Municipality Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Municipality Tender
Civil And Construction
Drainage Work
Opening Date18 Jan 2025
Closing Date24 Jan 2025
Tender Amount₹ 10,26,707
Costs
EMD
₹ 10,267Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
568857Tender No
E1/DB/MCK/8201/203/2024-25/31, Dt: 15-01-2025Tender Authority
Municipality ViewPurchaser Address
-Website
http://tender.telangana.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
RCC pipes;Constructing 457.2 mm x 457.2 mm(1'6" x 1' 6") brick in cm 1.6 prop masonry inspection chambers upto 914.4 mm (3'0") fitted with high weight 457.2 mm x 457.2 mm (1'6" x 1'6") C.I. frame and cover of 20 kg etc. complete.
10
5237
52377
... More
RCC pipes;Lowring the RCC S/S pipes carefully into the ready made trenches Laying them ture to alignment and gradient, jointing with rubber rings and testing including filling with water with water lead up to 500 meters including cost of reberrings 300mm dia
70
191
13388
... More
RCC pipes;Lowring the RCC S/S pipes carefully into the ready made trenches Laying them ture to alignment and gradient, jointing with rubber rings and testing including filling with water with water lead up to 500 meters including cost of reberrings 600mm dia
120
286
34388
... More
RCC pipes;Manufactures supply and delivery of RCC Spun/vibrated cost (reinforced) socket and spigot pipes conforming TO B.I. S458/2003. EX-Factory (Rate per meter of Effetive Length) Excluding Transportati Taxes, Duties, etc complete. NP3 300mm dia
70
1643
115028
... More
RCC pipes;Manufactures supply and delivery of RCC Spun/vibrated cost (reinforced) socket and spigot pipes conforming TO B.I. S458/2003. EX-Factory (Rate per meter of Effetive Length) Excluding Transportati Taxes, Duties, etc complete. NP3 600mm dia
120
4176
501211
... More
RCC pipes;RBR- FNDN-2 Collection , supply and filling of HBG Stone chipes 2.36mm and below spall from approved quarry to work site and stocking at work site to dept guage for premeasurements including cost and conveyance of all materials and labour charges etc., complete as per standard specification clause 305.39 MORD & 304 MORTH
21
1318
27692
... More
RCC pipes;Earth work excavation and depositing on bank (manual means) with initial lead of 10m and initial lift of 3m in Loamy & Clayey Soils like BC Soils, Red Earth & Ordinary Gravelly Soils ( SS 20-B) including all operational incidental labour charges such as shoring, strutting, sheeting, planking and dewatering including cost of hire charges of T & P, labour charges etc., complete for finished item of work excluding seignerage charges and dewatering charges etc., complete for Foundation of Building.(APSS No. 308)
162
297
48153
... More
RCC pipes;Dismantling of existing structures like culverts, bridges , retaining walls and other structure comprising of masonry, cement concrete wood work, steel work, including t&p and scaffolding wherever necessary, sorting the dismantlind material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as technical specification clause 202 MORD / MORTH.
4.05
2703
10947
... More
RCC pipes;Dismantling of existing structures like culverts, bridges , retaining walls and other structure comprising of masonry, cement concrete wood work, steel work, including t&p and scaffolding wherever necessary, sorting the dismantlind material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as technical specification clause 202 MORD / MORTH.
12.15
635
7718
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements