Municipality Tender
... More
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Municipality Tender
Civil And Construction
Building Construction
Opening Date28 Mar 2025
Closing Date2 Apr 2025
Tender Amount₹ 2,47,387
Costs
EMD
₹ 2,474Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
585472Tender No
E2/2780-89/2024Tender Authority
Municipality ViewPurchaser Address
-Website
http://tender.telangana.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Community Hall;Observed data with BLD-CSTN-12-11-(187):Painting to new walls with 2 couts of acrylic emulsion paint of approved brand and shade after thoroughly brushing the surface to remove all 14 dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 911 for Internal walls
26.43
112
2986.33
... More
Community Hall;BLD-CSTN-11-5-(162): White washing two coats with whiting of approved quality to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as 13 scaffolding, lift charges etc., complete for finished item of work, but excluding conveyance charges of materials
120.07
46
5542.43
... More
Community Hall;BLD-CSTN-8-1-(76): Plastering with 12mm thick in single coat in CM (1:3) finished smooth including cost and conveyance of all materials to site, on all materials, finishing, curing, 12 scaffolding and all operational, incidental, labour charges etc., including cutting grooves where ever necessary etc., complete for finished item of work. (As per SS 903). (only for Ceiling)
26.43
216
5718.92
... More
Community Hall;BLD-CSTN-8-7-(82): Plastering with 20mm thick in single coat in CM (1:4) finished smooth 10 including cost and conveyance of all materials to site, finishing, curing, scaffolding and all operational, incidental, labour charges etc., including cutting grooves where ever necessary etc., complete for finished item of work. (As per SS 903).
93.64
310
29052.75
... More
Community Hall;BLD-CSTN-5-4-(42): Brick Masonary 2nd Class Ground moulded or treditional size 23x11x7 Cm in Cement Mortor 1:6 Prop including Cost & conveyance of all Materials like Cement, 9 Sand, Bricks, Water, etc., to site cost of, on all materials, including all labour charges like mixing Cement Mortor, scaffoding charges lift charges, curing charges etc., complete for finished item of work Horizontal Walls
10
7450
74500.1
... More
Community Hall;BLD-CSTN-3-16-(3)-C: Supply and placing of the M-25 Design Mix Concrete corresponding to 15 456 using WEIGH BATCHER/MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all mixing, laying, 8 concrete, curing etc. complete bur cherming cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum censent content as per 15 code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work for RCC SLABS, BEAMS Note: 1) The cement content is adopted as 380Kg/cum for estimating purpose only. The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kos/Cum the defference in cost, shall he deducted.
3.3
12978
42830.37
... More
Community Hall;Carting of surplus excavated material such as Earth, Rock and debries within a lead of 5Km from the site to a suitable distance including loading & unloading charges, cost & conveyance, dumping, labour charges, all leads & lifts and other incidental and operational charges etc., complete
2.9
157
456
... More
Community Hall;Amendment 2021-22 BLD-CSTN-2-8 (16): Filling with Gravel in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating 6 each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)
16.13
520
8390.66
... More
Community Hall;BLD-CSTN-6-6-(61): Construction of CRS Masonary 2nd Sort in Cement Mortor (1:6) Prop using hard granite stone including cost & Conveyance of all materials like Cement, Sand, 5 Water, Granite Stones, including, on all Materials, labour charges for cutting Stones to required size and shape, mixing of Cement Mortor, Construction, Scaffolding Charges curing etc., complete for finished item of Work
3.62
5601
20277.9
... More
Community Hall;BLD-CSTN-6-13-(68): Construction of RR Masonary in Cement Mortor (1:8) Prop using hard granite stone including cost & Conveyance of all materials like Cement, Sand, Water, Granite 4 Stones, including labour charges for cutting Stones to required size and shape, mixing of Cement Mortor, Construction, Scaffolding Charges curing etc., complete for finished item of Work.
3.01
4506
13563.75
... More
Community Hall;BLD-CSTN-3-7-(24) Using Concrete mixture all works up to Plinth Level: Plain Cement concrete nominal mix (1:5:10) prop (Cement: fine aggregate: coarse aggregate) using 40mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like 3 cement, sand, coarse aggregate water etc., to site, on all materials, labour charges, for mixing, laying, concrete, ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work. for foundation and under flooring bed
2.9
4415
12803.5
... More
Community Hall;BLD-CSTN-2-7-(15); Earth work excavation in Hard rock (blasting prohibited)-Upto 3 m depth for foundations and depositing on bank for all lifts and with an initial lead of 10m 2 including all operational, incidental, labour charges such as shoring,sheeting, planking. strutting, etc. complete for finished item of work including seigniorage excluding dewatering charges etc as per SS-20 B (APSS 308).
0.72
2202
1585.78
... More
Community Hall;BLD-CSTN-2-1 (9): Earth work excavation in Ordinary Soil by Manual Means-Upto 3 m depth for foundations and depositing on bank for all lifts and with an initial lead of 10m including all 1 operational, incidental, labour charges such as shoring, sheeting, planking, strutting, etc. complete for finished item of work including seigniorage excluding dewatering charges etc as per SS-20 B (APSS 308).
2.9
285
827.54