Municipality Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Municipality Tender

Works
Civil And Construction
Drainage Work
Opening Date5 Sep 2024
Closing Date11 Sep 2024
Tender Amount₹ 7,81,462 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
BOQ;Carting away the surplus excavated earth from work site with minimum lead of 0.5/1.0km beyond initial lead including loading, unloading and conveyance etc. complete.

132

61

8052

... More
BOQ;Supply and Filling of HBG stone chips 2.36 mm and below in foundation trenches including cost & conveyance of all materials, labour charges, seigniorage charges etc., complete.

12.33

1004

12390

... More
BOQ;Laying of V.C.C. (1:4:8) using 40 mm m/c metal and OPC,coarse and fine aggregate with concrete mixture. All work upto plinth level including cost & conveyance of all materials, labour charges, machine mixing, centering, laying in position, curing etc., complete.

24.65

5176

127600

... More
BOQ;Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and technical specifications for Bars below 36 mm dia including over laps and wastage, where they are not welded.

72.84

78

5741

... More
BOQ;Providing concrete for VRCC M30 using 20mm nominal size graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications etc., complete.

7.05

6906

48689

... More
BOQ;P.C.C M15 using 20 mm m/c metal and OPC, coarse and fine aggregate with concrete mixture. All work upto plinth level including cost & conveyance of all materials, labour charges, machine mixing, cetering, laying in position, curing etc. complete.(side Walls)

55.2

5952

328568

... More
BOQ;P.C.C M15 using 20 mm m/c metal and OPC, coarse and fine aggregate with concrete mixture. All work upto plinth level including cost & conveyance of all materials, labour charges, machine mixing, cetering, laying in position, curing etc. complete.(vent portion)

6.9

5723

39491

... More
BOQ;Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and technical specifications for Bars below 36 mm dia including over laps and wastage, where they are not welded.

619.5

78

48823

... More
BOQ;Providing concrete for VRCC M30 using 20mm nominal size graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications etc., complete.

4.13

6906

28523

... More
BOQ;Providing concrete for V.C.C. M30 using 20mm nominal size graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications etc., complete.

14

6499

90996



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.