Municipality Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Municipality Tender

Works
Civil And Construction
Excavation
Opening Date24 Jan 2025
Closing Soon30 Jan 2025
Tender Amount₹ 5,61,585 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Shifting of Poles;Un-Loading of 9.1 M long PSCC poles.

18

77

1394.46

... More
Shifting of Poles;Detailed survey including angle points and peg marking preparation of pole schedules and detailed routeMap.

1.05

911

957.32

... More
Shifting of Poles;Dismantling of 9.1M PSCC pole which cannot be Re-Used - 11KV Lines.

16

238

3813.76

... More
Shifting of Poles;Fixing of LT Shackles withMetal Parts on already existing poles.

10

17

178.8

... More
Shifting of Poles;Fixing of LT Pin Insulators with G.I Pins on already existing poles.

25

17

447

... More
Shifting of Poles;Erection of LT 3-Ph,5 W/L X-arm on already existing poles.

7

119

834.26

... More
Shifting of Poles;LT Service wire Re-connection areially.

125

89

11173.75

... More
Shifting of Poles;LT Service wire Disconnection areially.

125

71

8938.75

... More
Shifting of Poles;Dismantling of existing Lines including Loading,Transport and Un-Loading and devolution to District Stores, LT 3-Phase (5 Conductors with conductor size of 34sqmm).

1.05

5363

5631.26

... More
Shifting of Poles;D) For LT Service : Paving out conductor,providing temporary stays,tensioning,sagging correctly,fixing strain points,transferring to pin points binding,keeping stifner,rectification of poles,guys and jumpering etc.,final tensioning and loading with tractor including transport of Material from road side to location, LT 3-Phase (5 Conductors with conductor size of 34sqmm).

1.05

12145

12753.07

... More
Shifting of Poles;M.S.Back Clamps suitable for 9.1 M PSCC Pole made from M.S Flat 50x6mm as per drawings enclosed. The Back Clamps shall painted with double coat of best quality Red Oxide paint. Net Weight of Each: 1.266Kgs. M.S.Back Clamps for 9.1M Pole Flat50x6mm

28

103

2906.4

... More
Shifting of Poles;9.1M PSCC POLE-280KG WL

18

3508

63157.5

... More
Shifting of Poles;LT 3 Ph. 5 Wire Side Arms

28

1309

36652

... More
Shifting of Poles;MS BOLTS & NUTS 16 x 75 mm(5/8 x 3")

30

106

3192.6

... More
Shifting of Poles;LT Metal parts/Hardware Fittings

40

59

2367.6

... More
Shifting of Poles;LT Shackle Insulator

40

44

1782

... More
Shifting of Poles;LT GI Pin

90

47

4235.4

... More
Shifting of Poles;LT Pin Insulator

90

44

4009.5

... More
Shifting of Poles;C) For LT Material: AAA conductor 34 Sq. mm

5300

31

164353

... More
Shifting of Poles;Fixing base plates,alignment of anchor rod,fixing of clamps,guy insulators,trunckle etc.,on the pole,fixing of stay wire,binding securely on either side and tensioning including transport of Material from road side to location and back filling with earth ramming as per standards (excluding cost of excavation pit and all aboveMaterial), LT Stay sets.

2

595

1191.8

... More
Shifting of Poles;Excavation of Stay pits (PER PIT) in all soils (except hard gravel,hardMorrum,disinte grated rock and hard rock requiring blasing) or Augur Machine, 1'6"x1'6"x4'6" (0.45M x 0.45M x1.35M).

2

619

1239.48

... More
Shifting of Poles;Detailed survey including angle points and peg marking preparation of pole schedules and detailed routeMap.

0.3

911

273.52

... More
Shifting of Poles;Dismantling of 9.1M PSCC pole which cannot be Re-Used - 11KV Lines.

7

238

1668.52

... More
Shifting of Poles;Transportation of material from stores to section office.

2

2221

4443.04

... More
Shifting of Poles;Dismantling of existing Lines including Loading,Transport and Un-Loading and devolution to District Stores, 55sqmm Single Circuit (3 Conductors).

0.3

7748

2324.45

... More
Shifting of Poles;Un-Loading of 11.0 M long PSCC poles.

2

107

214.52

... More
Shifting of Poles;Loading of 11.0 M long PSCC poles.

2

190

381.38

... More
Shifting of Poles;Un-Loading of 9.1 M long PSCC poles.

5

77

387.35

... More
Shifting of Poles;Loading of 9.1 M long PSCC poles.

5

166

834.25

... More
Shifting of Poles;Paving out conductor,providing temporary stays,tensioning,sagging correctly,fixing strain points,transferring to pin points binding,keeping stifner,rectification of poles,guys and jumpering etc.,final tensioning and loading with tractor including transport of Material from road side to location, 55sqmm Single Circuit (3 Conductors).

0.3

10130

3039.09

... More
Shifting of Poles;ERECTION OF POLES IN 11KV LINES:, Erection of pole in position,aligning and setting to work,fixing of cross arms and top clamps,fixing of Insulators/Discs,earthing to supports,back filling with earth and stones property ramming including transport ofMaterials from road side to location excluding pit excavation, 11.0M PSCC Pole.

2

4171

8342.6

... More
Shifting of Poles;ERECTION OF POLES IN 11KV LINES:, Erection of pole in position,aligning and setting to work,fixing of cross arms and top clamps, fixing of Insulators/Discs,earthing to supports, back filling with earth and stones property ramming including transport of Materials from road side to location excluding pit excavation, 9.1M long PSCC Pole.

5

2860

14301.6

... More
Shifting of Poles;B) For HT Service : Excavation of pits (PER PIT)in all soils (except hard gravel,hardMorrum,disinte grated rock and hard rock requiring blasting)for line poles as well as Strut poles , 2'6"x2'6"x6'0" (0.75M x 0.75M x 1.80M) or 20" dia and 6'0" depth (0.6M dia 1.80M depth) with Augur Machine for 9.1M PSCC Poles or 11.0M PSCC Poles or R.S-Joist Poles of above 8.M and below 12M length.

7

834

5839.82

... More
Shifting of Poles;G.I.Stay Wire 7/3.15mm(10SWG)

20

97

1947

... More
Shifting of Poles;11KV Guy Insulators (HT)

2

55

111.62

... More
Shifting of Poles;Stay clamp set-MSFlat 50x6mm-0.320Mx2

2

109

219.34

... More
Shifting of Poles;11KV MS Stay Set without BasePlate

2

1550

3101.06

... More
Shifting of Poles;11M PSCC Pole-365Kg WL

2

6216

12433.1

... More
Shifting of Poles;11KV Polymer Pin Insulators with Pin

21

413

8691.9

... More
Shifting of Poles;11KV Side Arm

7

1675

11729.69

... More
Shifting of Poles;MS BOLTS & NUTS 16 x 75 mm(5/8 x 3")

15

106

1596.3

... More
Shifting of Poles;M.S.Back Clamps suitable for 9.1 M PSCC Pole made from M.S Flat 50x6mm as per drawings enclosed. The Back Clamps shall painted with double coat of best quality Red Oxide paint. Net Weight of Each: 1.266Kgs. M.S.Back Clamps for 9.1M Pole Flat50x6mm

7

103

726.6

... More
Shifting of Poles;11KV Metal parts/Hardware fittings-C&T

6

141

847.2

... More
Shifting of Poles;11KV Polymer Insulators (C&T)

6

321

1930.08

... More
Shifting of Poles;9.1M PSCC POLE-280KG WL

5

3508

17543.75

... More
Shifting of Poles;A) For HT Material : AAA conductor 55 Sq. mm

900

64

57942



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.