Municipality Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Municipality Tender

Works
Civil And Construction
Road Construction
Opening Date21 Nov 2024
Closing Soon26 Nov 2024
Tender Amount₹ 4,09,892 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Laying of UGD;Manufacture, Supply and Delivery of R.C.C. Spun / Vibrated Cast (Reinforced) Socket and Spigot pipes conforming to B.I.S. 458/2003 at ex factory (rate per meter of effective length) Excluding transportation & taxes (FOR R.C.C. S/S PIPES NP3 SSR 2020-21 )

115

1579

181613.75

... More
Laying of UGD;Lowering the 300mm dia RCC S/S NP 3 pipes carefully into the trenches laying them true to alignment and gradient, jointing with rubber rings and testing including filling with water with a water lead upto 500 meters including cost of rubber rings as per BIS No. 783/1985 (PHE-LRCS-6)

115

251

28919.05

... More
Laying of UGD;Constructing 904.4mm (3?0?) dia solid block masonry inspection chamber with Earth work , PCC (1:4:8) prop.Using 40mm nominal size hand broken granite metal of 15cm thick, Brick Masonry work in CM 1:5 base on PCC using solid Bricks of 0.10 mtr height 0.35 mtr thick, Brick Masonry work in CM 1:4 using solid Bricks with slanting wall from 1.2 mtr dia to 0.56 mtr dia at top with 0.23 mtr thick, Plain Cement concrete (1:2.5:5) using 20 mm metal with hand mixing upto Plinth level for top cover, External Plastering 12mm thick with cement mortor C.M (1:4) prop., Plastering to internal walls in 20mm thick with cement mortor C.M (1:5), Suply and delivery and fixing of Encapsulated steps for man holes finishing of steps, Supply and delivery and fixing of Heavy duty grade 20 with 560mm dia clear opening man hole cover and frames (S.F.R.C) Carting of excavated soils Refilling with excavated soil - 0.9 mtr depth

6

9870

59225.22

... More
Laying of UGD;Constructing 904.0 mm (3?0?) dia solid block masonry inspection chamber as per IS - 4111: Part-1:1986 with cement mortar (1:6) prop using fly-ash blocks of 225 mm thick from approved source having a minimum crushing strength of 10 N/sq.mm including plastering with cement mortar 1:3 prop; ½? thick both inside and outside fitted with 20? dia RCC manhole covers and frames including excavating pits up to a depth of 1524 mm (5'-0") in all sorts of soils (excluding rock) and laying cement concrete (1:4:8) 150 mm thick using 40 mm HBG Metal and P.C.C. 1:2:4 benching and hannel 100 mm thick as per Standard specification and including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, cost of seigniorage charges on all materials and all incidental and perational, labour charges like mixing cement mortar, constructing masonry, lift charges, curing etc., complete for finished item of work as per Standard specification. Each Rs. 11,912.00/- TBSP-B.I-02 SSR 20-21

2

16004

32009.88

... More
Laying of UGD;Refilling with available excavated earth, filling charges, watering, tamping and rammming and all labour charges and operational charges complete as directed by the Departmental officers

99.36

38

3814.43

... More
Laying of UGD;Carting of excavated soils up to a lead of 5.0Km including loading and unloading etc.complete for finished item of work

24.84

72

1803.38

... More
Laying of UGD;Filling with good Gravel soil, including supply and delivery of good gravel for filling, including cost of gravel and conveyance to site, filling charges, watering, tamping and rammming and all labour charges and operational charges complete as directed by the Departmental officers (RBR-FNDN-2)

39.92

321

12847.42

... More
Laying of UGD;Extra 0.1m additional depth for 0.9 mtr dia chamber

10

1343

13436.5



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.