Municipality Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Municipality Tender

Works
Civil And Construction
Building Construction
Opening Date15 Jan 2025
Closing Date16 Jan 2025
Tender Amount₹ 4,03,160 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Developmental works;TBSP-H.IV-01:Labour charges for laying, fixing and commissioning the PVC pipes including couplers/ bends/ tees etc. any diameter including fixing necessary fittings like bends, plugs, couplers, junctions, tees, etc. with solvent jointing as per standard practice

10

111

1113

... More
Developmental works;Supply & Delivery of 4" (101.6 mm ) Nahany Trap ( Without Jali with inlet)UPVC/SWR Pipe fittings TBSP-H.11-69

5

152

761

... More
Developmental works;Supply & Delivery of 75 mm dia - Single Tee - UPVC/SWR Pipe fittings TBSP-H.11-22

5

80

403

... More
Developmental works;Supply & Delivery of 75 mm dia - 45 Degree Bend - UPVC/SWR Pipe fittings TBSP-H.11-16

8

53

427

... More
Developmental works;Supply & Delivery of 75 mm dia - Door Bend 87.5 Degree - UPVC/SWR Pipe fittings TBSP-H.11-13

3

92

276

... More
Developmental works;Supply & Delivery of 75 mm dia - Plain Bend 87.5 Degree - UPVC/SWR Pipe TBSP-H.11-10

5

69

347

... More
Developmental works;Supply & Delivery of 75 mm dia - Double Tee with Door - UPVC/SWR Pipe fittings TBSP-H.11-31

4

268

1073

... More
Developmental works;75 mm dia 3 M Kg/sq.cm Double Socket PVC/SWR pipe - 4 TBSP-H-1-.4

8

385

3081

... More
Developmental works;75 mm dia 3 M Kg/sq.cm Single Socket PVC/SWR pipe - 4 TBSP-H.1-01

8

341

2736

... More
Developmental works;Supply & Delivery of 110 x 75 mm dia - Reducer - UPVC/SWR Pipe fittings TBSP-H.11-50

8

78

627

... More
Developmental works;Supply & Delivery of 110 mm dia - Single Tee - UPVC/SWR Pipe fittings TBSP-H.11-24

3

146

440

... More
Developmental works;Supply & Delivery of 110 mm dia - 45 Degree Bend - UPVC/SWR Pipe fittings TBSP-H.11-18

4

95

382

... More
Developmental works;Supply & Delivery of 110 mm dia - Door Bend 87.5 Degree - UPVC/SWR Pipe fittings TBSP-H.11-15

4

145

582

... More
Developmental works;TBSP-H.II-12 :Supply & Delivery of 110 mm dia - Plain Bend 87.5 Degree - UPVC/SWR Pipe fittings

10

113

1136

... More
Developmental works;TBSP-H.I-28:Supply & Delivery of 110 mm dia 3 M 6Kg/sq.cm Double Socket PVC/SWR pipe

12

1220

14643

... More
Developmental works;TBSP-H.I-25:Supply & Delivery of 110 mm dia 3 M Single Socket PVC/SWR pipe - 6 Kg/sq.cm

12

1104

13252

... More
Developmental works;TBSP-H.II-01:Providing & Placing on Terrace (at all floor levels) polyethylene water storage tank with Double layer approved brand & manufacture with cover and suitable locking arrangement & making necessary holes for inlet & outlets and over flow pipes but without fittings & base support for tanks

500

11

5680

... More
Developmental works;RBR-STCL-5: Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202 MORD / MORTH

2.04

777

1587

... More
Developmental works;BLD-CSTN-9-1-(99) : Flooring with Shahabad / Tandur Rough Stone slabs of all sizes between 25 mm - 40 mm thickness set over base coat of CM (1:8) over already laid CC bed / RCC Roof Slab, including neat cement slurry of honey like consistency spread @ 3.3 kgs per sqm. & Jointed with neat cement to full depth including cost of all materials like cement, sand, and water and flooring stones etc., complete, including seigniorage charges, labour charges for dressing of flooring stones etc., complete for finished item of work, including the cost and conveyance of all materials.

24.89

701

17466

... More
Developmental works;Fixing of precast kerbing blocks of 600mm length true to its alignment as specified by the department to form divider/ median including pointing with cement mortar ( 1:3 ) prop. Cost and conveyance of all materials like cement, sand and water etc,. To site including curing and labour charges for mixing etc, complete.

33.15

68

2265

... More
Developmental works;Supply of precast cc blocks for kerbing made with rubberized moulds of M-30 grade design mix with 350 Kgs cement, 0.80cum of 20mm to 6mm nominal hard granite machine crushed metal and 0.40 cum of sand for 1 cum of cement concrete including cost and conveyance of all material like sand, water, coarse aggregate etc,.complete.

33.15

333

11050

... More
Developmental works;BLD-CSTN-3-5 (22) - Using Concrete mixture all works up to Plinth Level: Plain Cement concrete nominal mix (1:5:10) prop (Cement : fine aggregate: coarse aggregate ) using 20mm size graded Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , seigniorage charges on all materials, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed.

3.14

5277

16573

... More
Developmental works;BLD-CSTN-8-9-(84) : Plastering 20mm thick in two coats with base coat of 16mm thick in C.M. (1:6) and top coat of 4mm thick in C.M. (1:4) with dubara sponge finishing including cost & conveyance of all materials like cement, Sand , Water, etc., to site, seigniorage charges, all operational, including charges, labour charges for mixing mortar, finishing, scaffolding, lift charges, curing , including cutting grooves where ever necessary etc., complete for finished item of work of uneven surfaces of walls. (External walls)

68.02

563

38297

... More
Developmental works;BLD-CSTN-5-4-(42): Brick Masonary 2nd Class Ground moulded or treditional size 23x11x7 Cm in Cement Mortor 1:6 Prop including Cost & conveyance of all Materials like Cement, Sand, Bricks, Water, etc., to site cost of Seigniorage charges on all materials, including all labour charges like mixing Cement Mortor, scaffoding charges lift charges , curing charges etc., complete for finished item of work

8.18

8207

67135

... More
Developmental works;BLD-CSTN-3-21 ( 33 ) Damp proof course 50mm thick with 1:2:4 cement concrete Nominal mix, using 12mm hard broken stone aggregate including cost of all materials, including conveyance charges of materials cost of machinery, labour charges, mixing, placing in position, leveling, vibrating, curing etc. complete for finished item of work. (Using concrete mixer)

3.96

262

1041

... More
Developmental works;BLD-CSTN-6-13-(68) : Construction of RR Masonary in Cement Mortor ( 1:8 ) Prop using hard granite stone including cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones, including Seigniorage Charges on all Materials, ,labour charges for cutting Stones to required size and shape, mixing of Cement Mortor ,Construction, Scaffolding Charges curing etc., complete for finished item of Work (Above GL)

1.39

4585

6374

... More
Developmental works;BLD-CSTN-6-13-(68) : Construction of RR Masonary in Cement Mortor ( 1:8 ) Prop using hard granite stone including cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones, including Seigniorage Charges on all Materials, ,labour charges for cutting Stones to required size and shape, mixing of Cement Mortor ,Construction, Scaffolding Charges curing etc., complete for finished item of Work (below Ground Level)

3.17

4585

14536

... More
Developmental works;BLD-CSTN-2-1 (9): Earth work excavation in Ordinary Soil by Manual Means-Upto 3 m depth for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work including seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308).

9.09

127

1156



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.