Municipality Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Municipality Tender

Works
Civil And Construction
Building Construction
Opening Date15 Jan 2025
Closing Soon22 Jan 2025
Tender Amount₹ 7,88,073 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of Community Hall;Mini Modular Stepped type Electronic Regulator with Cover Frame. ELEC-1.8.1(I)

10

261

2610

... More
Construction of Community Hall;6A 3/2 Pin Mini Modular Socket with Cover Frame. ELEC-1.8.1(d)

5

39

195

... More
Construction of Community Hall;6A Mini Modular Bed Switch / Bell Push with Cover Frame. ELEC-1.8.1(a)

5

25

125

... More
Construction of Community Hall;Supply of ---------------- dia Medium grade PVC Bends. Makes : Sudhakar / Finolex / Modi / VIP / Precision / Universal (SSR (ELEC-1.2.9)

10

12

120

... More
Construction of Community Hall;Supply of ---------------- dia Medium grade PVC Bends. Makes : Sudhakar / Finolex / Modi / VIP / Precision / Universal 19 / 20mm (ELEC-1.2.8)

10

8

80

... More
Construction of Community Hall;Supply of ISI ----------------outer dia heavy grade, FRLS with IS:9537 part 3 rigid PVC pipe. Makes : Sudhakar / Finolex / Modi / VIP / Precision / Universal / Million Plast / Gold / Polycab / DEC (SSR 2024-25, Pg.No.328, ELEC-1.2.1) 20mm

15

35

525

... More
Construction of Community Hall;Pendent Holder / Adopter.(Sl.No.312 (o)) (SSR 2024-25, Pg.No.336)

10

25

250

... More
Construction of Community Hall;3 Plate Jumbo Ceiling Rose. (Sl.No.310 (m)), (SSR 2024-25, Pg.No.336)

10

25

250

... More
Construction of Community Hall;Supply of --------------------FRLS / HFFR PVC insulated 1100V grade as per IS:694/1990 specification for Copper cable. Makes : Finolex / RR kabel / Havells / APAR EBXL / KEI (HFFR) / Polycab ((HR_FR-LF) / L&T / V-Guard (HFFR) 36/0.3mm (2.5 Sqmm) (SSR 2024-25, Pg.No.332, ELEC-1.5.2)

13

3260

42380

... More
Construction of Community Hall;Supply of --------------------FRLS / HFFR PVC insulated 1100V grade as per IS:694/1990 specification for Copper cable. Makes : Finolex / RR kabel / Havells / APAR EBXL / KEI (HFFR) / Polycab ((HR_FR-LF) / L&T / V-Guard (HFFR) 22/0.3mm (1.5 Sqmm) (SSR 2024-25, Pg.No.332, ELEC-1.5.2)

10

2010

20100

... More
Construction of Community Hall;Supply and making of Double side laminate Partition of Alluminium Paneling using 50mm *25mm for frame work ,12mm thick plywood fixed on both side of the surface of the frame work and using 1mm thick laminate sheet of approved make on both the faces of plywood panel,including cost and conveyance of all materials including all labour charges etc to complete the finished item of work.

7.2

9602

69134.9

... More
Construction of Community Hall;Supply and Fixing of single leaf shutter, Door Size 0.90x2.10 mtrs with Sal/ Country wood Frame of sections size 75mm x 100mm and with Flush Door Shutter Solid Bond Wood block board type with commercial ply on both faces of 30mm thick including cost of fixtures such as MS Powder coated Tower Bolts 250mm long 2 Nos, MS Powder coated Handles 150mm long 2 Nos, 300mm long MS Powder coated Aldrops 1No, 125mm long M.S.Powder Coated butt hinges 6Nos, 300 mm long MS Powder coated Flat latch 1No, Door stopper 2 Nos, MS Hold fasts 4Nos 230mm long cost and convenyance of all materials to site all Labour charges such as Fixing of Door Frame and shutter Fixing in position , with Hardware fixtures etc., complete for finsihed item of work.

1

9655

9655.66

... More
Construction of Community Hall;BLD-CSTN-9-6-(104) : Flooring with Non-skid red or white full body Ceramic floor tiles of size 600 x 600 mm and thickness between 7-8 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and design, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete, including seigniorage charges, etc., complete for finished item of work,including the cost and conveyance of all materials.

140

1020

142856

... More
Construction of Community Hall;BLD-CSTN-12-4-(171): Painting Walls with Snowcem or other equal and approved Water Proof Cement Paint over Priming Coat, 2 Coats (All Colours) to give an even shade after thourughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 912.

462.08

190

87804.44

... More
Construction of Community Hall;BLD-CSTN-8-2-(77) : Plastering with 12mm thick in single coat in CM (1:4) finished smooth including cost and conveyance of all materials to site, seigniorage charges on all materials, finishing, curing, scaffolding and all operational, incidental, labour charges etc., including cutting grooves where ever necessary etc., complete for finished item of work. (As per SS 903). per 10 Sqm.

462.08

221

102554.04

... More
Construction of Community Hall;BLD-CSTN-3-1-(iv) P-13 Brick Masonary 2nd Class Ground moulded or treditional size 23x11x7 Cm in Cement Mortor 1:6 Prop including Cost & conveyance of all Materials like Cement, Sand, Bricks, Water, etc., to site cost of Seigniorage charges on all materials, including all labour charges like mixing Cement Mortor, scaffoding charges lift charges , curing charges etc., complete for finished item of work

35.3

8464

298792.9



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.