Municipality Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Municipality Tender

Works
Civil And Construction
Building Construction
Opening Date28 Jun 2024
Closing Date5 Jul 2024
Tender Amount₹ 6,12,484 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Balance work of Construction of Kitchen cum Dining hall MPPS at 2BHK (KCR Nagar ) Siddipet Urban Und;Supply, fabrication and fixing in position of MS tubular trusses including cost and conveyance of all material and all labour chages etc complete.

360

105

38037.6

... More
Balance work of Construction of Kitchen cum Dining hall MPPS at 2BHK (KCR Nagar ) Siddipet Urban Und;Supply, fabrication and fixing in position of MS Purlines including cost and conveyance of all material and all labour chages etc complete.

80

293

23506.08

... More
Balance work of Construction of Kitchen cum Dining hall MPPS at 2BHK (KCR Nagar ) Siddipet Urban Und;Supply and fixing of base plate of 10 mm thick 200x200 mm M.s. plates for base plates, 250 mm long 12mm F anchor bolts with plate washer and nuts complete with one coat of Asian or equivalent red oxide paint.

4

1062

4248.28

... More
Balance work of Construction of Kitchen cum Dining hall MPPS at 2BHK (KCR Nagar ) Siddipet Urban Und;Supply and Fixing in position of MS heavy structural steel including cost and conveyance of all material , labour charges for fabrication and fixing in postion etc,. Complete.

320

77

24928

... More
Balance work of Construction of Kitchen cum Dining hall MPPS at 2BHK (KCR Nagar ) Siddipet Urban Und;BLD-CSTN-5-4-(42): Brick Masonary 2nd Class Ground moulded or treditional size 23x11x7 Cm in Cement Mortor 1:6 Prop including Cost & conveyance of all Materials like Cement, Sand, Bricks, Water, etc., to site cost of Seigniorage charges on all materials, including all labour charges like mixing Cement Mortor, scaffoding charges lift charges, curing charges etc., complete for finished item of work

7.84

7968

62455.16

... More
Balance work of Construction of Kitchen cum Dining hall MPPS at 2BHK (KCR Nagar ) Siddipet Urban Und;BLD-CSTN-3-13- ( 30 ) - B- Nominal mix: RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (50% river sand 50% rock sand), coarse aggregate, water etc., to site and sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, but including centering and shuttering charges for FOOTINGS, PEDESTALS AND PLINTH

1.93

13550

26179.76

... More
Balance work of Construction of Kitchen cum Dining hall MPPS at 2BHK (KCR Nagar ) Siddipet Urban Und;BLD-CSTN-4-1-(34) BLD-Amendment Sl No. 5, Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) steel bars (Fe 500/550/550D) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying etc., complete for finished item of work in all floors.( APSS No.126 )

150

89

13401

... More
Balance work of Construction of Kitchen cum Dining hall MPPS at 2BHK (KCR Nagar ) Siddipet Urban Und;BLD-CSTN-6-5-(60) : Construction of CRS Masonary 1st Sort in Cement Mortor ( 1:6 ) Prop using hard granite stone including cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones, labour charges for cutting Stones to required size and shape, mixing of Cement Mortor, Construction, Scaffolding Charges curing etc., complete for finished item of Work .

18.2

6462

117619.87

... More
Balance work of Construction of Kitchen cum Dining hall MPPS at 2BHK (KCR Nagar ) Siddipet Urban Und;BLD-CSTN-3-6 ( 23 ) -Hand mixing up to Plinth Level : Plain Cement concrete nominal mix (1:5:10) prop (Cement : fine aggregate: coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand (50% river sand 50% rock sand), coarse aggregate water etc., to site , labour charges , for mixing, laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed.

2.73

5142

14039.54

... More
Balance work of Construction of Kitchen cum Dining hall MPPS at 2BHK (KCR Nagar ) Siddipet Urban Und;BLD-CSTN-2-1 (9): Earth work excavation in Ordinary Soil by Manual Means-Upto 3 m depth for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work excluding dewatering charges etc as per SS - 20 B (APSS 308).

18.2

270

4922.55

... More
Balance work of Construction of Kitchen cum Dining hall MPPS at 2BHK (KCR Nagar ) Siddipet Urban Und;BLD-CSTN-3-13- ( 30 ) - B- Nominal mix: RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (50% river sand 50% rock sand), coarse aggregate, water etc., to site and sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, but including centering and shuttering charges for COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS - WOODEN SCAFFOLDING 3.for columns upto plinth bottom

2.43

12832

31183.32

... More
Balance work of Construction of Kitchen cum Dining hall MPPS at 2BHK (KCR Nagar ) Siddipet Urban Und;BLD-CSTN-3-13- ( 30 ) - B- Nominal mix: RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (50% river sand 50% rock sand), coarse aggregate, water etc., to site and sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, but including centering and shuttering charges for FOOTINGS, PEDESTALS AND PLINTH 2.Pedestals

3.46

11240

38848.24

... More
Balance work of Construction of Kitchen cum Dining hall MPPS at 2BHK (KCR Nagar ) Siddipet Urban Und;BLD-CSTN-3-13- ( 30 ) - B- Nominal mix: RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (50% river sand 50% rock sand), coarse aggregate, water etc., to site and sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, but including centering and shuttering charges for FOOTINGS, PEDESTALS AND PLINTH 1.Footings

8.1

10545

85414.74

... More
Balance work of Construction of Kitchen cum Dining hall MPPS at 2BHK (KCR Nagar ) Siddipet Urban Und;BLD-CSTN-4-1-(34) BLD-Amendment Sl No. 5, Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) steel bars (Fe 500/550/550D) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying etc., complete for finished item of work in all floors.( APSS No.126 )

150

89

13401

... More
Balance work of Construction of Kitchen cum Dining hall MPPS at 2BHK (KCR Nagar ) Siddipet Urban Und;BLD-CSTN-3-6 ( 23 ) -Hand mixing up to Plinth Level : Plain Cement concrete nominal mix (1:5:10) prop (Cement : fine aggregate: coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand (50% river sand 50% rock sand), coarse aggregate water etc., to site , labour charges , for mixing, laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed.

2.7

5142

13885.26

... More
Balance work of Construction of Kitchen cum Dining hall MPPS at 2BHK (KCR Nagar ) Siddipet Urban Und;BLD-CSTN-2-1 (9): Earth work excavation in Ordinary Soil by Manual Means-Upto 3 m depth for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work excluding dewatering charges etc as per SS - 20 B (APSS 308).

27

527

14240.07



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.