For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Municipality Tender

Works
Civil And Construction
Building Construction
Opening Date24 Jan 2025
Closing Date27 Jan 2025
Tender Amount₹ 19,73,022 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
CONCTRUCTION OF TOILETS;BLD-CSTN-2-1 (9): Earth work excavation of Foundation in Ordinary Soil by Manual Means-Upto 3 m depth for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work as per SS - 20 B (APSS 308).

2.07

270

560

... More
CONCTRUCTION OF TOILETS;RBR-CCPV-13 - ii: Providing and Laying of Interlocking Concrete Block Pavements using precast concrete blocks for paving of M-35 grade and thickness not less than 60 mm for Medium traffic areas conforming to IS 15658:2006 in all shapes and designs as per the manufacturer's Specification including cost and conveyance of all material and all labour charges etc,. complete.

285

656

187239

... More
CONCTRUCTION OF TOILETS;Amendment BLD-CSTN-2-8-Modification : Filling with QUARRY DUSTin trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

28.5

864

24625

... More
CONCTRUCTION OF TOILETS;BLD-CSTN-3-7-(24) Using Concrete mixture all works up to Plinth Level: Plain Cement concrete nominal mix (1:5:10) prop (Cement : fine aggregate: coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site including labour charges for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed.

21.38

5630

120373

... More
CONCTRUCTION OF TOILETS;BLD-CSTN-11-8-(165): Colour washing two coats with approved Colour and quality to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work, including conveyance charges of materials.

47.5

72

3460

... More
CONCTRUCTION OF TOILETS;RBR-TSRA-29 : Cast in Situ Cement Concrete M20 Kerb: Construction of cement concrete kerb with top and bottom width 115 and 165 mm respectively, 300 mm high in M 20 grade PCC on M-10 grade foundation 150 mm thick, foundation having 50 mm projection beyond kerb stone, kerb stone laid with kerb laying machine, foundation concrete laid manually, all complete as per clause 408 MORTH

190

334

63646

... More
CONCTRUCTION OF TOILETS;RBR-EECD-8(c) : Earthwork excavation for road way in soil by Manual means including cutting and pushing the earth to side of embankment upto a lead of 100 metres including trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections etc., complete for finished item of work for trench cutting as per MOR&H specification No.301 and as directed by the Engineer-in-Charge

8.55

289

2478

... More
CONCTRUCTION OF TOILETS;RBR-EECD-8(c) : Earthwork excavation for road way in soil by mechanical means including cutting and pushing the earth to side of embankment upto a lead of 100 metres including trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections etc., complete for finished item of work for trench cutting as per MOR&H specification No.301 and as directed by the Engineer-in-Charge- (Hydraulic Excavator)

34.2

76

2606

... More
CONCTRUCTION OF TOILETS;TBSP-H.II-01:Providing and placing on terrace (at all floor levels)polyetheylene water storage tank with double layer approved brand and manufacture with cover and suitable locking arrangement and making necessary holes for inlet and outlets and over flow pipes but without fittings and base support for tanks

3000

11

34080

... More
CONCTRUCTION OF TOILETS;TBSP-J.I-35:S & F 609.6 x 457.10 (24" x 18?) Indian make best quality glass, mirror with T.V. shaped PVC frame plywood back with NP screws 1st quality including cost and conveyance of all materials, labour charges etc., complete for finished item of work in all floors.

2

640

1282

... More
CONCTRUCTION OF TOILETS;TBSP-B.II-04:Construction of brick masonry support for GI pipe of size 304.80 x 228.60 x 228.60 mm in CM (1:6) prop including plastering with 12mm thick in CM (1:5) prop including all labour charges etc. complete for finished item of work.

3

106

320

... More
CONCTRUCTION OF TOILETS;TBSP-J.III-03:28.60mm OD Pipe- SDR 13.7

30

267

8010

... More
CONCTRUCTION OF TOILETS;TBSP-J.III: Supply and Fixing of premium make CPVC Pipes of different diameters in ground or on wall including cost and conveyance of all materials and labour charges complete for finished item of work. TBSP-J.III-02:22.20mm OD Pipe- SDR 13.6

30

202

6067

... More
CONCTRUCTION OF TOILETS;TBSP-J.III: Supply and Fixing of premium make CPVC Pipes of different diameters in ground or on wall including cost and conveyance of all materials and labour charges complete for finished item of work. TBSP-J.III-01:15.90mm OD Pipe- SDR 13.5

30

176

5283

... More
CONCTRUCTION OF TOILETS;TBSP-H.I-02:Supplying and fixing of SWR PVC pipes (as per ISI standards) 4 Kg/Sq.cm. and fixing all special such as plain bends, off sets, door bends, single junctions, double junctions as per site requirement, fixing with PVC clamps if necessary with required number of Bombay nails including cost and conveyance of all materials to site, labour charges etc.complete for finished item of work at all floor levels. (APSS No. 1302 1319 & 1326)

40

541

21678

... More
CONCTRUCTION OF TOILETS;TBSP-A.I-01: Supplying, laying, jointing and testing 101.6 mm SWG SP-1 pipes of ISI make conforming to ISI 651 & 4127 with airtight cement joints in CM 1.5:1 prop. Including excavation of trenches and socket pits in any soil (except rock requiring blasting) up to 1524 mm(5'0") depth and refilling with watering and tamping.

30

674

20246

... More
CONCTRUCTION OF TOILETS;TBSP-F.VI-01:S&F 15 mm nominal size 152.0 mm CP finish iron body shower rose

3

236

709

... More
CONCTRUCTION OF TOILETS;TBSP-F.I-02:S&F of 15 mm brass body CP finish bib tap of not less than 300 grams weight with quarter turn spindle with either internal or external threaded connection conforming to IS 8931

12

746

8957

... More
CONCTRUCTION OF TOILETS;TBSP-C.II-30: Supplying & fixing CI floor traps 1st quality ISI marked conforming to IS:1729-1979 with C.P. Grating fixing with white cement as per site requirements with standard practice for nominal dia 75 mm (3") and grating size 100 mm dia of weight not less than 4.0 Kgs

12

448

5385

... More
CONCTRUCTION OF TOILETS;TBSP-A.I-09: Supplying & fixing 150 mm x 100 mm SWG gully traps conforming to ISI 651 & 4127 with C.I Grating & Cost. Brick masonry in CM 1:6 prop. Intermediate chamber and fitted with 304.8 mm x 288.6mm (12"x9") C.I Frame and hinged cover

2

850

1702

... More
CONCTRUCTION OF TOILETS;TBSP-F.VII-06: S & F 38.1 mm C.P waste coupling and 32mm dia PVC waste pipe including cost and conveyance of all materials and labour charges for finished item of work etc. complete-Urinals

8

291

2336

... More
CONCTRUCTION OF TOILETS;TBSP-E.VI-05: Supplying & Fixing 550 x 400 mm Indian make Flat Back Wash Hand Basin (HSW/Parryware/ Neycer) 1st quality conforming to IS:2556-Part-4:1972 with waste fittings like rubber plug, chain, 32 mm nominal size C.P. Fitting with parallel pipe thread conforming to IS:2963-1979 and fitted with 15 mm nominal bore Chromium Plated Pillar Tap of 1st quality Indian make 400 grams Seiko/ Senior/ Nice/ Esso or equivalent complete with standard CI brackets including wooden block: - Single C.P. Pillar cock

2

3047

6094

... More
CONCTRUCTION OF TOILETS;TBSP-E.VII-03:Supplying & Fixing white glazed flat back half stall urinals of size 590 x 375 x 390 mm with internal flushing rim fixed with screws complete,1st quality ISI marked variety, as approved by Engineer-in-charge, 15 mm PVC connections with brass plumber union nuts, S&F of 15 mm brass body CP finish self closing tap push type conforming to IS 1711 1st quality of approved make including 40 mm dia. PVC waste pipe including cost 76.2 x 101.6 mm teak wood block and conveyance of all materials to site, labour charges etc., complete for finished item of work for all floors.

6

4484

26906

... More
CONCTRUCTION OF TOILETS;TBSP-E.II-02:Supply & fixing white glazed European water closet with variety as approved by Engineer-in-charge, P" or S" trap with 4" CI outlet pipe of approved make, plastic seat and lid for EWC and rubber buffers as per ISI 2548 1963 with and low down porcelain flushing tank with lid 10 Lit Capacity with internal components and fixed with wooden gutties with required size nails, 32mm dia short CP bend, 15 mm PVC connections with brass union nuts and 12.70 mm (1/2")NP stop cock heavy duty (300 grams), complete including cost and conveyance of all materials to site, for finished item of work for all floors.

6

8033

48202

... More
CONCTRUCTION OF TOILETS;ELEC-7.16.7: Providing independent earthing for Important equipment with 40mm dia 'B' class 2.5m long G.I pipe and 19mm dia 'B' class G.I pipe of 0.3mtr. long connected with reducer providing G.I funnel with mesh enclosed in C.C/ brick massonry chamber of 450m x 450m x 400mm with R.C.C. Slab cover duly providing staggered holes filling with 20Kg Salt and 40Kg Charcoal or 40Kg bentonite powder from the bottom of the pipe giving earth connection from electrode through G.I strip of 40 x 6mm x 200mm length with all accessories and labour charges complete, as per IS specifications 732/1982 (Part II)

1

5836

5836

... More
CONCTRUCTION OF TOILETS;BLD-ELEC-4-4-2A: Supply and fixing SPN Distribution board with IP-20 protection suitable for single phase Earth Leakage Circute Braker (ELCB) / Residual Current Circute Braker (RCCB) / Double Pole (DP) Isolator as incomer and 10kA SP MCBs as out going including internal connections and labour charges for surface / flush mounting etc., complete as directed by the Engineer-in-Charge. SPN DB Makes : Legrand / Schneider / Siemens / L&T / Cabtree Xpro / ABB / C&S, Isolator & SP MCB Makes : Legrand-DX3 / Schneider-Acti9 /Siemens / L&T Exora / Cabtree / Indo Asian / BCH

1

4441

4441

... More
CONCTRUCTION OF TOILETS;BLD-ELEC-6-1-2 : Supply and Run of 2 of 6 Sq.mm WPSC Aluminium cable along with No.10 SWG G.I bearer wire through PVC cleats with all accessories including labour charges etc., complete as directed by the Engineer-in-Charge. for service mains. Makes : Polycab / GM / Million / V-Guard/ Gold Medal / Kundancab / HPL / RPG / Nandicab / Nakoda / Payal / Finecab / Gemini / Vimal / Suncab / Stanjo /Rajnigandha / Orbit / Airson / Beljin /Savera Champion / Rhino / Pawancab

30

92

2766

... More
CONCTRUCTION OF TOILETS;BLD-ELEC-3.1.3 ; Supply and run of 2 of 14/0.3mm (1.0 Sq.mm) F.R P.V.C. insulated flexible copper cable in existing pipe for mains inlcuding all labour charges etc., complete as directed by the Engineer-in-Charge. Copper Cable Makes :Finolex / RR kabel / Havells / APAR EBXL / KEI / L&T / V-Guard.

120

69

8377

... More
CONCTRUCTION OF TOILETS;BLD-ELEC-2-1-5 :Supply and fixing of 16A 3pin / 6A 3pin plug socket with indicator lamp and 16Amps fuse unit and 16 Amps switch control (5 in one) on decolam sheet covered board including earth connection and all labour charges etc., complete as directed by the Engineer-in-Charge on wall. Switch & Socket Makes: GM G Home / Gold Medal Olive /Million Zoom / Anchor Penta Cherry /Great white Omega / HPL / Vimal / CPL.

4

308

1235

... More
CONCTRUCTION OF TOILETS;BLD-ELEC-2-1-4 :Supply and fixing of 6A 3 pin wall plug socket with 6A switch control on a common switch board with earth continuity including wire leads, earth connections along with all labour charges etc., complete as directed by the Engineer-in-Charge. Switch & Socket Makes: GM G Home / Gold Medal Olive /Million Zoom / Anchor Penta Cherry /Great white Omega / HPL / Vimal / CPL.

4

148

595

... More
CONCTRUCTION OF TOILETS;BLD-ELEC-2-1-1: Wiring with 2 runs of 14/0.3mm (1.0 Sq.mm) Fire Retardant (FR) P.V.C. insulated flexible copper cable (ISI MARK) in existing pipe with 6A switch, Ceiling rose and 3mm thick hylam sheet covering to switch control box including all labour charges etc., complete as directed by the Engineer-in-Charge for light, bell, fan and exhaust fan points in Non-Residential Buildings - Copper Cable Makes : Finolex / RR kabel / Havells / APAR EBXL / KEI / L&T / V-Guard.Switch & Ceiling Rose Makes: GM G Home / Gold Medal Olive /Million Zoom / Anchor Penta Cherry /Great white Omega / HPL / Vimal / CPL.

20

726

14532

... More
CONCTRUCTION OF TOILETS;BLD-ELEC-1-4-1B: Supply and Fixing of 20mm dia 1.5mm thick P.V.C. pipe (ISI MARK) concealed in wall with all required accessories including masonary work for light, fan and separate plug point with well seasoned wooden deep box including all labour charges etc., complete as directed by the Engineer-in-Charge. (Makes : Sudhakar / Finolex / Modi / VIP /Precision / Universal / Million Plast /Gold / Polycab / DEC / Beljin / Champion/ Austro)

33

97

3226

... More
CONCTRUCTION OF TOILETS;BLD-ELEC-1-4-2C: Supply and Fixing of 25mm dia 2mm thick PVC pipe (ISI MARK) concealed in Roof Slabs with all required accessories including masonary work and labour charges etc., complete as directed by the Engineer-in-Charge. (Makes : Sudhakar / Finolex / Modi / VIP /Precision / Universal / Million Plast /Gold / Polycab / DEC / Beljin / Champion/ Austro)

33

86

2849

... More
CONCTRUCTION OF TOILETS;TBSC-R.I-22 :S&F of pre-cast RCC Grills of any design of 50 mm thick manufactured with M-30 grade of concrete using vibro- compaction process using joint less FRP moulds to achieve shuttering finish and adequately reinforced for long use and to prevent damage during handling, transportation & erection etc

2.7

755

2040

... More
CONCTRUCTION OF TOILETS;BLD-CSTN-10-25-(148) : Providing impervious coat to exposed RCC roof slab surface with CM(1:3), 20mm thick with 1kg of water proof compound per bag of cement laid over roof when it is green including cost of all materials, excluding conveyance charges of materials and including all operational, incidental and labour charges for mixing mortar, laying, rendering smooth and thread lining, curing, rounding off junctions of wall and slab etc,, complete for finished item of work

42.79

623

26668

... More
CONCTRUCTION OF TOILETS;BLD-CSTN-12-5(172): Painting to new walls with 2coats of waterproof cement paint of apporved brand and shade over a base coat of approved cement primer grade I making making 3coats in all to give an even shade after thourughly brushing the surface to remove all dirt and remain soft loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc.complete for finished item of work as per SS 912 for External walls

190.48

263

50252

... More
CONCTRUCTION OF TOILETS;BLD-CSTN-12-5(172): Painting to new walls with 2coats of waterproof cement paint of apporved brand and shade over a base coat of approved cement primer grade I making making 3coats in all to give an even shade after thourughly brushing the surface to remove all dirt and remain soft loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc.complete for finished item of work as per SS 912 for internal walls

65.92

258

17028

... More
CONCTRUCTION OF TOILETS;Supplying and fixing of 24/26 mm thick Wood Plastic Composite (WPC) Door shutter, comprising of 70% virgin polymer, 15% wood powder (fiber), and the remaining 15% additives, comprising of virgin PVC polymer of K value 58-60 (Suspension grade), Calcium carbonate and natural fibers (wood powder) and non toxic additives (maximum toxicity index of 12 for 100 gms) having minimum door density of 650 kg/cum, screw withdrawal strength 1800N (Face) & 900N (Edge), Modulus of Elasticity 900N/mm2 and resistance to spread of flame of Class A category with property of being termite/borer proof, water/moisture proof and fire retardant and fixed in position with stainless steel butt hinges of required size with necessary full body threaded star headed counter sunk SS screws all as per direction of Engineer -in- Charge (SS butt hinges and SS screws shall be paid separately) 3 Nos. butt hinges (IS:205) of 150mm long, 1 No. aldrop (IS:2681) 250 mm long, 1 No. tower bolt (IS:204) of 150 mm x 10mm dia, 2 Nos. 125mm long handles (IS:208),1 No. rubber bush including labour charges for fixing the frame in position, fixing the shutter to the frame etc., including overheads & contractors profit complete for finished item of work as per APSS 1001 & 1002. (The vertical frame of door shall be embedded in flooring for deth of not less than 10mm) (750mm x 2100mm).

20.79

3470

72151

... More
CONCTRUCTION OF TOILETS;TBSC-L.I-17: Providing and fixing factory-made solid Wood Polymer Composite (WPC) single extruded Door Frame section of 100*65 MM with encapsulation of 6 MM rigid layer on all external surfaces. The door frame will have a rebate of 32MM/ 37 MM. The two Vertical members are to be joined together with the horizontal member using 8x75 MM long MS Star full thread screws to be used with reverse forward speed control hand drilling machine. The ready/assembled door frame is fixed to wall using Z Hand fast 300 MM long hold fast.

49.8

882

43963

... More
CONCTRUCTION OF TOILETS;BLD-CSTN-4-1-(34): Providing High Yield Strength Deformed (HYSD)/ Mild steel (MS) steel bars (Fe 500/550/550D) grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc., complete for finished item of work in all floors.( APSS No.126)

1606.4

79

128175

... More
CONCTRUCTION OF TOILETS;BLD-CSTN-9-18-(116) see Ref:9-23-(121-b): Dadooing to walls with plain white glazed wall tiles of any size and of 5 to 7 mm thick set over a base coat of CM(1:3) Prop. 12mm thick and neat Gray cement slurry of Honey like consistancy sread at the rate of 3.30 Kg of cement per One Square Meter and jointed wiyh neat White cement paste mixed with pigmant of matching shade including cost and conveyance of all materials like cement, sand, water, flooring Tiles etc. to site, all operational, incidental and labour charges such as mixing of cement mortar, laying, jointing, curing, lift charges etc., complete for finished item of work (for toilets)

85.36

629

53751

... More
CONCTRUCTION OF TOILETS;BLD-CSTN-9-6-(104) : Flooring with Non-skid red or white full body Ceramic floor tiles of size 300 x 300 mm and thickness between 7-8 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and design, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete, for finished item of work,including the cost and conveyance of all materials.

32

973

31147

... More
CONCTRUCTION OF TOILETS;BLD-CSTN-8-2-(77) : Plastering with 12mm thick in single coat in CM (1:4) finished smooth including cost and conveyance of all materials to site, ,on all materials, finishing, curing, scaffolding and all operational, incidental, labour charges etc., including cutting grooves where ever necessary etc., complete for finished item of work. (As per SS 903).

32

214

6862

... More
CONCTRUCTION OF TOILETS;BLD-CSTN-8-10-(85) : Plastering 12mm thick in two coats with base coat of 8mm thick in C.M. (1:5) and top coat of 4mm thick in C.M. (1:3) with dubara sponge finishing including cost & conveyance of all materials like cement, Sand , Water, etc., to site, seigniorage charges, all operational, including charges, labour charges for mixing mortar, finishing, scaffolding, lift charges, curing , including cutting grooves where ever necessary etc., complete for finished item of work of uneven surfaces of walls. (Internal walls)

119.28

544

64978

... More
CONCTRUCTION OF TOILETS;BLD-CSTN-8-9-(84) : Plastering 20mm thick two coats with base coat of 16mm thick in C.M. (1:6) and top coat of 4mm thick in C.M. (1:3) with dubara sponge finishing including cost & conveyance of all materials like cement, Sand , Water, etc., to site, , all operational, including charges, labour charges for mixing mortar, finishing, scaffolding by using MS Jack Prop Cup lock Pipe , lift charges, curing , including cutting grooves where ever necessary etc., complete for finished item of work of uneven surfaces of walls. (External walls)

190.48

574

109433

... More
CONCTRUCTION OF TOILETS;BLD-CSTN-5-11 (49) : 11.5 cm wide Brick masonry for super-structure on ground floor in cm (1:3) using second class traditional size bricks including cost of all materials, labour and all operations for constructing half brick masonry, mixing cement mortar, curing etc., complete for finished item of work, but excluding conveyance charges of materials.

66.18

1035

68530

... More
CONCTRUCTION OF TOILETS;BLD-CSTN-5-4-(42): Brick Masonary 2nd Class Ground moulded or treditional size 23x11x7 Cm in Cement Mortor 1:6 Prop including Cost & conveyance of all Materials like Cement, Sand, Bricks, Water, etc., to site cost of, including all labour charges like mixing Cement Mortor, scaffoding charges lift charges, curing charges etc., complete for finished item of work

19.93

8311

165644

... More
CONCTRUCTION OF TOILETS;BLD-CSTN-6-12-(67) : Construction of RR Masonary in Cement Mortor ( 1:6 ) Prop using hard granite stone including cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones, including ,on all Materials, ,labour charges for cutting Stones to required size and shape, mixing of Cement Mortor ,Construction, Scaffolding Charges curing etc., complete for finished item of Work.

5.33

5377

28660

... More
CONCTRUCTION OF TOILETS;BLD-CSTN-6-12-(67) : Construction of RR Masonary in Cement Mortor ( 1:8 ) Prop using hard granite stone including cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones, including , ,labour charges for cutting Stones to required size and shape, mixing of Cement Mortor ,Construction, Scaffolding Charges curing etc., complete for finished item of Work .

9.47

5255

49772

... More
CONCTRUCTION OF TOILETS;BLD-CSTN-3-16-(31)-C : Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering, shuttering charges etc.,complete but excluding cost of steel and its fabrication charges (APSS No. 402) with minimum cement content as per IS code for finished item of work. for RCC SLABS, BEAMS ( using Steel Scaffolding ) Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the defference in cost shall be deducted. Roof Beams

3.06

13508

41337

... More
CONCTRUCTION OF TOILETS;BLD-CSTN-3-16-(31)-C : Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering, shuttering charges etc.,complete but excluding cost of steel and its fabrication charges (APSS No. 402) with minimum cement content as per IS code for finished item of work. for RCC SLABS, BEAMS ( using Steel Scaffolding ) Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the defference in cost shall be deducted. Roof Slab 125mm thick-

5.35

12998

69542

... More
CONCTRUCTION OF TOILETS;BLD-CSTN-3-15- ( 31 ) -B: Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering and suttering charges etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code for COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the defference in cost shall be deducted.Lintels

0.33

14780

4878

... More
CONCTRUCTION OF TOILETS;BLD-CSTN-3-15- ( 31 ) -B: Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering and suttering charges etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code for COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the defference in cost shall be deducted.Clolumns upto Plinth Top level

2

14618

29236

... More
CONCTRUCTION OF TOILETS;BLD-CSTN-3-14-(31) - A : Supply and placing of the M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. (APSS No. 402) with minimum cement content as per IS code for PLINTH, PEDESTALS and FOOTINGS. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deducted. Plinth Beams

2.38

14232

33874

... More
CONCTRUCTION OF TOILETS;BLD-CSTN-3-14-(31) - A : Supply and placing of the M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. (APSS No. 402) with minimum cement content as per IS code for PLINTH, PEDESTALS and FOOTINGS. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deducted. Pedastals

1.46

12071

17625

... More
CONCTRUCTION OF TOILETS;BLD-CSTN-3-14-(31) - A : Supply and placing of the M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. (APSS No. 402) with minimum cement content as per IS code for PLINTH, PEDESTALS and FOOTINGS. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deducted. Footings

3.83

11483

43981

... More
CONCTRUCTION OF TOILETS;BLD-CSTN-3-7-(24) Using Concrete mixture all works up to Plinth Level Plain Cement concrete nominal mix (1:5:10) prop (Cement : fine aggregate: coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed.

7.72

5630

43465

... More
CONCTRUCTION OF TOILETS;BLD-CSTN-2-11 ; (New Item) : Earth work excavation Hard rock (blasting prohibited)-Up to 3 m depth using Hydraulic Excavator with Breaker Attachment for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring,sheeting, planking, strutting, etc. complete for finished item of work excluding seigniorage anf dewatering charges etc as per SS - 20 B (APSS 308)

9.57

1004

9613

... More
CONCTRUCTION OF TOILETS;BLD-CSTN-2-2(10):Earth work excavation in Ordinary soils by Mechcanical Means-Upto 3 m depth for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, including backfilling etc. complete for finished item of work excluding dewatering charges etc as per SS - 20 B (APSS 308).

33.51

127

4262

... More
CONCTRUCTION OF TOILETS;BLD-CSTN-2-1 (9): Earth work excavation in Ordinary Soil by Manual Means-Upto 3 m depth for structures in all types of soil as per drawing and technical specifications and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work excluding dewatering charges etc as per SS - 20 B (APSS 308).

4.79

270

1296



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.