Municipality Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Municipality Tender

Works
Civil And Construction
Building Construction
Opening Date30 Aug 2024
Closing Date6 Sep 2024
Tender Amount₹ 3,25,959 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Balance work for Construction of Buda Bukkala Sangam in Ward No 18 of Siddipet town under MGF/other;Supply and Transportation and fixing on wall / ceiling of 1x36/40W box type tube light luminaire with copper / VPIT Choke, condensor, starters etc., and 1No 36/40W tube etc., complete.with all standard accessories of makes Wipro / G.E./ Phillips.

8

1311

10490.32

... More
Balance work for Construction of Buda Bukkala Sangam in Ward No 18 of Siddipet town under MGF/other;Supply and Fixing of 1200 mm (48") sweep 230V, A.C 50 Hz.Ceiling fan with 3 Blades and double ball bearings with all standard accessoriesand 400W Mini Modular Stepped type Electronic Regulator with Cover Frame including providing fan hook of 12/15mm dia M.S. rod / bar grouted in RCC slab with making the slab as original and 19/20mm steel tube down rod of one meter length with bolts & nuts duly painted with matching colour of fan etc,. complete

6

4259

25556.04

... More
Balance work for Construction of Buda Bukkala Sangam in Ward No 18 of Siddipet town under MGF/other;Supply, Delivery and fixing of teak wood door including door frame of size 1.20 x 2.10 . Size of verticals of 7' X 4" x 5" 2 nos and horizontals of 4' x 4" x5" and door shutter of 2.00m x 0.6 m including covering and necessary accessories etc hinger, aldrops and stainless steel handle, Polishing the teak wood door etc. complete for finished item of work .

1

70000

70000

... More
Balance work for Construction of Buda Bukkala Sangam in Ward No 18 of Siddipet town under MGF/other;Supply, Delivery and fixing of teak wood door including door frame of size 1.20 x 2.10 . Size of verticals of 7' X 4" x 5" 2 nos and horizontals of 4' x 4" x5" and door shutter of 2.00m x 0.6 m including covering and necessary accessories etc hinger, aldrops and stainless steel handle, Polishing the teak wood door etc. complete for finished item of work .

1

90000

90000

... More
Balance work for Construction of Buda Bukkala Sangam in Ward No 18 of Siddipet town under MGF/other;Supplying and fixing of MS Grill for windows using 25mm x 6mm MS flat alround and 10mm MS square bars horizontally at 125mm centre to centre and vertically at 30cm centre to centre including fixing with 4 Nos of MS Z holdfasts (2 on each side) duly making cutting brick masonry, fixing and making to original surface neatly and painting grill with one coat of red oxide primer including and conveyance of all materials ,cutting, bending, welding including all operational charges and all labour charges etc., complete for finished item of work.

200

111

22280

... More
Balance work for Construction of Buda Bukkala Sangam in Ward No 18 of Siddipet town under MGF/other;BLD-CSTN-9-4-(102) :Flooring with chequrred terrazzo tiles of 22 mm thick (medium shade) set over base coat of cement mortar (1:6) 12 mm thick over CC bed already laid or RCC roof slab, including near cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed with neat cement to full depth mixed with pigment of matching shade including cost of all materials like cement, sand water and tiles etc., complete, complete for finished item of work, but excluding the cost of conveyance of all materials.

24

936

22472.88

... More
Balance work for Construction of Buda Bukkala Sangam in Ward No 18 of Siddipet town under MGF/other;Providing skirting to internal walls to 15cm height/risers of step swith vitrified tiles length equal to flooring stones, set over base coat of CM(1:5) 12mm thick with cement slurry of honey like consistency spread at the rate of 3.30kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., complete excluding seigniorage charges, etc., complete for finished item of work, but excluding the cost of conveyance of all materials

2.83

1121

3173.22

... More
Balance work for Construction of Buda Bukkala Sangam in Ward No 18 of Siddipet town under MGF/other;BLD-CSTN-9-5-(103) : Flooring with Nano polished /stain free soluble salt porcelain vitrified tiles screen printed of size 600 x 600 mm and thickness between 8-10 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc. etc., complete for finished item of work, including the cost and conveyance of all materials

53.5

1133

60624.06



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.