Municipality Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Municipality Tender
Civil And Construction
Civil Works Others
Opening Date5 Sep 2024
Closing Date11 Sep 2024
Tender Amount₹ 26,43,715
Costs
EMD
₹ 26,437Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
541336Tender No
E1/MHBD/MPLTY/EPROC-07/2024-25, DT:05-09-2024Tender Authority
Municipality ViewPurchaser Address
-Website
http://tender.telangana.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
BOQ;Broadcasting of orthodox hard-coated treated seeds of local forest species.(10 Kg per Ha)
3.8
1238
4706
... More
BOQ;Planting in 0.30 Cum pit
38000
133
50882
... More
BOQ;15 X 30 cm (3" X 12") bag Plants
7600
87
6646
... More
BOQ;12.5 X 22.5 Cm (5" X 9") Bag Plants
30400
56
17191
... More
BOQ;Internal transportation to planting points on head loads
1
-
-
... More
BOQ;15 X 30 cm (3" X 12") bag Plants
7600
3
293
... More
BOQ;12.5 X 22.5 Cm (5" X 9") Bag Plants
30400
2
623
... More
BOQ;Transportation of Planting Stock (including loading and unloading) more than 5 km distance and upto 25 km distance
1
-
-
... More
BOQ;Digging of 0.30 Cum Pits in Ploughed Areas in July- August by adopting 50% of original rate of digging of pits of ordinary soil (also on bund)
38000
2
85500
... More
BOQ;Deep Ploughing the effective plantation area across the slope up to a depth of 30cm with Heavy-duty Tractor of 55 HP and above with Firm Mould Board (FMB) plough.
3.8
3056
11613
... More
BOQ;Varmi Compost application including cost and conveyance @ Cft
665
2291
1524140
... More
BOQ;Cost and application of Urea
1140
10
11400
... More
BOQ;Waterings 30 times till next rainy season (two waterings from Aug to Jan ; four waterings from Feb to May & two waterings in June) - 4 tankers of 5000 Ltr capacity/ each As per SoR 2019-20 (Sl. No. 10 in Hire charges), Rs,698.88/ 6000 Ltrs for transportation. Cost of water (Rural) @ Rs,73/1000 Ltrs (Sl. No.275)
114000
-
21660
... More
BOQ;Ploughing the site with cultivator. (Rate of two times of inter ploughing using tractors with cultivator - Rs,1901.15/Ha) criss-cross ploughing
7.6
1901
14449
... More
BOQ;Digging of Soil upto depth of 30 Cm and keeping soil on all four sides of plot with JCB - Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with all lifts and lead upto 1000 m as per Technical Specification Clause 302.3 MORD / 301 MORTH
7980
22
182183
... More
BOQ;Collection and Removal of Uprooted Stumps of all sizes, other debris etc., to outside the plantation site. (a) Sparse Jungle Growth (< 10% ground area covered with Jungle growth)
3.8
5520
20976
... More
BOQ;Uprootal of Stumps to a minimum depth of 45 cm with heavy machinery fitted with 0.90 cum and above capacity bucket. (a) Sparse Jungle Growth (< 10% ground area covered with Jungle growth)
3.8
5184
19700
... More
BOQ;Clearing unusable unwanted jungle growth (a) Sparse Jungle Growth (< 10% ground area covered with Jungle growth)
3.8
1982
7533
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements