Municipality Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Municipality Tender

Civil Works
Opening Date8 Aug 2021
Closing Date25 Aug 2021
Tender Amount₹ 12,05,88,789 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of Integrated Market;BLD-CSTN-5-4-(42): Brick Masonary 2nd Class Ground moulded or treditional size 23x11x7 Cm in Cement Mortor 1:6 Prop including Cost & conveyance of all Materials like Cement, Sand, Bricks, Water, etc., to site including all labour charges like mixing Cement Mortor, scaffoding charges lift charges , curing charges etc., complete for finished item of work

10.29

-

67146

... More
Construction of Integrated Market;BLD-CSTN-3-11-(28) Using Concrete mixture up to Plinth Level : Plain Cement concrete nominal mix m-20 (Cement : fine aggregate: coarse aggregate ) using 20mm size Hard Granite Machine Crushed Graded Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work with nomonal reinforcement

0.98

-

5433

... More
Construction of Integrated Market;BLD-CSTN-2-8 (16) and amendment SOR 2021-22 : Supply & filling with Crushed stone sand / Rock sand 4.75mm to 2.36 mm in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

13.5

-

14734

... More
Construction of Integrated Market;BLD-CSTN-2-8 (16) and amendment SOR 2021-22 :Supply, Filling 20mm metal in readymade trench icluding cost and conveyance of all material and all labour charges etc for water harvesting structure., for finished item of work. (APSS NO. 309 & 310)

6

-

10350

... More
Construction of Integrated Market;BLD-CSTN-2-8 (16) and amendment SOR 2021-22 :Supply, Filling 40mm metal in readymade trench icluding cost and conveyance of all material and all labour charges etc for water harvesting structure., for finished item of work. (APSS NO. 309 & 310)

6

-

7239

... More
Construction of Integrated Market;BLD-CSTN-2-8 (16) and amendment SOR 2021-22:Supply, Filling 65mm metal in readymade trench icluding cost and conveyance of all material and all labour charges etc for water harvesting structure., for finished item of work. (APSS NO. 309 & 310)

12

-

12007

... More
Construction of Integrated Market;BLD-CSTN-2-8 (16) and amendment SOR 2021-22 :Supply, Filling and packing Rough / soling stone in ready made trench icluding cost and conveyance of all material and all labour charges etc for water harvesting structure., for finished item of work. (APSS NO. 309 & 310)

24

-

14199

... More
Construction of Integrated Market;BLD-CSTN-2-1 (9): Earth work excavation in Ordinary Soil by Manual Means-Upto 3 m depth for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, including backfilling etc. complete for finished item of work excluding dewatering charges etc as per SS - 20 B (APSS 308).

57.3

-

14515

... More
Construction of Integrated Market;Golden Junipus

50

-

32500

... More
Construction of Integrated Market;Crinum lilly (Broad leaf) 21?

50

-

32500

... More
Construction of Integrated Market;Furcraea 21?

50

-

17500

... More
Construction of Integrated Market;Supply and delivery of _____ Plant Material including cost of material, transportation, labour charges for loading, unloading etc., complete for delivery at site as per the instructions of the Engineer-in-Charge Black Bamboo 21?

50

-

60000

... More
Construction of Integrated Market;Based on Item No.5.b of HMDA (FSR), Pg.31-Planting of individual shrub/rose/ornamental Bamboo: Digging the pits size 0.60x0.60x0.45m, refilling the pit with red soil including cost red soil and farmyard manure at 4:1 ratio, internal transportation of plants and planting the plants including the application of fertilizers and pesticides(@20 gms/pit/sqmt) etc., complete but cxcluding the cost of the fertilizers (@20 gms/pit/sqmt) and plant material

20

-

7836.4

... More
Construction of Integrated Market;Based on Item No.4.b of HMDA (FSR), Pg.31-Topiary/Palms/Garden tree planting: Digging of 75x75x75 cm pit, filling with soil mixture of red soil farmyard manure, at 4:1 ratio including internal transport, application of fertilizers and chemicals (@ 20 gms/pit/sqmt), internal transportation of plants and planting the plants (excluding the cost of the fertilizers @ 20 gms/pit/sqmt) and plant material

35

-

29688.75

... More
Construction of Integrated Market;Based on Item No.3.b of HMDA (FSR 2019-20 ), Pg.39- Hedge/shrub planting: : Digging the trench of size 30cm depth, refilling the trench with red soil including cost of red soil and farmyard manure at 4:1 ratio internal transportation of plants and planting the plants including the application of fertilizers and perticides etc., (@ 20 gms/pit/sqmt) complete but excluding the cost of the fertilizers @ 20 gms/pit/sqmt) and plant material

120

-

103138.8

... More
Construction of Integrated Market;Topiary / Palms / Garden tree planting ? Digging of 60x60x60 cm pit, filling with soil mixture of red soil, farmyard manure, sand at 3:1:1 ratio including internal transport, application of fertilizers and chemicals (@ 20 gms/pit/sqmt), internal transportation of plants and planting the plants (excluding cost of plant material, fertilizers and chemicals (@ 20 gms/pit/sqmt))

110

-

48198.7

... More
Construction of Integrated Market;Item No.2.a (i) of HMDA (FSR-2019-20), Pg.39 -CARPET GRASS-KOREAN / MEXICAN : Making lawns by Dressing the surface to the desired shape, laying 6" layer of fine red soil, covered with a thin layer of sand, watering, rolling with hand roller (4" thckness after rolling), Laying carpet grass and ramming and regular watering and removal of weeds , Protection etc for 45 days for initial establishment including the cost of carpet grass, red earth, sand and labour charges and the cost of fertlizers, chemical complete as per standard practice.

650

-

420186

... More
Construction of Integrated Market;RBR-EECD-8(c): Earthwork excavation for road way in soil by mechanical means including cutting and pushing the earth to side of embankment upto a lead of 100 metres including trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections etc., complete for finished item of work for trench cutting as per MOR&H specification No.301 and as directed by the Engineer-in-Charge- (Hydraulic Excavator)

650

-

46228

... More
Construction of Integrated Market;Supplying and fixing of SWR PVC pipes (Prince/Sudhakar/Kisan/Supreme or any approved brand) 4 Kg/Sq.cm. including Labour charges for laying, fixing and commissioning the PVC pipes including couplers/ bends/ tees, PVC clamps if necessary with required number of Bombay nails etc. any diameter including fixing necessary fittings like bends, plugs, couplers, junctions, tees, etc. with solvent jointing as per standard practice including cost and conveyance of all materials to site, labour charges, , overheads & contractors profit etc complete for finished item of work at all floor levels. (APSS No. 1302 1319 & 1326)

26.7

-

5480

... More
Construction of Integrated Market;RBR-FNDN-4 C (i): Providing R.C.C grade M 20 (Nominal Mix) concrete using 20 mm Graded Metal (MORD) for structures using 20 mm nominal size Graded hard stone aggregate, mechanically mixed, placed and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH For Drain Top Slab

24

-

132456

... More
Construction of Integrated Market;RBR-FNDN-4 C (i): Providing R.C.C grade M 20 (Nominal Mix) concrete using 20 mm Graded Metal (MORD) for structures using 20 mm nominal size Graded hard stone aggregate, mechanically mixed, placed and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH For Drain Walls

72

-

397369

... More
Construction of Integrated Market;RBR-FNDN-4 C (i): Providing R.C.C grade M 20 (Nominal Mix) concrete using 20 mm Graded Metal (MORD) for structures using 20 mm nominal size Graded hard stone aggregate, mechanically mixed, placed and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH For Base slab

24

-

125232

... More
Construction of Integrated Market;BLD-CSTN-3-2 (19) -Using Concrete mixture all works up to Plinth Level: Plain Cement concrete nominal mix M10 grade using 40mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed.

32

-

142979

... More
Construction of Integrated Market;BLD-CSTN-2-1 (9): Earth work excavation in Ordinary Soil by Manual Means-Upto 3 m depth for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, including backfilling etc. complete for finished item of work excluding dewatering charges etc as per SS - 20 B (APSS 308).

240

-

60794

... More
Construction of Integrated Market;Supply & application of one coat water based cement primer of exterior grade II and two coats of acrylic emulsion paint exterior grade with silicon additives having VOC (Volatile Organic Compound) content less than 30 grams/ liter for exterior walls of approved brand and shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 911 for External walls

1491.06

-

381294

... More
Construction of Integrated Market;Raised Pointing to RR / Coursed Rubble stone masonry in CM (1:3) prop: (Cement: Screened sand) including cost and conveyance of all materials like cement, screened sand, water, etc., from approved quarry, to site, including labour for mixing, of cement, mortar, construction, curing etc.,and overheads & contractors profit complete for finished item of work.

197.42

-

22409

... More
Construction of Integrated Market;Plastering 12mm thick in two coats using screened sand with base coat of 8mm thick in CM (1:5) and top coat of 4mm thick in CM (1:3) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, including all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer - in - charge etc., and overheads & contractors profit complete for finished item of work. (SS 901,903 & 904)

1491.06

-

712518

... More
Construction of Integrated Market;Providing and constructing Aerated (Cellular) Autoclaved Concrete Blocks conforming to IS:2185(Part-3) - 1984 and IS:6441-1972 of Compressive strength 3 N/mm2 in line and level of size 600 x 200 x 200 mm in masonry C.M. 1:6 including cost and conveyance of all materials like cement, screened sand,Aerated (Cellular) Autoclaved Concrete Blocks, water etc., to site, including labour charges, like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, etc.,and overheads & contractors profit etc. complete for finished item of work. (APSS No. 501 & 504).

151.36

-

1127462

... More
Construction of Integrated Market;Supplying fitting and placing HYSD / Thermo Mechanically Treated (TMT) (Fe 500/500D/550D) grade as per IS 1786-1979) using primary producers of bar reinforcements below 36mm dia.s for RCC works, including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including overheads & contractors profit complete for finished item of work.( APSS No.126)

19.36

-

1637229

... More
Construction of Integrated Market;Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes , jack props , wallers , Foot plates , brackets , steel centering plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)

39.23

-

525506

... More
Construction of Integrated Market;Plinth Beams::

30.27

-

386935

... More
Construction of Integrated Market;Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes , jack props , wallers , Foot plates , brackets , steel centering plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) Footings

74.42

-

746003

... More
Construction of Integrated Market;BLD-CSTN-6-5-(60) : Construction of CRS Masonary 1st Sort in Cement Mortor ( 1:6 ) Prop using hard granite stone including cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones, including labour charges for cutting Stones to required size and shape, mixing of Cement Mortor, Construction, Scaffolding Charges curing etc., complete for finished item of Work .

88.84

-

438669

... More
Construction of Integrated Market;BLD-CSTN-6-12-(67) : Construction of RR Masonary in Cement Mortor ( 1:6 ) Prop using hard granite stone including cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones, including labour charges for cutting Stones to required size and shape, mixing of Cement Mortor ,Construction, Scaffolding Charges curing etc., complete for finished item of Work .

171.1

-

681123

... More
Construction of Integrated Market;BLD-CSTN-3-2 (19) -Using Concrete mixture all works up to Plinth Level: Plain Cement concrete nominal mix M10 grade using 40mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed.

79.78

-

356465

... More
Construction of Integrated Market;BLD-CSTN-2-1 (9): Earth work excavation in Ordinary Soil by Manual Means-Upto 3 m depth for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, including backfilling etc. complete for finished item of work excluding dewatering charges etc as per SS - 20 B (APSS 308).

715.5

-

181243

... More
Construction of Integrated Market;DISMANTLING clearing away and carefully stacking materials (Kadapa slabs or Shahabad stone slabs flooring on sand bed) useful for reuse as per the directions of the Engineer in Charge.

276.78

-

2831.5

... More
Construction of Integrated Market;DISMANTLING clearing away and carefully stacking materials (Stone masonry in cement mortar) useful for reuse as per the directions of the Engineer in Charge.

564.09

-

326858.05

... More
Construction of Integrated Market;BLD-CSTN-14-11- (301) : Dismantling doors, windows and clear storey windows, ventilators etc.; (wood or steel) shutters including chowkhats, architraves, hold fasts and other attachments etc., complete and stacking them within 100 metre lead as per the directions of the Engineer in Charge

61

-

15290.87

... More
Construction of Integrated Market;RBR-STCL-6 (6) :Dismantling of existing structures comprising of brick masonry, including disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202 MORD / MORTH as per the directions of the Engineer in Charge

349.09

-

239280.94

... More
Construction of Integrated Market;Demolition including stacking of serviceable materials and disposal of unserviceable materials within 100m lead,as directed by the Engineer-in-Charge. Unreinforced cement concrete upto 15 cm thickness as per the directions of the Engineer in Charge

60.11

-

102057.34

... More
Construction of Integrated Market;Demolition including stacking of serviceable materials and disposal of unserviceable materials within 100 m lead, RCC Work as directed by the Engineer-in-Charge.

69.85

-

209988.07

... More
Construction of Integrated Market;25mm dia

4

-

5699

... More
Construction of Integrated Market;40mm dia

1

-

2922

... More
Construction of Integrated Market;TBSP-G.III-01:Supplying & Fixing Bronze Gate/Globe valve as per IS - 778 Class I , Indian Make, Heavy type of approved type including cost and conveyance of all materials & labour charges at all levels in all floors (Bronze) for 50mm dia

2

-

8571

... More
Construction of Integrated Market;25mm dia GI pipe

200

-

68396

... More
Construction of Integrated Market;40mm dia GI pipe

60

-

32176

... More
Construction of Integrated Market;TBSP-G.I-01:Supplying & fixing Nominal Bore GI pipe Medium Grade as per IS 1239 ISI mark in ground or on wall including cost of tees, elbows, bends, reducers, couplings, running joints, union flanges, unions etc. with necessary excavation in all types of soils except rock requiring blasting, refilling, chasing masonry walls and making good the walls & floors to the originals, surface and fixing MS clamps of TW block on walls, including cost and conveyance of all materials, pipe and GI fittings and labour charges complete for finished item of work. 50mm dia GI pipe from Bore well to Sheds

100

-

57489

... More
Construction of Integrated Market;Installation, Testing, Trail Run and Commissioning of Submersible Pumps set with all accessories as per the standard specifications.

1

-

2450

... More
Construction of Integrated Market;Supply and Delivery of 12" long GI NIPPLE including cost and conveyance, all labour charges etc., complete.

1

-

120

... More
Construction of Integrated Market;Supply and Delivery of 7/20 Service Wire of repute make as per IS Code including cost and conveyance, all labour charges etc., complete.

175

-

2975

... More
Construction of Integrated Market;Providing independent Earthing for the Pumpset/ motor using 40mm dia B class GI Pipe of 2m length duly providing 12mm dia 16nos holes and required bolts, nuts and washers, check nuts humbe pipe ring etc., as per IS specifications with necessary double GI wire no.8 SWG including filling with equal proportion of salt and Charcoal in layers and all labour charges etc., complete.

1

-

1700

... More
Construction of Integrated Market;Supply and Delivery of MS Angular Stand for fixing of control Panel Board - MS Angular stand consisting of L Angles of size 40mm x 40mm x 5mm with 2 nos. 6'long verticals and 3 nos. - 2 1/2' long horizontals. The two legs of the stand firmly fixed in Cement Concrete bed in CC (1:2:4) prop. of size 1m x 0.3m x 0.2m depth below Ground Level. including cost and conveyance, all labour charges etc., complete

1

-

1050

... More
Construction of Integrated Market;ELEC-5.13.6 e : Supply & fixing of 150mm Dia MS Galvanised Bore Cover including cost and conveyance,all labour charges ., complete

1

-

232

... More
Construction of Integrated Market;TBSP-G.III-18 : Supplying & fixing Bronze Vertical Check (Non return) Valve as per IS-778 I-class heavy duty - 40 mm NB Size including cost and conveyance, all labour charges etc., complete.

3

-

5024

... More
Construction of Integrated Market;Manufacture, Supply and fixing of Galvanised Mild steel couplings of the fallowing sizes including cost and conveyance of material and all labour charges etc,. Complete.

1

-

95

... More
Construction of Integrated Market;Supply and delivery of 50mm dia Bronze Gate/ Globe Valves leaded in tin bronze screwed internal bends, screwed on bonnet internal seat design to IS 778/ 84 with its ammendments class -1, Indian Make Heavy Type of sizes ISI Marked including cost and conveyance, all labour charges etc., complete.

1

-

4286

... More
Construction of Integrated Market;Supply and delivery of 50mm dia MS threaded Flanges set (2Nos) of 150mm dia OD 12mm thick of each Flange with 4 Nos 15mm dia bolts and nuts including Cost and Conveyance of all materials, all labour charges etc, complete

1

-

329

... More
Construction of Integrated Market;ELEC-5.13.6 : Supply and delivery of MS Clamp set 50mm dia, 450mm length,12mm thick plate, 75mm wide with 6Nos of 16mm dia Bolts & Nuts at site of work for pump installation including cost and conveyance of all materials, etc, complete.

1

-

433

... More
Construction of Integrated Market;Supply and delivery of Galvanised Mild steel bends heavy duty " C" class threaded at both ends at site of work for pump installation including cost and conveyance of all materials, and etc, complete.

2

-

360

... More
Construction of Integrated Market;Manufacture, supply, & delivery of Polyethylene pipes (PE-100 Grade) for water supply conforming to IS 4984-2016 including transportation to any where in T.G, but excluding GST and specials etc., complete. (Supply upto 90 mm dia in coil & above 90 mm dia stright length in6 M.)

200

-

20678

... More
Construction of Integrated Market;ELEC-1.6.3 : Supply abd delivery of PVC insulated and PV sheated flexible 3 core 2.50 sqmm flat type submersible cables suitable for submersible pumpsets conductors composed of ennealed high conductivity copper wire, conforming to IS 694 with its revisions and ammendments from time to time and delivery at site of installation of pumpset including freight and transit. Makes : Finolex / RR Kabel / Havells / KEI /L&T

210

-

26055

... More
Construction of Integrated Market;Supply and delivery of FRPP Flexible Conduit Pipe to encase the submersible cable Make: Precision or its equivalent

15

-

222

... More
Construction of Integrated Market;ELEC-5.10.2 : Supply and Transportation of control panel for three phase submersible motors up to 5 HP @ 415V 50Hz operating fitted with supply and fixing of Direct - on - Line LTLK /BCH/ SIEMENS / CROMPTON make, 0-500V Volt meter and 0-30A Ammeter, Indication lamps, selector switches, CTS, 32A TP MCB, Single phase preventor,suitable contactor to with stand low voltage pick up and high voltage resistant, with ISI marked capacitors assembled with ISI mark contactors and fitted with Legrand make ISI mark MCB etc., complete.

1

-

12427

... More
Construction of Integrated Market;Supply and delivery,of submersible pumpsets suitable to 150mm dia Borewell coupled with motors Single phase 2880 RPM 340V(-15%+10% range-290 to 375 Volts) / 3 Phase 2880 RPM 400V(-15%+10% range-340 to 440 Volts) of reputed make with minimum overall efficiency of 40% at the duty point with Radial / mixed flow with a trail run of One week.The pumpset should confirm to IS 8034/2002 & 9283/1995 with up to date amendments with ISI mark and a guarantee period of 18 months from the date of installation. The rates are inclusive of , transportation, installation, errection of pumpsets including accessories etc, complete. Makes:Texmo / CRI / KSB / Aryan Varsha / Lubi 3.00 HP 5-10 Stage Rate as per SoR item ELEC-5.6.1 .a

1

-

31367

... More
Construction of Integrated Market;Supplying and fixing of 160mm dia PVC Casing pipe of 6kg/cm2 including cost and conveyance, all labour charges

16

-

8998

... More
Construction of Integrated Market;above 90.00m depth

110

-

59689

... More
Construction of Integrated Market;Drilling of Bore well by down the hole hammer drilling to a finished dia of 112/165 mm dia in all formations suitable for down the hole hammer drilling such as medium hard rock formation to hard rock formation, all consolidated formation etc. and drilling in over burden to dia not less than 200 mm etc and reaming the bore well to suit insertion of suitable casing pipe etc., including insertion of casing pipe with couplings, caps any other relevant materials upto required depth as directed by the department including transportation of drilling rigs and supporting vehicle and including bore development (Flushing of Bore Well at an average pressure of 150 PSI) conducting yield test, consumables charges, Crew charges required in fixation of pipe assembly completely done to the satisfaction of the department and including all labour charges and but excluding the cost of casing pipe, couplings, cap etc., The entire work should be carried out as per IS -2800 Part I & II 1979 and amended from time to time. Depth of the Borewells

90

-

45646

... More
Construction of Integrated Market;Supply and Fixing of 1200 mm (48") sweep 230V, A.C 50 Hz.Ceiling fan with 3 Blades and double ball bearings with all standard accessories and Mini Modular Stepped type Electronic Regulator with Cover Frame including providing fan hook of 12/15mm dia M.S. rod / bar grouted in RCC slab with making the slab as original and 19/20mm steel tube down rod of one meter length with bolts & nuts duly painted with matching colour of fan etc,. complete Makes : Atomberg (Efficio ) / Havells / Orient

265

-

1101295

... More
Construction of Integrated Market;Supply of fresh air exhaust fan of Heavy duty 250V A.C.50Hz.. 300mm size (12") 900 R.P.M etc., complete. Makes : Crompton / Almounard / Havells Turbo Force SP.

8

-

28367

... More
Construction of Integrated Market;Supply and Transportation of 18/20W CFL Bulk head fitting with cast aluminium enamel painted body with water tight, clear glass with wire guard hinged with lock and key arrangements etc., with Lamp complete. Makes : Bajaj / Crompton / Surya

32

-

15706

... More
Construction of Integrated Market;Supply and transportation of 1X28W surface pendant mounting T- 5 extruded Aluminium with Aluminium reflector luminaire with all standard accessories and connections etc., complete with 1 No. 28 W tube

46

-

6533

... More
Construction of Integrated Market;Supply and transportation of 20W +/- 10%, >/ 2000 lumens, 1200mm length LED retro tube light, housing made with aluminum anodised body, wide operating voltage with double side connection, PF=0.9, Surge protection: > 2KV, THD<15%, with inbuilt driver and frosted cover CCT: 3000K - 6500K as desired by the department and as per IS specifications, minimum CRI=80,.etc complete with 5 years warranty with BIS Certification. LUMINAIRE MAKE: Phillips / OSRAM / Wipro / Crompton / Bajaj / Havells / Jaquar / IB LED / Panasonic / Halonix / HPL / Syska / Eveready / Surya / Keselec/ FIEM / Arraystorm / GM / Goldmedal LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA / OSRAM / SAMSUNG / LG LEDs.

800

-

629880

... More
Construction of Integrated Market;Supply and Run of 2 of 10 Sq.mm WPSC Aluminium cable along with No.10 SWG G.I bearer wire through PVC cleats with all accessories including labour charges etc., complete for service mains.

1200

-

89784

... More
Construction of Integrated Market;Providing independent earthing for Important equipment with 40mm dia 'B' class 2.5m long G.I pipe and 19mm dia 'B' class G.I pipe of 0.3mtr. long connected with reducer providing G.I funnel with mesh enclosed in C.C/ brick massonry chamber of 450m x 450m x 400mm with R.C.C. Slab cover duly providing staggered holes filling with 20Kg Salt and 40Kg Charcoal or 40Kg bentonite powder from the bottom of the pipe giving earth connection from electrode through G.I strip of 40 x 6mm x 200mm length with all accessories and labour charges complete, as per IS specifications 732/1982 (Part II)

5

-

27626

... More
Construction of Integrated Market;Supply and fixing SPN Distribution board with IP-43 protection (Metal Door) suitable inclduing 40A D.P.Isolator for single phase ELCB / RCCB/DP Isolator as incomer and 10kA SP MCBs as outing going including internal connection and labour charges for surface / flush mounting etc., complete.

6

-

28139

... More
Construction of Integrated Market;ELEC data -4-1-1: Supply and erection of Panel mounting cubical type 30 / 32A TPN 415V, 50 Hz. switch disconnector fuse unit complete with front drive mechanism with door inter lock, padlocking arrangement etc., complete with fuse links on existing control panel. ( Fuse unit makes : L&T / SCHNEIDER / C&S / ABB / SIEMENS- Fuse Links : Makes : L & T / C & S / Standard / HPL / Havells / Siemens / Indo Asian.

11

-

22407

... More
Construction of Integrated Market;Supply and run of 2 of 56/0.3mm (4 Sq.mm) FRLS / HFFR PVC insulated 1100V grade as per IS:694/1990 specification for Copper cable in existing pipe for Mains including all labour charges etc., complete.. Makes : Finolex / RR kabel / Havells / APAR EBXL / KEI (HFFR) / Polycab ((HR_FR-LF) / L&T / V-Guard (HFFR).

1500

-

215115

... More
Construction of Integrated Market;BLD-ELEC-3.1.4 ; Supply and run of 2 of 36/0.3mm (2.5 Sq.mm) FRLS / HFFR PVC insulated 1100V grade as per IS:694/1990 specification for Copper cable in existing pipe for Mains including all labour charges etc., complete.. Makes : Finolex / RR kabel / Havells / APAR EBXL / KEI (HFFR) / Polycab ((HR_FR-LF) / L&T / V-Guard (HFFR).

1750

-

165253

... More
Construction of Integrated Market;Supply and run of 2 of 22/0.3mm (1.5 Sq.mm) F.R P.V.C. insulated flexible copper cable in existing pipe for mains inlcuding all labour charges etc., complete.

2100

-

142842

... More
Construction of Integrated Market;Supply and run of 1 of 14 /0.3mm (1.0 Sq.mm) FRLS / HFFR PVC insulated 1100V grade as per IS:694/1990 specification for Copper cable in existing pipe for Earth Continuity including all labour charges etc., complete.. Makes : Finolex / RR kabel / Havells / APAR EBXL / KEI (HFFR) / Polycab ((HR_FR-LF) / L&T / V-Guard (HFFR).

1500

-

37815

... More
Construction of Integrated Market;Supply and fixing of CFL holder in lieu of ceiling rose of light point complete with all connections and all labour charges etc. Makes : GM G Home / Gold Medal Olive / Million Zoom / Anchor Penta Cherry / Great white Omega / HPL / Vimal / CPL.

20

-

2054

... More
Construction of Integrated Market;Supply and fixing of 16A 3pin plug socket with indicator lamp and 16Amps fuse unit and 16 Amps switch control (5 in one) on decolam sheet covered board including earth connection and all labour charges etc., complete on wall.

68

-

18214

... More
Construction of Integrated Market;Supply and fixing of 6A 3 pin wall plug socket with 6A switch control on a common switch board with earth continuity including wire leads, earth connections along with all labour charges etc., complete.

26

-

4046

... More
Construction of Integrated Market;Wiring with 2 runs of 22/0.3mm (1.5 Sq.mm) Fire Retardant (FR) P.V.C. insulated flexible copper cable (ISI MARK) in existing pipe with 6A switch, Ceiling rose and 3mm thick hylam sheet covering to switch control box including all labour charges etc., complete for light, bell, fan and exhaust fan points in Non-Residential Buildings

906

-

639545

... More
Construction of Integrated Market;Supply and Fixing of 25mm dia 1.5mm thick surface P.V.C. pipe (ISI MARK) with all accessories fixing on chromium plated metallic base saddles including all labour charges etc., complete for run of mains.

500

-

50730

... More
Construction of Integrated Market;Supply and Fixing of 25mm dia 2mm thick PVC pipe (ISI MARK) concealed in Roof Slabs with all required accessories including masonary work and labour charges etc., complete.

1000

-

91100

... More
Construction of Integrated Market;Constructing 457.2 mm x 457.2 mm (1'6"x1'6") brick in CM 1:6 prop. Masonry. Inspection chamber up to 914.4 mm (3'0") and fitted with light weight 457.2 mm x 457.2 mm (1'6"x1'6") C.I frame and cover of 20 Kg.

15

-

72822

... More
Construction of Integrated Market;Constructing 904.0 mm (3?0?) dia solid block masonry inspection chamber as per IS - 4111: Part-1:1986 with cement mortar (1:6) prop using fly-ash blocks of 225 mm thick from approved source having a minimum crushing strength of 10 N/sq.mm including plastering withcementmortar1:3prop;½?thickbothinsideand outside fitted with 20? dia RCC manhole covers and frames including excavating pits up to a depth of 904 mm (3'-0") in all sorts of soils (excluding rock) and laying cement concrete (1:4:8) 150 mm thick using 40 mm HBG Metal and P.C.C. 1:2:4 benching and channel 100 mm thick as per Standard specification and including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, cost of seigniorage charges on all materials and all incidental and operational, labour charges like mixing cement mortar, constructing masonry, lift charges, curing etc., complete for finished item of work as per Standard specification.

15

-

133373

... More
Construction of Integrated Market;Providing & Placing on Terrace (at all floor levels) polyethylene water storage tank with Double layer approved brand & manufacture with cover and suitable locking arrangement & making necessary holes for inlet & outlets and over flow pipes but without fittings & base support for tanks

15000

-

136350

... More
Construction of Integrated Market;Construction of Brick masonry support for CPVC pipe of size 304.80mm x 228.60mm x 228.60 mm with Brick in CM (1:6) prop including plastering and finishing with 12mm thick in CM (1:5) including cost and conveyance of all materials and all labour charges, overheads & contractors profit etc.,complete for finished item of work for all floors.

25

-

2443

... More
Construction of Integrated Market;b)110mmdia

180

-

53921

... More
Construction of Integrated Market;Supplying and fixing of SWR PVC pipes Prince/Sudhakar/ Kisan/ Supreme or any approved brand) 4 Kg/Sq.cm. including Labour charges for laying, fixing and commissioning the PVC pipes including couplers/ bends/ tees, PVC clamps if necessary with required number of Bombay nails etc. any diameter including fixing necessary fittings like bends, plugs, couplers, junctions, tees, etc. with solvent jointing as per standard practice including cost and conveyance of all materials to site, labour charges, , overheads & contractors profit etc complete for finished item of work at all floor levels. (APSS No. 1302 1319 & 1326)75 mm dia

200

-

41052

... More
Construction of Integrated Market;d) 40mm Dia

10

-

5976

... More
Construction of Integrated Market;c) 32mm Dia

10

-

2920

... More
Construction of Integrated Market;b) 25mm Dia

10

-

2795

... More
Construction of Integrated Market;Supply and fixing of PPR Ball Valve conforming to DIN Standards 8077/8092 including cost and conveyance of all materials, labour charges, overheads & contractors profit etc., complete for finished item of work. a) 15mm Dia

20

-

4226

... More
Construction of Integrated Market;S&F of 15 mm CP finish brass stop valve of not less than 400 grams weight quarter turn spindle with internal threaded conforming to IS 8931

9

-

8150

... More
Construction of Integrated Market;e) 41.30mm OD pipe

130

-

54206

... More
Construction of Integrated Market;d) 34.90mm OD pipe

110

-

36868

... More
Construction of Integrated Market;c) 28.60mm OD pipe

120

-

29585

... More
Construction of Integrated Market;b) 22.20mm OD pipe

150

-

27950

... More
Construction of Integrated Market;Supply and fixing of Ashirvad/ Ajay/ Astral Flowguard or equivalent CPVC Pipes and Fittings SDR 13.5 to meet the requirement of ASTM-D 2846 and are produced in CTS (Copper Tube Sizes 1/2" to 2") for hot and cold water (IS 15778:2007) including cost and conveyance of all materials to site, labour charges for fixing, overheads & contractors profit etc, complete for finished item of work at all floor levels. a) 15.90mm OD pipe

200

-

32494

... More
Construction of Integrated Market;Polished Marble slabs of Dongari/ Adanga/Marodh/ Rajgangpur etc., variety of thickness between 16 mm to 20 mm of sizes from 600 mmto 900 mm including full rounding the edges, fixing in position, polishing, including cost and conveyance of all materials and labour charges, overheads & contractors profit etc., complete for finished item of work for all floors.

8

-

16521

... More
Construction of Integrated Market;TBSP-E.VII-03:Supplying & Fixing white glazed flat back half Shop urinals of size 590 x 375 x 390 mm with internal flushing rim fixed with screws complete,1st quality ISI marked variety, as approved by Engineer-in-charge, 15 mm PVC connections with brass plumber union nuts, S&F of 15 mm brass body CP finish self closing tap push type conforming to IS 1711 1st quality of approved make including 40 mm dia. PVC solid waste pipe including cost 76.2 x 101.6 mm teak wood block and conveyance of all materials to site, labour charges etc., complete for finished item of work for all floors.

9

-

42957

... More
Construction of Integrated Market;Supplying and fixing TV shape mirror with plastic frame of size 609.6mm x 457.2mm, plywood back with NP screws 1st quality including cost and conveyance of all materials, labour charges, overheads & contractors profit complete for finished item of work in all floors.

8

-

4745

... More
Construction of Integrated Market;S&F CP finish brass soap dish of approved make ISI quality with CP screws etc., complete including cost and conveyance of all materials, labour charges for fixing, etc overheads & contractors profit, complete for finished item of work in all floors

8

-

5244

... More
Construction of Integrated Market;S&F of 15 mm brass body CP finish bib tap of not less than 300 grams weight with quarter turn spindle with either internal or external threaded connection conforming to IS 8931

36

-

24909

... More
Construction of Integrated Market;TBSP-E.VI-05: Supplying & Fixing 550 x 400 mm Indian make Flat Back Wash Hand Basin (HSW/Parryware/ Neycer) 1st quality conforming to IS:2556-Part-4:1972 with waste fittings like rubber plug, chain, 32 mm nominal size C.P. Fitting with parallel pipe thread conforming to IS:2963-1979 and fitted with 15 mm nominal bore Chromium Plated Pillar Tap of 1st quality Indian make 400 grams Seiko/ Senior/ Nice/ Esso or equivalent complete with standard CI brackets including wooden block: - Single C.P. Pillar cock including S & F 15 mm nominal size CP finish brass angled stop valve screw type with internal /external threaded conforming to IS 8931 and S&F PVC bottle trap with wall connection pipe

9

-

25799

... More
Construction of Integrated Market;TBSP-E.I-01:Providing and fixing 23" (584.2mm) long white glazed Indian WC Orissa pan of parry/Neycer/HSW make with P or S trap with brick masonry seat, CC squatting plate and 10 lit capacity PVC slimline low level flush tank of approved make with internal components and fixed with wooden gutties as approved by Engineer-in-charge with required size nails, 15mm PVC connections 31.75 mm brass plumber union nuts, 32mm dia long CP bend and 12.70 mm (1/2")NP stop cock, heavy duty (300 grams), P trap or S trap of Indian W.C. shall be encased on CC (1:2:4) 6? alround well above the joint to stop leakage at the joint etc., complete including cost and conveyance of all materials to site, cost of CC bed, labour charges etc., complete for finished item of work.

16

-

99745

... More
Construction of Integrated Market;Supplying and fixing of 4" (101.6mm) multi floor trap with jali - UPVC/SWR pipe fittings as per site requirements with standard practice for all floors including cost and conveyance of all materials to site, labour charges, , overheads & contractors profit etc., complete for finished item of work.

20

-

3590

... More
Construction of Integrated Market;Supplying fitting and placing HYSD / Thermo Mechanically Treated (TMT) (Fe 500/500D/550D) grade as per IS 1786-1979) using primary producers of bar reinforcements below 36mm dia.s for RCC works, including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including overheads & contractors profit complete for finished item of work.( APSS No.126)

3.75

-

317128.57

... More
Construction of Integrated Market;175mm thick Roof Slab

5.49

-

56774.01

... More
Construction of Integrated Market;300 mm thick side walls

13.67

-

186782.23

... More
Construction of Integrated Market;Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes , jack props , wallers , Foot plates , brackets , steel centering plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) wall corners

14.94

-

99075

... More
Construction of Integrated Market;BLD-CSTN-3-2 (19) -Using Concrete mixture all works up to Plinth Level: Plain Cement concrete nominal mix M10 grade using 40mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed.

6.34

-

28328

... More
Construction of Integrated Market;BLD-CSTN-2-1 (9): Earth work excavation in Ordinary Soil by Manual Means-Upto 3 m depth for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, including backfilling etc. complete for finished item of work excluding dewatering charges etc as per SS - 20 B (APSS 308).

105.63

-

26757

... More
Construction of Integrated Market;Providing and Laying of Interlocking precast concrete blocks for paving of M-30 grade and thickness not less than 50 mm for Non-traffic areas conforming to IS 15658:2006 and IRC : SP63:2004 in all shapes and designs as per the manufacturer's specification as per drawing and Technical Specification Clause 1504 MORD

2156.6

-

1123114.15

... More
Construction of Integrated Market;Construction of cement concrete kerb with top and bottom width 115 and 165 mm respectively, 250 mm high in M 20 grade PCC on M-10 grade foundation 150 mm thick, foundation having 50 mm projection beyond kerb stone, kerb stone laid with kerb laying machine, foundation concrete laid manually, all complete as per clause 408 MORTH

1133.18

-

345416

... More
Construction of Integrated Market;TBSC-T.I-15 : Saw cut joints for freshly laid concrete pavement including all material and labour charges

2499

-

204418

... More
Construction of Integrated Market;Vaccum drying of freshly laid cement concrete floor using 100% air tight suction mat of suitable size and length, vaccum pump to maintain vaccum pressure 0.7-0.8 atmospheres as per the standard procedure floating with power floater, mechanical trawelling, finishing with sound edges and corners, including hire and operational charges of machinery, labour, fuel etc., complete for finished item of work as directed by Engineer-in-charge of the work.

2644

-

198300

... More
Construction of Integrated Market;RBR-CCPV-5: Construction of un-reinforced, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved mix design, laid in approved fixed side form work (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD.

240.12

-

1497323

... More
Construction of Integrated Market;RBR-CCPV-4 : Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing etc. complete as per Technical Specification 601 MORTH.

160.08

-

482340

... More
Construction of Integrated Market;RBR-SBBS-10 (II-i) Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN / Vibratory Roller 80-100 kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406 MORD / MORTH.

320.16

-

609264

... More
Construction of Integrated Market;RBR-SBBS-1 Construction of granular sub-base by providing well graded material / Close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller 80-100 kN / Vibratory Roller to achieve the desired density, complete as per Technical Specification Clause 401 MORD / MORTH.

240.12

-

386615

... More
Construction of Integrated Market;RBR-EECD-8(c): Earthwork excavation for road way in soil by mechanical means including cutting and pushing the earth to side of embankment upto a lead of 100 metres including trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections etc., complete for finished item of work for trench cutting as per MOR&H specification No.301 and as directed by the Engineer-in-Charge- (Hydraulic Excavator)

720.36

-

51232

... More
Construction of Integrated Market;Supplying, fabricating, fixing, Labour charges for fabricating steel works like Window Grills, Compound Wall Grills, Gates, Iron Doors, Windows including cost of welding rods, power charges, excluding cost of fixing in position including cost and conveyance of all materials, labour charges for fabrication & erection at site work for all heights etc., as per the drawings supplied from time to time at every level by the Engineer-in-Charge for finished item of work

1608.72

-

164492

... More
Construction of Integrated Market;Supply & application of one coat water based cement primer of exterior grade II and two coats of acrylic emulsion paint exterior grade with silicon additives having VOC (Volatile Organic Compound) content less than 30 grams/ liter for exterior walls of approved brand and shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 911 for External walls

201.97

-

51648

... More
Construction of Integrated Market;Providing and applying Exterior grade Texture ready mixed paint with sand texture added sand particles Acrylic copolymers and mineral compounds, bactericides and various additives having VOC (Volatile Organic Compound) content less than 30 grams/ Lit. of average 2 to 3 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying putty/ texture paint filler by putty knife / muslin pad, air dry for 2 - 3 hrs for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges, over heads and contractors profit etc., complete for finished item of work for external walls

201.97

-

85064

... More
Construction of Integrated Market;Plastering 12mm thick in two coats using screened sand with base coat of 8mm thick in CM (1:5) and top coat of 4mm thick in CM (1:3) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, including all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer - in - charge etc., and overheads & contractors profit complete for finished item of work. (SS 901,903 & 904)

201.97

-

96513

... More
Construction of Integrated Market;Providing and constructing Aerated (Cellular) Autoclaved Concrete Blocks conforming to IS:2185(Part-3) - 1984 and IS:6441-1972 of Compressive strength 3 N/mm2 in line and level of size 600 x 200 x 200 mm in masonry C.M. 1:6 including cost and conveyance of all materials like cement, screened sand,Aerated (Cellular) Autoclaved Concrete Blocks, water etc., to site, including labour charges, like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, etc.,and overheads & contractors profit etc. complete for finished item of work. (APSS No. 501 & 504).

6.59

-

49088

... More
Construction of Integrated Market;Supplying fitting and placing HYSD / Thermo Mechanically Treated (TMT) (Fe 500/500D/550D) grade as per IS 1786-1979) using primary producers of bar reinforcements below 36mm dia.s for RCC works, including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including overheads & contractors profit complete for finished item of work.( APSS No.126)

4.52

-

382245.64

... More
Construction of Integrated Market;For Unsupported ht of 8.50mt

5.63

-

103526.02

... More
Construction of Integrated Market;Roof Slabs of 125mm thick For Unsupported ht of 7.50mt

1.24

-

20695.02

... More
Construction of Integrated Market;Cross beams of Security room

3

-

58883.46

... More
Construction of Integrated Market;For Unsupported ht of 7.50mt for 1v11

3.55

-

66383.86

... More
Construction of Integrated Market;Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes , jack props , wallers , Foot plates , brackets , steel centering plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)

1

-

13130.79

... More
Construction of Integrated Market;For Inclined Column

1.38

-

18485.82

... More
Construction of Integrated Market;Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes , jack props , wallers , Foot plates , brackets , steel centering plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) For Gate columns upto 3.66mt

4.07

-

54519.77

... More
Construction of Integrated Market;For Plinth Beams

1.41

-

18023.75

... More
Construction of Integrated Market;Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes , jack props , wallers , Foot plates , brackets , steel centering plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) for footings

11.36

-

113875.25

... More
Construction of Integrated Market;BLD-CSTN-3-2 (19) -Using Concrete mixture all works up to Plinth Level: Plain Cement concrete nominal mix M10 grade using 40mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed.

5.4

-

24127.74

... More
Construction of Integrated Market;BLD-CSTN-2-2 (10): Earth work excavation in Ordinary Soil by Mechanical Means-Upto 3 m depth for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring, sheeting, planking, strutting, including backfilling etc. complete for finished item of work excluding dewatering charges etc as per SS - 20 B (APSS 308).

64.8

-

7694

... More
Construction of Integrated Market;Supplying and fixing of MS Grating over drain using 35mm x 35mm 6mm MS angle alround and 10mm MS square bars, horizontally at 75mm centre to centre and vertically at 125mm centre to centre- 2 Nos each including fixing with 4 Nos of MS Z holdfasts (2 on each side) duly making cutting masonry, fixing and making to original surface neatly and painting grill with one coat of red oxide primer, two coats of synthetic enamel paint including cost and conveyance of all materials including cutting, bending, welding including all operational charges and all labour charges etc., complete for finished item of work.

8400

-

869652

... More
Construction of Integrated Market;Providing impervious coat to exposed RCC roof slab surfaces to required slopes with CM (1:3) prop. using screened sand 20mm thick (average) mixed with water proofing compound as approved by Engineer-in-charge at 1 Kg per one bag of cement, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm including cost and conveyance of all materials like cement, sand, water proofing compound, water etc., to site, including operational, incidental, and labour charges for mixing mortar, laying, lift charges, rendering smooth and thread lining, curing including rounding off junctions of wall and slab etc., and overheads & contractors profit complete for finished item of work. (APSS No. 901 & 903).

5501.32

-

2958775

... More
Construction of Integrated Market;Painting two coats with ready mixed Synthetic Enamel / Epoxy enamel (IS - 14209) paints in all shades Grade - II having VOC (Volatile Organic Compound) content less than 30 grams/ Lit. to new iron work including cost and conveyance of all materials to site, incidental, operational and all labour charges etc., and overheads & contractors profit complete for finished item of work (SS No. 1201, 1212 & 1207).

361.4

-

40018

... More
Construction of Integrated Market;Supply & application of one coat water based cement primer of exterior grade II and two coats of acrylic emulsion paint exterior grade with silicon additives having VOC (Volatile Organic Compound) content less than 30 grams/ liter for exterior walls of approved brand and shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 911 for External walls

2103.85

-

537997

... More
Construction of Integrated Market;Supply & application of one coat water based cement primer of interior grade I and two coats of acrylic emulsion paint Interior Grade having VOC (Volatile Organic Compound) content less than 30 grams/litre for internal walls of approved brand and shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 911 for Internal walls

17801.06

-

3283406

... More
Construction of Integrated Market;Providing and applying Exterior grade Texture ready mixed paint with sand texture added sand particles Acrylic copolymers and mineral compounds, bactericides and various additives having VOC (Volatile Organic Compound) content less than 30 grams/ Lit. of average 2 to 3 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying putty/ texture paint filler by putty knife / muslin pad, air dry for 2 - 3 hrs for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges, over heads and contractors profit etc., complete for finished item of work for external walls

798.19

-

336174

... More
Construction of Integrated Market;Providing and applying Wall putty of White Cement or Polymer or Cement based of average 1 to 2 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying knifing paste filler by putty knife / muslin pad, air dry for 2 - 3 hrs, sand with 180 and 320 No., emery paper for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges, over heads and contractors profit etc., complete for finished item of work in all floors for Internal walls

762.55

-

176019

... More
Construction of Integrated Market;Supply and fixing of pre-painted steel top hung and fixed louvered ventilators made of pre - painted steel as per IS 513 of -0.58 mm thick 'D quality, galvanized as per IS 277, finish painted with a polyester paint & 4 mm pinhead glass for ventilators with EPDM Gasket with handle made of high grade aluminium powder coated and nylon receiver, corner brackets made of CRCA with Zinc Phosphate, Mullion caps made of glass filled nylon, frames fixed to the concrete /masonry wall by means of self-expanding screws including 10 mm square guard bars with 6 pitch complete for finished item of work for (i) Ventilators: Fixed louvers 2'-0 x 2'-0 (609.6x609.6mm)(Box section) outer frame section size of 33 x 56 mm and (ii) Ventilators: Fixed louvers 4'-0 x 2'-0 (1219.2 x 609.6 mm) (Box section) outer frame section size of 33 x 56 mm Mullion section size of 33 x 56 mm and (iii) Ventilators: Fixed louvers 4'-0 x 3'-0 (1219.2 x 914.4 mm) (Box section) outer frame section size of 33 x 56 mm Mullion section size of 33 x 56 mm

6.89

-

39563

... More
Construction of Integrated Market;Providing and fixing of Two shutter Sliding Windows made of Galvanized Steel as per IS 513, D quality, galvanized as per IS 277 with powder coated with Pure polyester powder up to 50-60 microns thick with total coated thickness of 0.8 mm for Outer Frame and 0.58 mm thickness for Sliding Shutter Section, the Outer Frame for Two Tracks with Grill provision size of 90 mm x 50 mm and the Window Shutter section of 58 mm x 36 mm and the outer Frame with two integrated guide tracks of 12mm width and 24mm deep for provision to slide the Shutter / sash frame and facilitates with a water drain outlet component made of PVC and the shutter frame fitted with 5mm thick plain float glass of reputed make and fixed with EPDM weathering seal resistant accessories and handle made of Aluminium 1 No. per each shutter including installation of window system at site using anchor fasteners, Silicon sealant applied at the Outer frame corners inclusive of conveyance of all materials accessories, labour charges, and erection at site with complete finished item of work for Window with Two Sliding Shutters and with Grill

12.96

-

92367

... More
Construction of Integrated Market;Doors Frames (Colour Coated Steel Sections) & Shutter using Cement Bonded Particle Board as per IS 14276 (Cement Bonded Particle Board conforming to IS 14276 or equivalent ) : Providing and fixing of door frame made from cold roll formed sections made of galvanized (Base steel as per IS277 with zinc of 120 Gms/sqm) colour coated steel sections with total coated thickness of 1mm, primer coated with epoxy primer coat of 5-7 microns thick, finish paint with polyester paint of 12-16 microns. The Section for door frame is to be filled with polyurethane (P.U) form of 40kg/m3. Overall size of frame section should be of 50mm x 50mm. With necessary corner brackets, stiffeners, hinges, and screws. Cement Bonded particle board shutter (Cement Bonded Particle Board conforming to IS 14276 or equivalent ) ?Single Leaf? with all round styles ?U? section of size 12m x 18m x 12mm made from 0.6 mm thick galvanized, colour coated cold rolled steel profiles with 16mm thick Cement Bonded particle Board (Cement Bonded Particle Board conforming to IS 14276 or equivalent ) with necessary screws fixed at every 1?-0? (304.8mm) intervals. The cost inclusive of MS nickel coated Aldrops of size 250mm long 2nos. 200mm long tower bolt 1no., 125mm handles 2nos., cost and conveyance of all materials at site and applying one coat primer , one coat of luppam and two coats of synthetic enamel paint as per approved design for finished item of work

38.43

-

162773

... More
Construction of Integrated Market;Supply & fixing of Rolling shutter made of 80 x 1.25 mm machine rolled CRCA laths, interlocked together through their entire length and jointed together at the ends by end-locks, mounted on specially designed pipe shaft of 50mm Diameter nominal bore MS B class pipe with brackets, plates, guide channels, stoppers, bottom locking plates and arrangements for inside & outside locking with push-pull operations including cost of hood cover and springs complete, painted with one coat of approved steel primer, locks, ball bearings, all accessories etc complete for finished item of work as per special Spec: 1108

180.7

-

854263

... More
Construction of Integrated Market;BLD-CSTN-9-18-(116) see Ref:9-23-(121-b): Dadooing/ Cladding to walls with glazed red or white full body ceramic wall tiles of size 200 x 300 / 245 x 325 mm and thickness between 6 mm 1st quality conforming to IS:13711, IS:13712, IS: 13630 (Parts 1 to 15) of any colour and finish in all shades and designs set over a base coat of CM(1:3) Prop. 12mm thick and neat Gray cement slurry of Honey like consistancy sread at the rate of 3.30 Kg of cement per One Square Meter and jointed wiyh neat White cement paste mixed with pigmant of matching shade including cost and conveyance of all materials like cement, sand, water, flooring Tiles etc. to site, all operational, incidental and labour charges such as mixing of cement mortar, laying, jointing, curing, lift charges etc., complete for finished item of work.

289.99

-

169374

... More
Construction of Integrated Market;Flooring with Non-skid red or white full body Ceramic floor tiles of size 300 x 300 mm and thickness between 7-8 mm 1st quality conforming to IS:15622 - 2017, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs as approved by Engineer-in-charge, set over base coat of cement mortar (1:8), 12mm thick using screened sand over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3 Kgs per Sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, screened sand , water and tiles etc., and overheads & contractors profit complete for finished item of work.( In toilets) (APSS No.701 & 707)

81.54

-

73353

... More
Construction of Integrated Market;Providing flooring (Treads) of steps with 8 mm thick mirror polished granite tiles length equal to flooring stones, set over base coat of CM (1:6) 12 mm thick over cc bed already laid with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., complete etc., complete for finished item of work

138.94

-

256517

... More
Construction of Integrated Market;Providing skirting (Risers) of steps with 8 mm thick mirror polished granite tiles length equal to flooring stones, set over base coat of CM (1:3) 12 mm thick over cc bed already laid with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., complete etc., complete for finished item of work

47.74

-

94185

... More
Construction of Integrated Market;Flooring with 16 to 18 mm thick High Polished Granite stone slabs black colour as approved by the Engineer-in-Charge of length not less than 2.43 mts set over base coat of cement mortar (1:8) , 20mm thick using screened sand over CC bed already laid or RCC roof slab including neat grey cement slurry of honey like consistency spread @ 3.3 Kg per sqm and jointed neatly with white cement paste mixed with pigment of matching shade to full depth including cost and conveyance of all materials like cement , sand , water , granite slabs etc., to work site and all operational, incidental labour & lift charges, half rounding the edge , polishing charges, cost of base coat and overheads & contractors profit complete for finished item of work for platforms (S.S.701 & special) over Platform

2130.83

-

8175121

... More
Construction of Integrated Market;Flooring with soluble salt/ stain free porcelain vitrified tiles screen printed and polished of size 600 x 600 mm and thickness between 8- 10 mm 1st quality conforming to IS:15622 - 2017, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs with borders and design as per the approved flooring pattern as directed by the Engineer-In -Charge, laying tiles using spacers of 2mm thick, set over a base coat of CM (1:8) prop. 12mm thick using screened sand over CC bed already laid or RCC roof slab , including neat cement slurry of honey like consistancy spread @ 3.3 kgs per Sqm. and jointed neately with white cement paste to full depth mixed with pigment of matching shade including cost and conveyance of all materials like cement, sand, water, tiles, white cement etc., to site including cost of base coat and all labour charges for mixing of cement mortar, laying tiles to required slope as directed by the Engineer- in-charge etc.,and overheads & contractors profit complete for finished item of work. (APSS No.701 & 707)

82.64

-

89205

... More
Construction of Integrated Market;BLD-CSTN-9-18-(116) see Ref:9-23-(121-b): Dadooing/ Cladding to walls with glazed red or white full body ceramic wall tiles of size 200 x 300 / 245 x 325 mm and thickness between 6 mm 1st quality conforming to IS:13711, IS:13712, IS: 13630 (Parts 1 to 15) of any colour and finish in all shades and designs set over a base coat of CM(1:3) Prop. 12mm thick and neat Gray cement slurry of Honey like consistancy sread at the rate of 3.30 Kg of cement per One Square Meter and jointed wiyh neat White cement paste mixed with pigmant of matching shade including cost and conveyance of all materials like cement, sand, water, flooring Tiles etc. to site, all operational, incidental and labour charges such as mixing of cement mortar, laying, jointing, curing, lift charges etc., complete for finished item of work.

516.89

-

301900

... More
Construction of Integrated Market;Flooring with Polished Shahabad/ Tandur Stone Slabs of sizes between 15mm to 18 mm thickness set over a base coat of CM (1:8) , 12mm thick using screened sand over already laid CC bed / RCC roof slab including neat cement slurry of honey like consistency spread @ 3.3 Kgs per Sqm and jointed with neat cement to full depth including cost and conveyance of all materials like cement, sand, water, flooring stones etc. complete including all labour charges like dressing of flooring stones to the required size, mixing of cement mortar, laying, lift charges , cost of base coat, water charges etc., and overheads & contractors profit complete for finished item of work. (APSS No.703 & 701)

4952.07

-

3259254

... More
Construction of Integrated Market;Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes , jack props , wallers , Foot plates , brackets , steel centering plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) For 50mm thick stall platforms

83.29

-

1077714.3

... More
Construction of Integrated Market;Plastering 12mm thick in two coats using screened sand with base coat of 8mm thick in CM (1:5) and top coat of 4mm thick in CM (1:3) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, including all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer - in - charge etc., and overheads & contractors profit complete for finished item of work. (SS 901,903 & 904)

12696.75

-

6067269

... More
Construction of Integrated Market;BLD-CSTN-8-1-(76) : Ornamental Plastering with 12mm thick in single coat in CM (1:3) finished smooth including cost and conveyance of all materials to site, finishing, curing, scaffolding and all operational, incidental, labour charges etc., including cutting grooves where ever necessary etc., complete for finished item of work. (As per SS 903). per 1 Sqm.(for Ceiling)

7208.16

-

1274835

... More
Construction of Integrated Market;Supply & Fixing of pre-cast RCC Grills of any design of 50 mm thick manufactured with M-30 grade of concrete using vibro-compaction process using joint less FRP moulds to achieve shuttering finish and adequately reinforced for long use and to prevent damage during handling, transportation& erection etc.,

346.4

-

236924

... More
Construction of Integrated Market;Providing and constructing 100 mm thick Reinforced Aerated (Cellular) Autoclaved Concrete Blocks conforming to IS:2185 (Part-3) - 1984 and IS:6441-1972 of Compressive strength 3 N/mm2 in line and level of size 600 x 200 x 100 mm in masonry C.M. 1:6 including cost and conveyance of all materials like cement, screened sand,Aerated (Cellular) Autoclaved Concrete Blocks, water etc., to site, including labour charges, like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, etc.,and overheads & contractors profit etc. complete for finished item of work. (APSS No. 501 & 504).

4488.68

-

3298686

... More
Construction of Integrated Market;Providing and constructing Aerated (Cellular) Autoclaved Concrete Blocks conforming to IS:2185(Part-3) - 1984 and IS:6441-1972 of Compressive strength 3 N/mm2 in line and level of size 600 x 200 x 200 mm in masonry C.M. 1:6 including cost and conveyance of all materials like cement, screened sand,Aerated (Cellular) Autoclaved Concrete Blocks, water etc., to site, including labour charges, like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, etc.,and overheads & contractors profit etc. complete for finished item of work. (APSS No. 501 & 504).

374.24

-

2787669

... More
Construction of Integrated Market;Supplying fitting and placing HYSD / Thermo Mechanically Treated (TMT) (Fe 500/500D/550D) grade as per IS 1786-1979) using primary producers of bar reinforcements below 36mm dia.s for RCC works, including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including overheads & contractors profit complete for finished item of work.( APSS No.126)

259.18

-

21918236

... More
Construction of Integrated Market;For steps

3.65

-

24205

... More
Construction of Integrated Market;Waist Slab 175mm thick at 4 m level

14.91

-

163470.11

... More
Construction of Integrated Market;Roof slab 125mm thick at 4.00 m level

687.67

-

8608961.36

... More
Construction of Integrated Market;Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes , jack props , wallers , Foot plates , brackets , steel centering plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)

271.99

-

3571444

... More
Construction of Integrated Market;Lintels

0.88

-

11732

... More
Construction of Integrated Market;Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes , jack props , wallers , Foot plates , brackets , steel centering plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) Coloums

178.45

-

2390431

... More
Construction of Integrated Market;Plinth Beams

179.34

-

2292467

... More
Construction of Integrated Market;PEDESTALS

84.8

-

905044

... More
Construction of Integrated Market;Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes , jack props , wallers , Foot plates , brackets , steel centering plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) footings

1330.07

-

13332928

... More
Construction of Integrated Market;Filling with carted good gravel in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

5636.24

-

2444550

... More
Construction of Integrated Market;BLD-CSTN-6-5-(60) : Construction of CRS Masonary 1st Sort in Cement Mortor ( 1:6 ) Prop using hard granite stone including cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones, including labour charges for cutting Stones to required size and shape, mixing of Cement Mortor, Construction, Scaffolding Charges curing etc., complete for finished item of Work .

50.11

-

247430

... More
Construction of Integrated Market;BLD-CSTN-6-12-(67) : Construction of RR Masonary in Cement Mortor ( 1:6 ) Prop using hard granite stone including cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones, including labour charges for cutting Stones to required size and shape, mixing of Cement Mortor ,Construction, Scaffolding Charges curing etc., complete for finished item of Work .

147.39

-

586737

... More
Construction of Integrated Market;BLD-CSTN-3-2 (19) -Using Concrete mixture all works up to Plinth Level: Plain Cement concrete nominal mix M10 grade using 40mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed.

591.31

-

2642032

... More
Construction of Integrated Market;BLD-CSTN-3-2 (19) -Using Concrete mixture all works up to Plinth Level: Plain Cement concrete nominal mix M10 grade using 40mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed.

393.08

-

1756321

... More
Construction of Integrated Market;BLD-CSTN-2-7 - (15) ; Earth work excavation in Hard rock (blasting prohibited)-Upto 3 m depth for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work excluding dewatering charges etc as per SS - 20 B (APSS 308).

410.85

-

856051

... More
Construction of Integrated Market;BLD-CSTN-2-2 (10): Earth work excavation in Ordinary Soil by Mechanical Means-Upto 3 m depth for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring, sheeting, planking, strutting, including backfilling etc. complete for finished item of work excluding dewatering charges etc as per SS - 20 B (APSS 308).

821.7

-

97569

... More
Construction of Integrated Market;BLD-CSTN-2-1 (9): Earth work excavation in Ordinary Soil by Manual Means-Upto 3 m depth for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, including backfilling etc. complete for finished item of work excluding dewatering charges etc as per SS - 20 B (APSS 308).

2875.94

-

728504



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.