. Clause 305.3.9 MORD & 304 MORTH
26.6
1626
43257.98
... More
retaining wall;RBR-FNDN-4 I(i) : Providing P.C.C grade M 10 concrete in open foundations using 20 mm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH for foundation and under flooring bed.
19.53
4920
96093.65
... More
retaining wall;BLD-CSTN-3-15- ( 31 ) -B: Providing RCC grade M25 design Mix concreat using 20 mm grade metal (Mord) for structural using 20 mm nominal size graded hard stone aggreagate compacted by by vibration including 14 days curing etc.
73.08
6263
457711.73
... More
retaining wall;BLD-CSTN-3-15- ( 31 ) -B: Providing RCC grade M25 design Mix concreat using 20 mm grade metal (Mord) for structural using 20 mm nominal size graded hard stone aggreagate compacted by by vibration including 14 days curing etc.
60.48
8044
486538.01
... More
retaining wall;BLD-CSTN-3-15- ( 31 ) -B: Providing RCC grade M25 design Mix concreat using 20 mm grade metal (Mord) for structural using 20 mm nominal size graded hard stone aggreagate compacted by by vibration including 14 days curing etc.
2.52
10066
25368.74
... More
retaining wall;BLD-CSTN-4-1-(34) ; Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) / Mild steel (MS) steel bars (Fe 500/ Fe 500D/ Fe 550 D grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc., complete for finished item of work in all floors.( APSS No.126
10886.4
88
963337.54
... More
retaining wall;Carting of excavated soils upto a lead of 5kms including loading, unloading charges etc complete
17.6
71
1249.6
... More
retaining wall;Supplying and fixing of 100mm dia PVC pipes for weep holes including material, labour charges like cutting size, fixing in side wall etc as directed by Engineer- in- charge at 3 mts c/c.
22.8
195
4455.58
... More
retaining wall;Filling with gravel in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)
420
387
162934.8
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements