Municipality Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Municipality Tender
Civil And Construction
Building Construction
Opening Date2 Sep 2023
Closing Date8 Sep 2023
Tender Amount₹ 1,12,45,882
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
455391Bid Award Id
ViewTender No
E1/MRPD/Mplty/eproc-4/2023-24, Dated:01-09-2023Tender Authority
Municipality ViewPurchaser Address
-Website
http://tender.telangana.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
RBR-CCPV-5-Construction of M30 grade plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement @ 350 kg per cum or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD.
354.38
2517409
7103.7
RBR-EECD-15: Construction of earthen shoulders with approved material obtained from roadway cutting with all leads and lifts including pre-watering of soil, spreading soil, breaking clods, sectioning, grading and consolidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of table 300-2 of MoRT&H, including all hire and operational charges of T&P etc., complete for finished item of work as per MoRT&H specification 305 (5th revision).
56.7
13022
229.67
Vaccum drying of freshly laid cement concrete floor using 100% air tight suction mat of suitable size and length, vaccum pump to maintain vaccum pressure 0.7-0.8 atmospheres as per the standard procedure floating with power floater, mechanical trawelling, finishing with sound edges and corners, including hire and operational charges of machinery, labour, fuel etc., complete for finished item of work as directed by Engineer-in-charge of the work. For 3.75 mts carriage way
2362.5
177188
75
Saw cut joints for freshly laid concrete pavement including all material and labour charges as directed by the Engineer in ChargeFor 3.75 mts carriage way
1907.03
186336
97.71
Carting of surplus excavated earth /rock/ soil or any debris for a lead of 5kms from the site to suitable place including loading, unloading charges, cost & conveyance, dumping, labour charges, all leads & lifts and other incidental and operational charges etc., complete as directed by the Engineer in Charge.Earth work Qty @70%
413
29984
72.6
(2) Laying of CC Road from Suryapet road to Warangal Road (via St.Augustians School) in Maripeda Municipality under SDF Construction of Granular sub-base by providing HBG material confirming to Grading - VI of MoRT&H Table 400-1 including cost, (excluding seigniorage charges) and conveyance of all materials to work site and spreading in uniform layers with motor grader or by approved means, on prepared surface mixing by mix in place method with Rotavator / approved means at OMC and compacting with vibratory roller to achieve the desired density etc., complete for finished item of work as per MoRT&H Specification 401 (5th revision) and as directed by the Engineer-in-charge For 3.75 mts carriage way
127.5
259561
2035.77
RBR-FNDN-4 I(i) : Providing P.C.C grade M 10 concrete in open foundations using 40mm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH for foundation and under flooring bed. For 3.75 mts carriage way
95.63
503923
5269.51
RBR-CCPV-5-Construction of M30 grade plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement @ 350 kg per cum or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD. For 3.75 mts carriage way
191.25
1358583
7103.7
RBR-EECD-15: Construction of earthen shoulders with approved material obtained from roadway cutting with all leads and lifts including pre-watering of soil, spreading soil, breaking clods, sectioning, grading and consolidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of table 300-2 of MoRT&H, including all hire and operational charges of T&P etc., complete for finished item of work as per MoRT&H specification 305 (5th revision). For 3.75 mts carriage way
30.6
7028
229.67
Vaccum drying of freshly laid cement concrete floor using 100% air tight suction mat of suitable size and length, vaccum pump to maintain vaccum pressure 0.7-0.8 atmospheres as per the standard procedure floating with power floater, mechanical trawelling, finishing with sound edges and corners, including hire and operational charges of machinery, labour, fuel etc., complete for finished item of work as directed by Engineer-in-charge of the work.
1275
95625
75
Saw cut joints for freshly laid concrete pavement including all material and labour charges as directed by the Engineer in Charge For 3.75 mts carriage way
1190.01
116276
97.71
Carting of surplus excavated earth /rock/ soil or any debris for a lead of 5kms from the site to suitable place including loading, unloading charges, cost & conveyance, dumping, labour charges, all leads & lifts and other incidental and operational charges etc., complete as directed by the Engineer in Charge. Earth work Qty @70%
223
16190
72.6
(3) Laying of CC Road at Kondasamudram Road in Maripeda Municipality under SDF RBR-EECD-8(c) : Earthwork excavation for road way in soil by mechanical means by using Hydraulic excavator including cutting and pushing the earth to side of embankment upto a lead of 100 metres including trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections etc., complete for finished item of work for trench cutting as per MOR&H specification No.301 and as directed by the Engineer-in-Charge. For 3.75 mts carriage way
609.38
46441
76.21
Construction of Granular sub-base by providing HBG material confirming to Grading - VI of MoRT&H Table 400-1 including cost, (excluding seigniorage charges) and conveyance of all materials to work site and spreading in uniform layers with motor grader or by approved means, on prepared surface mixing by mix in place method with Rotavator / approved means at OMC and compacting with vibratory roller to achieve the desired density etc., complete for finished item of work as per MoRT&H Specification 401 (5th revision) and as directed by the Engineer-in-charge For 3.75 mts carriage way
243.75
496219
2035.77
RBR-FNDN-4 I(i) : Providing P.C.C grade M 10 concrete in open foundations using 40mm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH for foundation and under flooring bed. For 3.75 mts carriage way
182.81
963319
5269.51
RBR-CCPV-5-Construction of M30 grade plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement @ 350 kg per cum or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD. For 3.75 mts carriage way
365.63
2597326
7103.7
RBR-EECD-15: Construction of earthen shoulders with approved material obtained from roadway cutting with all leads and lifts including pre-watering of soil, spreading soil, breaking clods, sectioning, grading and consolidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of table 300-2 of MoRT&H, including all hire and operational charges of T&P etc., complete for finished item of work as per MoRT&H specification 305 (5th revision). For 3.75 mts carriage way
58.5
13436
229.67
Vaccum drying of freshly laid cement concrete floor using 100% air tight suction mat of suitable size and length, vaccum pump to maintain vaccum pressure 0.7-0.8 atmospheres as per the standard procedure floating with power floater, mechanical trawelling, finishing with sound edges and corners, including hire and operational charges of machinery, labour, fuel etc., complete for finished item of work as directed by Engineer-in-charge of the work. For 3.75 mts carriage way
2437.5
182813
75
Saw cut joints for freshly laid concrete pavement including all material and labour charges as directed by the Engineer in ChargeFor 3.75 mts carriage way
1967.56
192250
97.71
Carting of surplus excavated earth /rock/ soil or any debris for a lead of 5kms from the site to suitable place including loading, unloading charges, cost & conveyance, dumping, labour charges, all leads & lifts and other incidental and operational charges etc., complete as directed by the Engineer in Charge.Earth work Qty @70%
183
13286
72.6
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements