Municipality Tender
... More
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Municipality Tender
Civil And Construction
Water Storage And Supply
Opening Date8 Mar 2025
Closing Soon13 Mar 2025
Tender Amount₹ 15,36,345
Costs
EMD
₹ 15,363Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
580353Tender No
E1/188/MNCL/2025Tender Authority
Municipality ViewPurchaser Address
-Website
http://tender.telangana.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
ws;Supply and Fixing of Compression Fittings shall comply with ISO 17885 ? 2015, PN-16 rating and manufactured from virgin resin of PE-80 having blue colour. Raw material must be WRAS Approved as per BS 6920 for effect on water quality intended for human consumption. Compression fittings should have moulded-in SS 304 threaded insert outlet with thread dimension conforming to IS 554/ISO 7. The cost shall include testing of all materials, labour, inspection charges, transportation up to site, transit insurance, loading, unloading, stacking, providing and fixing etc. Complete as specified and directed by the Departmental Engineers, but excluding all taxes.
600
108
64800
... More
ws;Supply and Fixing of Compression Fittings shall comply with ISO 17885 ? 2015, PN-16 rating and manufactured from virgin resin of PE-80 having blue colour. Raw material must be WRAS Approved as per BS 6920 for effect on water quality intended for human consumption. Compression fittings should have moulded-in SS 304 threaded insert outlet with thread dimension conforming to IS 554/ISO 7. The cost shall include testing of all materials, labour, inspection charges, transportation up to site, transit insurance, loading, unloading, stacking, providing and fixing etc. Complete as specified and directed by the Departmental Engineers, but excluding all taxes. Compression Male/ Female threaded elbow with SS Insert D20mmx1/2"
75
111
8325
... More
ws;S& F 15 mm Nominal Bore GI pipe light Grade properties & weight as per IS 1239 ISI mark with GI fittings including the cost of pipe & its fittings &labour charges complete - for stand post (TBSP-G.I-01)
75
202
15150
... More
ws;Supply and fixing of 15mm brass body CP finished bib tap of not less than 300 grams weight screw type (full turn) with internal/external threaded connection conforming to IS 8931 (TBSP-F.I-01)
75
275
20625
... More
ws;S & F Bronze Ball valve with SS Ball and SS Spindle as per IS - Class - I, Indian make heavy type - 15 mm NB Size (TBSP-G.III-20)
75
230
17250
... More
ws;House Service Connections (Regulating Brass Ferrule) The cost shall include testing of all materials, labour, Inspection charges, Transportation upto site, transit insurance, loading, unloading, stacking, providing and fixing etc. complete as specified and directed by departmental engineers, but excluding of all taxes for 1/2" connection
75
143
10725
... More
ws;110x1/2 "mm dia
10
280
2800
... More
ws;90x1/2 " mm dia
15
280
4200
... More
ws;75x1/2 " mm dia
25
266
6650
... More
ws;63x1/2 "mm dia
25
254
6350
... More
ws;Lowering, Laying, jointing of PVC/HDPE/MDPE pipes as per BIS No.7634 part-III/75 for PVC and BIS No.7634 part-II/75 for HDPE pipes including earth work excavation, testing to hydraulic test pressure including cost of water with a water lead of 500m etc., complete, but excluding road cutting (BT/CC) charges., Complete.
405
49
20245.95
... More
ws;Manufacture, Supply & Delivery of MDPE pipe conforming to ISO 4427 Part-2 (or any equivalent Bureau of Indian Standards code) of PE-80 grade material including cost of materials, manufacturing, loading, unloading, stacking, transit insurance, transportation to any where in Telangana but excluding GST.
405
34
13952.25
... More
ws;Cutting open C.C. road surface including stacking of excavated materials for pipe line trench work including labour charges and all incidental and operational charges etc., complete as directed by the departmental officers.
12.15
2664
32370.88
... More
ws;Cutting open BT road surface including stacking of excavated materials for pipe line trench work including labour charges and all incidental and operational charges etc., complete as directed by the departmental officers.
1.35
1280
1728.59
... More
ws;Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD.
63.9
6671
426336.97
... More
ws;BLD-CSTN- 2-8 modfied in 2021-22 : Filling with HBG stone chips of 2.36mm and below in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)
31.95
2006
64117.26
... More
ws;In ordinary soils, up to 3.00 Mts depth below GL by Manual means: Earthwork excavation in all kinds of soil for road restoration works as per drawings and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material , dressing of sides and bottom as per Technical Specification 305 MoRD / 304 MoRTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for laying sewer/water pipe lines including divertion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete
95.85
285
27351.76
... More
ws;Dewatering pipe line trenches etc, duly bailing out water from the pipe line trenches with oil engine driven pumpsets of 5 HP capacity, including hire charges, fuel charges and wages for Driver and Helper and all other incidental and operational charges including suction and delivery hose, lead of drain in to natural drain etc, complete as directed by the Engineer in Charge
800
68
55008
... More
ws;Carting of surplus excavated earth/soils/ rock/ debris or any other unwanted material from the site to a distance of 5kms including loading, unloading, idle hire charges of machinery suitable, dumping, labour charges for all leads & lifts and other incidental and operational charges etc., complete as directed by the Engineer in Charge.
243.87
72
17753.74
... More
ws;RBR-STCL-5 : Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202 MORD / MORTHFor Reinforced Cement Concrete and prestressed Concrete (Manual means)
2
2599
5199.82
... More
ws;RBR-STCL-5 : Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202 MORD / MORTHFor Cement Concrete M15 & M20 (Manual means)
6
940
5645.7
... More
ws;RBR-STCL-5 : Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202 MORD / MORTHFor CC upto M10 (Manual means)
1.5
777
1166.84
... More
ws;EF Coupler D110mm PE 100BK 4PIN
5
288
1440
... More
ws;EF Coupler D90mm PE 100BK 4PIN
5
221
1105
... More
ws;110 x 125 mm
5
246
1230
... More
ws;90x110mm
5
162
810
... More
ws;75x90mm
5
117
585
... More
ws;63x75mm
5
72
360
... More
ws;110mm dia
5
274
1370
... More
ws;90mm dia
5
230
1150
... More
ws;75mm dia
5
131
655
... More
ws;63mm dia
5
109
545
... More
ws;110mm dia
5
167
835
... More
ws;90mm dia
5
161
805
... More
ws;75mm dia
5
148
740
... More
ws;63mm dia
5
118
590
... More
ws;110mm dia
5
143
715
... More
ws;90mm dia
5
103
515
... More
ws;75mm dia
5
80
400
... More
ws;63mm dia
5
66
330
... More
ws;110mm dia
5
83
415
... More
ws;90mm dia
5
72
360
... More
ws;75mm dia
5
54
270
... More
ws;63mm dia
5
44
220
... More
ws;110mm dia
5
279
1395
... More
ws;90mm dia
5
213
1065
... More
ws;75mm dia
5
125
625
... More
ws;63mm dia
5
95
475
... More
ws;110mm dia HDPE Pipe 6kg/sqcm
50
71
3550
... More
ws;90mm dia HDPE Pipe 6kg/sqcm
20
58
1160
... More
ws;75mm dia HDPE Pipe 6kg/sqcm
300
49
14700
... More
ws;63mm dia HDPE Pipe 6kg/sqcm
300
45
13500
... More
ws;110mm dia HDPE Pipe 6kg/sqcm
50
347
17391
... More
ws;90mm dia HDPE Pipe 6kg/sqcm
20
206
4124
... More
ws;75mm dia HDPE Pipe 6kg/sqcm
300
143
42978
... More
ws;63mm dia HDPE Pipe 6kg/sqcm
300
102
30624
... More
ws;BLD-CSTN- 2-8 modfied in 2021-22 : Filling with HBG stone chips of 2.36mm and below in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)
9.27
2006
18603.04
... More
ws;PHE-BHLW-26 : Barricading, hoarding, lighting and watching etc., for water supply and sewerage works for trenches of depths upto 6?-0? (2 Meter) below G.L as directed by the departmental officers
67
225
15097.78
... More
ws;RBR-FNDN-1- ( I-A-i ) In ordinary soils, up to 3.00 Mts depth below GL by Manual means: Earthwork excavation in all kinds of soil for Pipe line trenches as per drawings and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material , dressing of sides and bottom as per Technical Specification 305 MoRD / 304 MoRTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for laying sewer/water pipe lines including divertion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete for Pipe Line trenches by manual means.
254.34
285
72578.46
... More
ws;RBR-FNDN-1- (I-B-i) - In ordinary soils up to 3.00 Mts depth below GL by Mechanical means: Earthwork excavation in all kinds of soil for Pipe line trenches as per drawings and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material, dressing of sides and bottom as per Technical Specification 304 MORTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for laying sewer/water lines including divertion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete for Pipe Lines by mechanical means.
28.26
128
3623.78
... More
ws;Cutting open C.C. road surface including stacking of excavated materials for pipe line trench work including labour charges and all incidental and operational charges etc., complete as directed by the departmental officers.
42.31
2664
112725.26
... More
ws;Cutting open BT road surface including stacking of excavated materials for pipe line trench work including labour charges and all incidental and operational charges etc., complete as directed by the departmental officers.
3.75
1280
4801.65
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%