For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
₹ 1,645Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
539384Bid Award Id
ViewTender No
E1/15th FC/1145/18/2024-25Tender Authority
Municipality ViewPurchaser Address
-Website
http://tender.telangana.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Laying of UPVC Pipe line area in ward no.14 Under 15th Finance Grants;Thread seal
48
15
720
... More
Laying of UPVC Pipe line area in ward no.14 Under 15th Finance Grants;1/2''GI Neppals
48
45
2160
... More
Laying of UPVC Pipe line area in ward no.14 Under 15th Finance Grants;1'' Ball valve
3
200
600
... More
Laying of UPVC Pipe line area in ward no.14 Under 15th Finance Grants;1/2'' Ball valve
48
182
8736
... More
Laying of UPVC Pipe line area in ward no.14 Under 15th Finance Grants;1/2'' Elbow
48
45
2160
... More
Laying of UPVC Pipe line area in ward no.14 Under 15th Finance Grants;1/2'' UPVC pipe 3 Mtr length
16
335
5360
... More
Laying of UPVC Pipe line area in ward no.14 Under 15th Finance Grants;1'' x 1/2'' Tee UPVC
48
38
1824
... More
Laying of UPVC Pipe line area in ward no.14 Under 15th Finance Grants;1'' UPVC MTA
3
45
135
... More
Laying of UPVC Pipe line area in ward no.14 Under 15th Finance Grants;1'' UPVC FTA
3
45
135
... More
Laying of UPVC Pipe line area in ward no.14 Under 15th Finance Grants;1'' UPVC Union
3
178
534
... More
Laying of UPVC Pipe line area in ward no.14 Under 15th Finance Grants;1'' UPVC 45
3
48
144
... More
Laying of UPVC Pipe line area in ward no.14 Under 15th Finance Grants;1'' UPVC Cuplings
50
28
1400
... More
Laying of UPVC Pipe line area in ward no.14 Under 15th Finance Grants;1'' UPVC Tee
3
60
180
... More
Laying of UPVC Pipe line area in ward no.14 Under 15th Finance Grants;Supply and delivery of UPVC Pipe fitting materials and fixing including cost and convayance,all charges excluding GST etc.,complete 1'' UPVC Elbow
3
55
165
... More
Laying of UPVC Pipe line area in ward no.14 Under 15th Finance Grants;Manufacture, supply, & delivery of Polyethylene pipes (PE-100 Grade) for water supply conforming to IS 4984-2016 including transportation to any where in T.G, but excluding GST and specials etc., complete. (Supply upto 90 mm dia in coil & above 90 mm dia stright length in 6 M.) 10kg/sq.mm OD 40MM
150
73
11077.5
... More
Laying of UPVC Pipe line area in ward no.14 Under 15th Finance Grants;Earth work excavation in all kinds of soils for pipeline trenches as per drawings and technical specification including setting out constructions of shoring and grassing removal of stumps and other deleterious material dressing of sides and bottom and as per the technical specification MORTH and as directed by the departmental officers including protecting the existing utility services wherever it possible during the execution and taking all precautionary measures in the restricted areas for laying water lines including diversion of traffic and back filling trenches with excavated suitable materials and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete for pipelines by manual means.
27
285
7704.72
... More
Laying of UPVC Pipe line area in ward no.14 Under 15th Finance Grants;Cutting CC road surface including stacking of excavated materials for pipe line trench work.
10.12
2664
26975.73
... More
Laying of UPVC Pipe line area in ward no.14 Under 15th Finance Grants;Item Detailed Specification Description
-
-
-