Municipality Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Municipality Tender

Works
Civil And Construction
Opening Date22 Sep 2023
Closing Date29 Sep 2023
Tender Amount₹ 4,00,699 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
BOQ;Providing concrete for V.C.C. M30 using 20mm nominal size graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications etc., complete.

22.5

6405

144127

... More
BOQ;Supply of 25.4mm thick masticpad , placing the same 25mm below top of the pavement slab at 5.00Mts interval in C.C Pavement including cost and conveyance of materials, labour charges etc., complete.

15

164

2463

... More
BOQ;Supply and Filling of Gravel in foundation trenches including cost & conveyance of all materials, labour charges, seigniorage charges etc., complete.

3.6

321

1159

... More
BOQ;Earthwork excavation and depositting on bank with an initial lead of 10.00Mts and lift of 2.00Mts in loamy, Clayey soils, etc. complete for finished item of work.

1

-

-

... More
BOQ;70% machinary

41.88

133

5593

... More
BOQ;30% Manual

17.95

439

7889

... More
BOQ;Supply and Filling of HBG stone chips 2.36 mm and below in foundation trenches including cost & conveyance of all materials, labour charges, seigniorage charges etc., complete.

4.81

1004

4833

... More
BOQ;Laying of V.C.C. (1:4:8) using 40 mm m/c metal and OPC,coarse and fine aggregate with concrete mixture. All work upto plinth level including cost & conveyance of all materials, labour charges, machine mixing, centering, laying in position, curing etc., complete.

9.61

5139

49392

... More
BOQ;P.C.C M15 using 20 mm m/c metal and OPC, coarse and fine aggregate with concrete mixture. All work upto plinth level including cost & conveyance of all materials, labour charges, machine mixing, cetering, laying in position, curing etc. complete.(side Walls)

20.45

5887

120396

... More
BOQ;P.C.C M15 using 20 mm m/c metal and OPC, coarse and fine aggregate with concrete mixture. All work upto plinth level including cost & conveyance of all materials, labour charges, machine mixing, cetering, laying in position, curing etc. complete.(vent portion)

3.97

5660

22474

... More
BOQ;Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and technical specifications for Bars below 36 mm dia including over laps and wastage, where they are not welded.

180

76

13756

... More
BOQ;Providing concrete for VRCC M30 using 20mm nominal size graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications etc., complete.

1.8

6810

12259



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.