Municipality Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
₹ 6,582Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
564186Tender No
NIT No.18/DB/KMC/2595/2024-25,Dt.24.12.2024/MGF/04(1st Call) Rs.8.15 LakhsTender Authority
Municipality ViewPurchaser Address
-Website
http://tender.telangana.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
NIT 18/04;RCC grade M 30 design mix using 20mm gauge machine crushed HG metal from approved quarry including cost and conveyance of all materials like OPC 53 Grade cement of Make L ACC/(MORTH) including C&C of all materials, machine mixing, centering, laying, vibrating, curing, labour charges etc. complete. (For buildings & supersturcture upto 5 Mt height.)
3.73
7158
26674
... More
NIT 18/04;for walls
2.16
6397
13819
... More
NIT 18/04;for Bed & Vent
1.28
6122
7837
... More
NIT 18/04;PCC M15 Design mix MORTH 12.84 table using 20mm gauge machine crushed HG metal from approved quarry including cost and conveyance of all materials like OPC 53 Grade Cement of Make:ACC/Ultratech/ CCI/ Lafarge/Penna Premium etc., fine aggregate i.e., Godavari Sand (Bhadrachalam Quarry), coarse aggregate, potable drinking water etc. to site, sales & other taxes on all materials, machine mixing charges, laying concrete in position, vibrating, curing, centering charges, overheads & contractors profit etc., for finished item of work for Drain & Culvert Bed and Side Walls
-
-
-
... More
NIT 18/04;Supply and filling of stone dust including cost and conveyance of all materials, watering, and labour charges for filling etc., completed
0.72
1387
999
... More
NIT 18/04;Earth work excavation in all soils and depositing on bank with an initial lead of 10m and depth up to 3m including all operational,incidental, labour charges such as shoring, sheeting, planking, strutting etc., and overheads & contractors profit complete for finished item of work excluding dewatering charges etc.,
5.76
4755
2739
... More
NIT 18/04;Construction of Culvert
-
-
-
... More
NIT 18/04;Conveyance / carting charges for machinery for 1KM for transporting materials by tippers and trucks earth/sand/gravel
68.77
61
4205
... More
NIT 18/04;Construction of un-reinforced, plain cement concrete pavement with M30 grade mix, thickness as per design, over a prepared sub base, with 53 grade opc cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity, laid in approved fixed side formwork (steel channel, laying , steel plates including levelling the formwork ), spreading the concrete with shovels, rakes, compacted using plate vibrator and finished in continuous operation including provision of contraction and expansion, construction joints, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per Technical Specification Clause 1501 MORD.
68.77
7711
530329
... More
NIT 18/04;Earth work excavation and depositing on bank with an initial lead of10Mts. and lift of 2 Mts. in all soils including Labour charges etc.complete.
68.77
2972
20443
... More
NIT 18/04;CC road cutting including hire charges of tools and plants, labour charges etc. complete
3.24
3330
10790
... More
NIT 18/04;CC Patch works
-
-
-
... More
NIT 18/04;Laying of CC Patch works at various places in Division no. 11 in Khammam Municipal Corporation
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements