Municipality Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Municipality Tender
Civil And Construction
Building Construction
Opening Date3 Jan 2025
Closing Date10 Jan 2025
Tender Amount₹ 7,95,526
Costs
EMD
₹ 8,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
565588Tender No
E1/1602/2024Tender Authority
Municipality ViewPurchaser Address
-Website
http://tender.telangana.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Construction of Community Hall;Supply and Transportation of 18/20W CFL Bulk head fitting with cast aluminium enamel painted body with water tight, clear glass with wire guard hinged with lock and key arrangements etc., with Lamp complete.Makes : Bajaj / Crompton / Surya
2
93
187.02
... More
Construction of Community Hall;BLD-ELEC-8-5-1 : Supply and fixing of 1 X 28W surface pendant mounting T- 5 extruded Aluminium with Aluminium reflector luminaire with all standard accessories and connections etc., complete with 1 No. 28 W T5 tube for toilets
4
227
908
... More
Construction of Community Hall;BLD-ELEC -3.1.5 : Supply and run of 2 of 56/0.3mm (4 Sq.mm) FR P.V.C. insulated flexible copper cable in existing pipe for mains inlcuding all labour charges etc., complete.
40
156
6268
... More
Construction of Community Hall;BLD-ELEC -3.1.2 : Supply and run of 1 of 14 /0.3mm (1.0 Sq.mm) FR P.V.C. insulated flexible copper cable in existing pipe for earth continuity including all labour charges etc., complete.
80
22
1836
... More
Construction of Community Hall;BLD-ELEC-3-1-3: Supply and run of 2 of 14/0.3mm (1.0 Sq.mm) F.R P.V.C. insulated flexible copper cable in existing pipe for mains inlcuding all labour charges etc., complete.
40
24
983.2
... More
Construction of Community Hall;BLD-ELEC-3.1.4 ; Supply and run of 2 of 36/0.3mm (2.5 Sq.mm) F.R P.V.C. insulated flexible copper cable in existing pipe for mains inlcuding all labour charges etc., complete.
80
90
7239.2
... More
Construction of Community Hall;BLD-ELEC-2-1-5 : Supply and fixing of 16A 3pin / 6A 3pin plug socket with indicator lamp and 16Amps fuse unit and 16 Amps switch control (2 in one) on decolam sheet covered board including earth connection and all labour charges etc., complete on wall.
4
375
1500.8
... More
Construction of Community Hall;BLD-ELEC-2-1-4 : Supply and fixing of 6A 3 pin wall plug socket with 6A switch control on a common switch board with earth continuity including wire leads, earth connections along with all labour charges etc., complete.
4
153
612.28
... More
Construction of Community Hall;BLD- ELEC- 2-1-1 : Wiring with 2 runs of 22/0.3mm (1.5 Sq.mm) Fire Retardant (FR) P.V.C. insulated flexible copper cable (ISI MARK) in existing pipe with 6A switch, Ceiling rose and 3mm thick hylam sheet covering to switch control box including all labour charges etc., complete for light, bell, fan and exhaust fan points in Non-Residential Buildings
12
705
8461.92
... More
Construction of Community Hall;BLD-ELEC-1-4.2 .c : Supply and Fixing of 25mm dia 2mm thick PVC pipe (ISI MARK) concealed in Roof Slabs with all required accessories including masonary work and labour charges etc., complete.
41.5
90
3755.33
... More
Construction of Community Hall;BLD-CSTN-10-25-(148) : Providing impervious coat to exposed RCC roof slab surfaces to required slopes with CM (1:3) prop. using screened sand 20mm thick (average) mixed with integral cement water proofing liquid confirming to IS: 2645-2003 manufactured by reputed manufacturers as approved by Engineer-in-charge at 1 Kg per one bag of cement, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm including cost and conveyance of all materials like cement, sand, water proofing compound, water etc., to site, including sales & other taxes on all materials and operational, incidental, and labour charges for mixing mortar, laying, lift charges, rendering smooth and thread lining, curing including rounding off junctions of wall and slab etc., and overheads & contractors profit complete for finished item of work. (APSS No. 901 & 903).
61.71
642
39632.01
... More
Construction of Community Hall;BLD-CSTN-4-1-(34): Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) / Mild steel (MS) steel bars (Fe 415/ Fe 500 grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc., complete for finished item of work in all floors.( APSS No.126
2936.25
77
226942.76
... More
Construction of Community Hall;BLD-CSTN-11-5-(162) : White washing two coats with whiting of approved quality to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work. Qty as per GF Ceiling plastering
61.71
50
3139.8
... More
Construction of Community Hall;BLD-CSTN-8-1-(76) : Ornamental ceiling plastering 12mm thick in CM (1:3) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, including sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer - in - charge etc., and overheads & contractors profit complete for finished item of work. (SS 901,903 & 904)
61.71
216
13360.22
... More
Construction of Community Hall;BLD-CSTN-3-11-(28) Using Concrete mixture up to Plinth Level: Plain Cement concrete nominal mix m-20 (Cement : fine aggregate: coarse aggregate ) using 12mm size Hard Granite Machine Crushed Graded Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work.
0.23
6651
1529.84
... More
Construction of Community Hall;BLD-CSTN-6-12-(67) : Construction of Random Rubble stone masonry in CM (1:6) prop: (Cement: Screened sand) using hard Granite stones carted from approved quarry including cost and conveyance of all materials like cement, screened sand, water, stones etc., to site and excluding seigniorage charges but including sales & other taxes on all materials including labour for cutting stones to required size and shape, mixing of cement mortar, construction, curing etc.,and overheads & contractors profit complete for finished item of work for foundations and basement. (APSS No. 601 & 615)
4.85
5072
24599.2
... More
Construction of Community Hall;BLD-CSTN-6-12-(67) : Construction of Random Rubble stone masonry in CM (1:6) prop: (Cement: Screened sand) using hard Granite stones carted from approved quarry including cost and conveyance of all materials like cement, screened sand, water, stones etc., to site and excluding seigniorage charges but including sales & other taxes on all materials including labour for cutting stones to required size and shape, mixing of cement mortar, construction, curing etc.,and overheads & contractors profit complete for finished item of work for foundations and basement. (APSS No. 601 & 615)
5.76
4959
28567.18
... More
Construction of Community Hall;(BLD-CSTN-3-16) : Reinforced Cement Concrete M 25 design mix using 12mm size hard granite machine crushed graded metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry, using a minimum quantity of 380 kgs. of cement per 1 cum of concrete using WEIGH BATCHER / MIXER including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site including steel centering, shuttering, labour charges such as weigh batching, machine mixing, laying concrete, lift charges, curing etc., and overheads & contractors profit complete for finished item of work (APSS No. 402 & 403) for Sun shades, platforms, Lofts and shelves. RCC M -25 for Sun shades of 0.60M width, 75mm th. at fixed end and 50mm th. at free end - up to 3.66m above GL
5.6
1201
6730.64
... More
Construction of Community Hall;BLD-CSTN-3-16-(31)-C : Supply and placing of the M-20 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. for RCC SLABS, BEAMS Floor Beams @ 3.36 M Height - Ground Floor
3.08
13665
42089.74
... More
Construction of Community Hall;BLD-CSTN-3-16-(31)-C : Supply and placing of the M-20 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. for RCC SLABS, BEAMS Roof Slab 150 mm thick @ 3.36 M Height - Ground Floor
10.05
12214
122753.61
... More
Construction of Community Hall;BLD-CSTN-3-15- ( 31 ) -B: Supply and placing of the M-20 Design Mix Concrete corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and sales & other taxes on all materials, centering using steel scaffolding pipes, jack props, steel centering plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete mechanically, laying concrete, curing , overheads & contractors profit etc., complete but excluding seignorage charges, cost of steel and its fabrication charges for finished item of work (APSS No. 402) for COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS. Lintels
0.35
14937
5228.14
... More
Construction of Community Hall;BLD-CSTN-3-15- ( 31 ) -B: Supply and placing of the M-20 Design Mix Concrete corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and sales & other taxes on all materials, centering using steel scaffolding pipes, jack props, steel centering plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete mechanically, laying concrete, curing , overheads & contractors profit etc., complete but excluding seignorage charges, cost of steel and its fabrication charges for finished item of work (APSS No. 402) for COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS. Columns Above GL
2.56
14720
37684.56
... More
Construction of Community Hall;BLD-CSTN-3-14-(31) - A : Supply and placing of the Design Mix Concrete M 20 grade corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and sales & other taxes on all materials , centering using Steel scaffolding pipes , jack props, wallers, Foot plates, brackets, steel centering plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., and overheads & contractors profit complete but excluding seignorage charges, cost of steel and its fabrication charges for finished item of work (APSS No. 402) for PLINTH, PEDESTALS and FOOTINGS. Note : 1) The cement content is adopted as 350Kg/cum for estimating purpose only. The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 350 Kgs/ Cum the defference in cost shall be deducted. Plinth Beam
3.11
14200
44164.24
... More
Construction of Community Hall;BLD-CSTN-3-14-(31) - A : Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate coarse aggregate, water etc., to site . sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering and suttering charges etc.,complete but excluding seignorage charges, cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code for PLINTH, PEDESTALS and FOOTINGS. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the defference in cost shall be deducted Pedastals
0.85
11853
10075.42
... More
Construction of Community Hall;BLD-CSTN-3-14-(31) - A : Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate coarse aggregate, water etc., to site . sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering and suttering charges etc.,complete but excluding seignorage charges, cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code for PLINTH, PEDESTALS and FOOTINGS. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the defference in cost shall be deducted Footings
5.49
11227
61638.48
... More
Construction of Community Hall;BLD-CSTN- 2-9 ( 17 ) - (Modification) : Back filling with useful available earth: excavated earth (excluding rock) in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)
27.77
40
1124.68
... More
Construction of Community Hall;BLD-CSTN-3-5 (22) -Using Concrete mixture all works up to Plinth Level : Plain Cement concrete nominal mix (1:5:10) prop (Cement : fine aggregate: coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , seigniorage charges on all materials, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed.
10.72
5278
56589.59
... More
Construction of Community Hall;BLD-CSTN-2-7 - (15) - Hard rock (blasting prohibited)-Upto 3 m depth Earth work excavation and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work excluding dewatering charges etc as per SS - 20 B (APSS 308).
4.76
1012
4819.07
... More
Construction of Community Hall;BLD-CSTN-2-2(10) : Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work including seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308).
42.83
285
12221.97
Evaluation Notes How It Works ?