For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Municipality Tender

Works
Civil And Construction
Pipe Line Project
Opening Date25 Nov 2024
Closing Soon3 Dec 2024
Tender Amount₹ 3,17,437 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
HDPE pipeline;Supply of 12.5mm thick masticpad (Expansion joint filler board), placing the same 25mm below top of the payment slab sealing with hot sealing compound (Grade-A ISI) Polysulphide at 5mts intervals in CC pavement including cost and conveyance of materials, labour charges for placing in position for expansion joints conformining to MoRTH - 1rmt

6

152

914

... More
HDPE pipeline;Laying VCC in M30 grade Design mix 20mm graded SS-5 HBG m/c metal , coarse and fine aggregates conforming to IS: 383, and OPC cement including cost and conveyance of all materials, machinery, all labour charges (including placing in position expansion, contraction, construction, longitudinal joints and corner reinforcement if any but excluding cost of joint filler, sealant and reinforcement and its fabrication ), centering, vibration, curing for 21 days and all incidental & operational charges etc. complete conforming to standard specification for CC Pavement - 1 Cum

5.4

6544

35341

... More
HDPE pipeline;Supply and placing separation membrane of impermeable plastic sheeting 125 micron thick under pavement slab including cost and conveyance etc. complete - 1 sq.m.

75

19

1448

... More
HDPE pipeline;Vibrated reinforced cement concrete M 30 grade with design mix using 20mm & 10mm HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2), excluding cost & seigniorage conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including all other incidental and operational charges of all T&P etc., complete for finished item of work as per drawing BD/1-69( A) but excluding cost of steel and its fabrication charges as per MoRT&H specification 1500, 1600,1700, & 2702 (5th Revision) and as directed by the Engineer-in-Charge for culvert slab.

1.32

6434

8493

... More
HDPE pipeline;Supplying, cutting, placing HYSD Bar reinforcement in foundation complete as per drawing and technical specification for bars below 36mm dia including over laps and wastage where they are not welded.

132

90

11887

... More
HDPE pipeline;Vibrated cement concrete M 15 Grade Concrete using 40mm , 20mm and 10mm size HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2), including cost, and conveyance of all materials to site and all labour charges for machine mixing, laying in position,Compacting, Vibrating and curing including all other incidental and all other operational charges of T&P required etc., complete as per MoRT&H Specification 1500,1700, 2200 (5th Revision)

2.39

5262

12578

... More
HDPE pipeline;Providing Vibrated Cement Concrete (1:5:10) mix using 40mm size HBG crushed stone aggregate and fine aggregate conforming to table 1000-2 of MoRT&H including cost, conveyance of all materials to site and labour charges, centering, machine mixing, laying, Vibrating, curing etc., including all other incidental and operational charges of all T&P etc., complete for finished item of work as per MoRT&H specification 1500,1700, 2100 (5th Revision) and as directed by the Engineer-in-Charge for base coarse below CC Pavement.

1.2

3940

4728

... More
HDPE pipeline;Collection, supply and filling of Sand from approved quarry to work site and stacking at work site to Dept. guage for premeasurements including cost and conveyance of all materials, labour charges etc complete as per standard specification.

0.8

1244

995

... More
HDPE pipeline;RBR-FNDN-1: Earth work excavation in all types of soils as per specifiction, drawings and as directed by the departmental officer and protecting the walls and other stuctures etc. so as not to disturb the existing utillity services i.e. water supply and sewer pipe lines, telephone and power supply cables/ducts, storm water drains, traffic signals etc. duting the execution taking all precuationary measures in the restricted areas including diversion of traffic and backing gilling in the trenches with excavated suitable material and disposal of remaining earth up to a lead of 50 m including all incidental and operational charges etc. complete for drains/Roads (As per detailed estimate)

5.2

450

2344

... More
HDPE pipeline;Providing Vibrated Cement Concrete M 15 nominal mix using 40mm size HBG crushed stone aggregate and fine aggregate conforming to table 1000-2 of MoRT&H including cost, conveyance of all materials to site and labour charges, centering, machine mixing, laying, Vibrating, curing etc., including all other incidental and operational charges of all T&P etc., complete for finished item of work as per MoRT&H specification 1500,1700, 2100 (5th Revision) and as directed by the Engineer-in-Charge for base coarse below CC Pavement.

8.95

5298

47421

... More
HDPE pipeline;Construction of 904.40cum dia (3'-0")dia solid block Masonary inspection Chambers as per IS4111 Part :1986 with cement mortar (1:6)promp using fly-ash blocks of 225mm thick from approved source having a minimum crushing strength of 10n/ Sqmm including plastering with CM(1:3) prop 1/2" brick both inside and outside fitted with 20'' dia RCC manhole covers and frames including exvacation pits up to a depth of 904mm (3'-0'') in all sorts of soils (excluding rock) and laying cemenet concrete (1:4:8) 150mm thick using 40mm HBG metal and PCC 1:2:4 bencing and channel 100mm thick as per specification and including cost and conveyance of all materials like cement,sand,bricks,water etc complete to site cost of seignaiorage charges on all materials and all labour charges and all incidential charges and operatinal, labour charges like mixing cement,mortar,constructing masonary,lift charges,curing etc. for finished item of work. Sor 2018-19 :- Pages:135 Sl no.74 TBSP B.1.01

2

9870

19742

... More
HDPE pipeline;Constructing 457.2 mm x 457.2 mm(1'6" x 1' 6") brick in cm 1.6 prop masonry inspection chambers upto 914.4 mm (3'0") fitted with high weight 457.2 mm x 457.2 mm (1'6" x 1'6") C.I. frame and cover of 20 kg etc. complete.

5

5237

26188

... More
HDPE pipeline;Lowring the RCC S/S pipes carefully into the ready made trenches Laying them ture to alignment and gradient, jointing with rubber rings and testing including filling with water with water lead up to 500 meters including cost of reberrings

25

183

4598

... More
HDPE pipeline;Lowring the RCC S/S pipes carefully into the ready made trenches Laying them ture to alignment and gradient, jointing with rubber rings and testing including filling with water with water lead up to 500 meters including cost of reberrings

15

281

4229

... More
HDPE pipeline;Manufactures supply and delivery of RCC Spun/vibrated cost (reinforced) socket and spigot pipes conforming TO B.I. S458/2003. EX-Factory (Rate per meter of Effetive Length) Excluding Transportati Taxes, Duties, etc complete. NP3 900mm dia

25

1654

41366

... More
HDPE pipeline;Manufactures supply and delivery of RCC Spun/vibrated cost (reinforced) socket and spigot pipes conforming TO B.I. S458/2003. EX-Factory (Rate per meter of Effetive Length) Excluding Transportati Taxes, Duties, etc complete. NP3 600mm dia

15

4214

63224

... More
HDPE pipeline;RBR- FNDN-2 Collection , supply and filling of HBG Stone chipes 2.36mm and below spall from approved quarry to work site and stocking at work site to dept guage for premeasurements including cost and conveyance of all materials and labour charges etc., complete as per standard specification clause 305.39 MORD & 304 MORTH

16.65

1264

21051

... More
HDPE pipeline;Earth work in excavation of structures as per drawing and technical specifications including setting out construction of shoring and bracing removal of stumps and other deleterious materials and disposal up to a lead of 50m, dressing of sides and bottom and back filling in trenches with excavated suitable material as per technical specification by machernary

20.25

128

2597

... More
HDPE pipeline;Dismantling of existing structures like culverts, bridges , retaining walls and other structure comprising of stone masonry, including disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as technical specification clause 202 MORD / MORTH.

3.38

930

3143



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.