Municipality Tender

... More
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Municipality Tender

Civil And Construction
Bridge Construction
Opening Date29 Jun 2023
Closing Date3 Jul 2023
Tender Amount₹ 3,60,408 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of RCC Slab Culvert at Opp;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, but including centering and shuttering charges

4.83

9946

48041.6

... More
Construction of RCC Slab Culvert at Opp;BLD-CSTN-4-1-(34): Providing High Yield Strength Deformed (HYSD)/ Mild steel (MS) steel bars (Fe 500/550/550D) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including complete for finished item of work in all floors.( APSS No.126)BLD-CSTN-2-18

230

108

25033.2

... More
Construction of RCC Slab Culvert at Opp;Plain Cement concrete M15 (1:2.5:5) (Cement : fine aggregate: coarse aggregate ) using 20,10 mm metal with concrete mixture. Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc. to site , labour charges , for mixing , laying, concrete , ramming in 15 cm layer by layer , finishing top surface to the required level curing etc., complete for finished item of work.

3.53

5948

20997

... More
Construction of RCC Slab Culvert at Opp;Plain Cement concrete M15 (1:2.5:5) (Cement : fine aggregate: coarse aggregate ) using 40,20,10 mm metal with concrete mixture. Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc. to site , labour charges , for mixing , laying, concrete , ramming in 15 cm layer by layer , finishing top surface to the required level curing etc.,including formwork charges complete for finished item of work.

19.58

6060

118662.44

... More
Construction of RCC Slab Culvert at Opp;(BLD-CSTN 3-2) - Plain Cement Concrete M10 Nominal Mix; using 40mm guage hard granite machine crushed metal including cost and conveyance of all materials to site, centering, machine mixing, lifts and delifts, leads, laying in position, compacting, curing, all labour charges, etc., complete as directed by the departmental officers.

5.45

5403

29447.77

... More
Construction of RCC Slab Culvert at Opp;carting of excavated surplus materials including loading,unloading charges by manual and transporting materials by tippers and trucks with an initial lead of upto 5 km

32.76

113

3721.54

... More
Construction of RCC Slab Culvert at Opp;Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work including excluding dewatering charges etc as per SS - 20 B (APSS 308)

46.8

419

19625.58

... More
Construction of RCC Slab Culvert at Opp;Item Detailed Specification Description

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.