Municipality Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
530405Tender No
NIT No.05/DB/KMC/2595/2024-25,Dt.23.07.2024/SDF/03(5th Call) Rs.24.00 LakhsTender Authority
Municipality ViewPurchaser Address
-Website
http://tender.telangana.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
NIT 53/07;RCC ramps
6.75
3190
21535
NIT 53/07;cc road cutting
7.5
3330
24978
NIT 53/07;BLD-CSTN-2-7 - (15) ; Earth work excavation in Hard rock (blasting prohibited)-Upto 3 m depth for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work excluding dewatering charges etc as per SS - 20 B (APSS 308).
22.5
1606
36138
NIT 53/07;RBR-FNDN-1 -mechanical means : Earthwork excavation for structures in all types of soil as per drawing and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH.
-
-
-
NIT 53/07;Mechanical Means
389.34
128
49937
NIT 53/07;Manual means
166.86
4695
78351
NIT 53/07;Supply and filling of stone dust including cost and conveyance of all materials, watering and labour charges for filling, overheads & contractor profit etc., complete under CC bed
35.78
1205
43126
NIT 53/07;PCC (1:5:10) prop.(nominal mix) Using 40/20mm HG metal including cost and conveyance of all materials, mixing., lyaing, tamping, curing, labour charges etc.complete.
2.7
5004
13513
NIT 53/07;PCC M15 Design mix MORTH 12.84 table using 20mm gauge machine crushed HG metal from approved quarry including cost and conveyance of all materials like OPC 53 Grade Cement of ake:ACC/Ultratech/CCI/Lafarge/Penna Premium etc., fine aggregate i.e., Godavari Sand (Bhadrachalam Quarry), coarse aggregate, potable drinking water etc. to site, sales & other taxes on all materials, machine mixing charges, laying concrete in position, vibrating, curing, centering charges, overheads & contractors profit etc., for finished item of work for Drain & Culvert Bed and Side Walls
-
-
-
NIT 53/07;FOR DRAIN BED
68.85
5869
404099
NIT 53/07;Side Walls
165.11
5885
971801
NIT 53/07;RCC grade M 30 design mix using 20mm graded metal (MORTH) including C&C of all materials, machine mixing, centering, laying, vibrating, curing, labour charges etc. complete. (For buildings & supersturcture upto 5 Mt height.)
5.4
6409
34609
NIT 53/07;Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) ( Fe 500 grade as per IS 1786-1979) of Make : Vizag Steel/TATA/SAIL/ Jindal etc., of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials and overheads & contractors profit etc., complete for finished item of work in all floors.( APSS No.126)
540
79
42935
NIT 53/07;Construction of un-reinforced, cement concrete pavement with M30 grade mix,plain cement concrete pavement, thickness any other type as per Clause 1501.2.2 M30 (Grade) coarse and fine aggregates of 20mm IRC metal confirming to IS:383, maximum in a concrete mixer of not less than 0.2 cum capacity and laid in approval fixed side form work (steel channel, laying and fixing of steel plates including levelling the form work as per drawing) spreading the concrete with shovels, rekes, complacted using plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, curing of concrete slabs for 14 days water finishing to lines.
14.4
6942
99972
NIT 53/07;Collection and supply of Gravel for side berms and spreading of gravel in irrespective of thickness including cost and conveyance of material to work site, all labour charges and stacking to deptl. gauge and overheads & contractors profit etc. complete for fnished item of work.
315
262
82697
NIT 53/07;Conveyance / carting charges for machinery for 1KM for transporting materials by tippers and trucks earth/sand/gravel
417.15
60
25438
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements