For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Municipality Tender
Civil And Construction
Drainage Work
Opening Date24 Jan 2024
Closing Date30 Jan 2024
Tender Amount₹ 11,84,335
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
492746Bid Award Id
ViewTender No
E1/MHBD/MPLTY/EPROC-28/2023-24,DT:24-01-2023Tender Authority
Municipality ViewPurchaser Address
-Website
http://tender.telangana.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
BOQ;Providing concrete for V.C.C. M30 using 20mm nominal size graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications etc., complete.
84.38
6405
540510
BOQ;Supply of 25.4mm thick masticpad , placing the same 25mm below top of the pavement slab at 5.00Mts interval in C.C Pavement including cost and conveyance of materials, labour charges etc., complete.
56.25
164
9235
BOQ;Supply and Filling of Gravel in foundation trenches including cost & conveyance of all materials, labour charges, seigniorage charges etc., complete.
13.5
321
4345
BOQ;Earthwork excavation and depositting on bank with an initial lead of 10.00Mts and lift of 2.00Mts in loamy, Clayey soils, etc. complete for finished item of work.
1
-
-
BOQ;70% machinary
105.9
133
14142
BOQ;30% Manual
45.38
439
19947
BOQ;Supply and Filling of HBG stone chips 2.36 mm and below in foundation trenches including cost & conveyance of all materials, labour charges, seigniorage charges etc., complete.
9.97
1004
10018
BOQ;Laying of V.C.C. (1:4:8) using 40 mm m/c metal and OPC,coarse and fine aggregate with concrete mixture. All work upto plinth level including cost & conveyance of all materials, labour charges, machine mixing, centering, laying in position, curing etc., complete.
19.93
5139
102433
BOQ;P.C.C M15 using 20 mm m/c metal and OPC, coarse and fine aggregate with concrete mixture. All work upto plinth level including cost & conveyance of all materials, labour charges, machine mixing, cetering, laying in position, curing etc. complete.(side Walls)
42.3
5887
249034
BOQ;P.C.C M15 using 20 mm m/c metal and OPC, coarse and fine aggregate with concrete mixture. All work upto plinth level including cost & conveyance of all materials, labour charges, machine mixing, cetering, laying in position, curing etc. complete.(vent portion)
5.27
5660
29833
BOQ;Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and technical specifications for Bars below 36 mm dia including over laps and wastage, where they are not welded.
180
75
13541
BOQ;Providing concrete for VRCC M30 using 20mm nominal size graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications etc., complete.
1.8
6810
12259