For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Municipality Tender
Civil And Construction
Opening Date29 Jan 2025
Closing Date3 Feb 2025
Tender Amount₹ 8,31,555
Costs
EMD
₹ 8,316Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
572917Tender No
E2/2741/2024-253Tender Authority
Municipality ViewPurchaser Address
-Website
http://tender.telangana.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Repairs;TBSP-H.I-03: Providing 110 mm Dia ISI marked P.V.C.down water take pipes 2.5mm thick 4kg/sq.cm pressure of ISI marked including cost of necessary PVC Bends, shoes, iron / PVC clamps and all other accessories and fixing in position including cost and conveyance of all materials, sales & other taxes on materials to site, operational & incidental charges including all labour charges for fixing at site etc., complete for finished item of work. (APSS No. 1328) 110mm dia
6
370
2225.7
... More
Repairs;TBSP-A.I-01: Supplying, laying, jointing and testing 101.6 mm SWG SP-1 pipes of ISI make conforming to ISI 651 & 4127 with airtight cement joints in CM 1.5:1 prop. Including excavation of trenches and socket pits in any soil (except rock requiring blasting) up to 1524 mm (5'0") depth and refilling with watering and tamping.
10
651
6510.1
... More
Repairs;TBSP-F.I-01: S&F of 15 mm brass body CP finish bib tap of not less than 300 grams weight screw type (full turn) with internal / external threaded connection conforming to IS 8931 250 grams (short) -in & toilets
12
296
3558.48
... More
Repairs;Supplying & Fixing 76.20mm (3") CI Nahany trap 1st quality with CP grating, black painted for all floors including cost and conveyance of all materials to site, labour charges etc., complete for finished item of work. Toilets
11
113
1249.82
... More
Repairs;TBSP-A.I-09: Supplying & fixing 150 mm x 100 mm SWG gully traps conforming to ISI 651 & 4127 with C.I Grating & Cost. Brick masonry in CM 1:6 prop. Intermediate chamber and fitted with 304.8 mm x 288.6mm (12"x9") C.I Frame and hinged cover for sewer connections
4
820
3281.2
... More
Repairs;TBSP-E.II-02: Supply & fixing white glazed European water closet with variety as approved by Engineer-in-charge, P" or S" trap with 4" CI outlet pipe of approved make, plastic seat and lid for EWC and rubber buffers as per ISI 2548 1963 with and low down porcelain flushing tank with lid 10 Lit Capacity with internal components and fixed with wooden gutties with required size nails, 32mm dia short CP bend, 15 mm PVC connections with brass union nuts and 12.70 mm (1/2")NP stop cock heavy duty (300 grams), complete including cost and conveyance of all materials to site, for finished item of work for all floors.European for Toilet
1
7836
7836.03
... More
Repairs;TBSP-E.I-01: Providing and fixing 23" (584.2mm) long white glazed Indian WC Orissa pan of parry/Neycer/HSW make with P or S trap with brick masonry seat, CC squatting plate and 10 lit capacity PVC slimline low level flush tank of approved make with internal components and fixed with wooden gutties as approved by Engineer-in-charge with required size nails, 15mm PVC connections 31.75 mm brass plumber union nuts, 32mm dia long CP bend and 12.70 mm (1/2")NP stop cock, heavy duty (300 grams), P trap or S trap of Indian W.C. shall be encased on CC (1:2:4) 6? alround well above the joint to stop leakage at the joint etc., complete including cost and conveyance of all materials to site, cost of CC bed, labour charges etc., complete for finished item of work.WC for Toilet
2
7092
14185.96
... More
Repairs;ELEC-7.16.7: Providing independent earthing for Important equipment with 40mm dia 'B' class 2.5m long G.I pipe and 19mm dia 'B' class G.I pipe of 0.3mtr. long connected with reducer providing G.I funnel with mesh enclosed in C.C/ brick massonry chamber of 450m x 450m x 400mm with R.C.C. Slab cover duly providing staggered holes filling with 20Kg Salt and 40Kg Charcoal or 40Kg bentonite powder from the bottom of the pipe giving earth connection from electrode through G.I strip of 40 x 6mm x 200mm length with all accessories and labour charges complete, as per IS specifications 732/1982 (Part II) for block
1
5836
5836
... More
Repairs;BLD-ELEC-6-1-2 : Supply and Run of 2 of 6 Sq.mm WPSC Aluminium cable along with No.10 SWG G.I bearer wire through PVC cleats with all accessories including labour charges etc., complete for service mains.From Pole to Block
90
66
6012
... More
Repairs;BLD-ELEC-3.1.4 : Supply and run of 2 of 36/0.3mm (2.5 Sq.mm) F.R P.V.C. insulated flexible copper cable in existing pipe for mains inlcuding all labour charges etc., complete.for
18
93
1690.2
... More
Repairs;BLD-ELEC -3.1.2 : Supply and run of 1 of 14 /0.3mm (1.0 Sq.mm) FR P.V.C. insulated flexible copper cable in existing pipe for earth continuity including all labour charges etc., complete. 6A 3 pin wall plug socket with 6A switch add extra
33
24
798.6
... More
Repairs;BLD-ELEC-2-1-4 : Supply and fixing of 6A 3 pin wall plug socket with 6A switch control on a common switch board with earth continuity including wire leads, earth connections along with all labour charges etc., complete.
1
143
143.87
... More
Repairs;BLD-ELEC-2-1-3: Wiring with 2 of 14/0.3mm (1.0 Sq.mm) P.V.C. insulated F.R. flexible copper cable (ISI MARK) in existing pipe with 6A switch control and 3/2 pin sockets fixing on separate board including all labour charges etc., complete Wall mounted lights/ tube lights
4
341
1367.48
... More
Repairs;BLD-ELEC-2.1.7 : Supply and fixing of CFL holder in lieu of ceiling rose of light point complete with all connections and all labour charges with 18W CFL Lamp (for new installation).Wall mounted lights/ tube lights Add extra
6
199
1198.8
... More
Repairs;BLD-ELEC-1-4.1 (b) : Supply and Fixing of 20mm dia 1.5mm thick P.V.C. pipe (ISI MARK) concealed in wall with all required accessories including masonary work for light, fan and separate plug point with well seasoned wooden deep box including all labour charges etc., complete.Wall Add extra for wastage at 15%
22
87
1932.48
... More
Repairs;BLD-ELEC-1-4.2 (c) : Supply and Fixing of 25mm dia 2mm thick PVC pipe (ISI MARK) concealed in Roof Slabs with all required accessories including masonary work and labour charges etc., complete.for Circuite wiring for Switch board to all rooms in GF In Roof Slab along the length Add extra 10%
24.2
88
2143.15
... More
Repairs;Supplying and fixing of MS Grill for Ventilator using 25mm x 6mm MS flat alround and 10mm MS square bars horizontally at 125mm centre to centre and vertically at 30cm centre to centre including fixing with 4 Nos of MS Z holdfasts (2 on each side) duly making cutting brick masonry, fixing and making to original surface neatly and painting grill with one coat of red oxide primer including and conveyance of all materials ,cutting, bending, welding including all operational charges and all labour charges etc., complete for finished item of work. Ventilator Per 1sqm -15.78 Kg
0.81
118
95.71
... More
Repairs;TBSC-L.III-32-Supply and fixing of Bath/Toilet Door frame and shutter with 8mm Bison Lam(IS.15786) using with 50mmx35mmx1.3mm thick aluminium door frame of weight 220grm per Rft with a rebate of 30 mm for provision for shutter, shutter made with 45mmx25mmx1.3mm thick aluminium section of weight 210grms per Rft with 8mm groove to accommodate 8mm thick Bison lam(IS.15786) and shutter having 3nos of ss 304gr Butt hinges of 100mm long, 100mm aluminium handles -2nos, and also 2 nos of 200mmx12mm aluminium Aldrops ,the rates inclusive of all labor fixing at site and 50microns Ivory powder coated for aluminium door frame and shutter sections etc complete finished item of work .Doors
6.3
5867
36962.6
... More
Repairs;BLD-CSTN-4-1-(34) : Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) / Mild steel (MS) steel bars (Fe 415/ Fe 500 grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc., complete for finished item of work in all floors.( APSS No.126) 125mm Thick Slabs
366.8
77
28353.64
... More
Repairs;Observed data with BLD-CSTN-12-11 -(187): Painting to new walls with 2 coats of acrylic emulsion paint of approved brand and shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 911 for External walls
182.83
114
20862.73
... More
Repairs;Observed data with BLD-CSTN-12-11 -(187):Painting to new walls with 2 coats of acrylic emulsion paint of approved brand and shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 911 for Internal walls Qty as per ceiling & inner plastering
22.23
112
2511.77
... More
Repairs;BLD-CSTN-11-5-(162) : White washing two coats with whiting of approved quality to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work, but excluding conveyance charges of materials Whole Building (quantity asper Internal, External & Ceiling plastering)
205.06
46
9465.57
... More
Repairs;BLD-CSTN-8-1-(76) : Plastering with 12mm thick in single coat in CM (1:3) finished smooth including cost and conveyance of all materials to site, on all materials, finishing, curing, scaffolding and all operational, incidental, labour charges etc., including cutting grooves where ever necessary etc., complete for finished item of work. (As per SS 903). (only for Ceiling) Ceiling
22.23
216
4810.13
... More
Repairs;BLD-CSTN-8-2-(77) : Plastering with 12mm thick in single coat in CM (1:4) finished smooth including cost and conveyance of all materials to site, on all materials, finishing, curing, scaffolding and all operational, incidental, labour charges etc., including cutting grooves where ever necessary etc., complete for finished item of work. (As per SS 903)Inner walls Vertical Walls Partition Walls Horizontal Walls Vertical Walls Parapet Wall Horizontal Walls Parapet Wall Urinals Doors(DI) Vehtilator (V)
90.73
205
18667.7
... More
Repairs;BLD-CSTN-8-7-(82) : Plastering with 20mm thick in single coat in CM (1:4) finished smooth including cost and conveyance of all materials to site, finishing, curing, scaffolding and all operational, incidental, labour charges etc., including cutting grooves where ever necessary etc., complete for finished item of work. (As per SS 903). Outer walls Horizontal Walls Vertical Walls Parapet Wall Deductions Ventilator (V) Steps 1st step (Sides) 2nd step (Sides) 3rd step(Sides) Raisers Theread
92.1
310
28574.95
... More
Repairs;BLD-CSTN-5-4-(42): Brick Masonary 2nd Class Ground moulded or treditional size 23x11x7 Cm in Cement Mortor 1:6 Prop including Cost & conveyance of all Materials like Cement, Sand, Bricks, Water, etc., to site cost of, on all materials, including all labour charges like mixing Cement Mortor, scaffoding charges lift charges, curing charges etc., complete for finished item of work Horizontal Walls Vertical Walls Outer Steps 1st step 2nd step 3rd step Deductions of Opening Doors Ventilator (V)
19.48
8182
159392.96
... More
Repairs;BLD-CSTN-3-16-(31)-C : Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work for RCC SLABS, BEAMS Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the defference in cost shall be deducted. For Exisitng Masjid Slab
9.17
12978
119016.51
... More
Repairs;Providing Waterproofing Treatment by appling of Dr. Fixit URFlot equivalent, Initially cleaning the RCC surface neatly and Cleaning neatly with water, applying 2 coats of Dr. Fixit with cement (1:1) propotions like lit of URP 8 mixed with One Kg of cement including cost of all materials, conveyance charges of all materials and including all operational, incidental and labour charges etc., complete for finished item of work
138.78
867
120458.26
... More
Repairs;Amendment 2021-22 BLD-CSTN-2-8 (16) : Filling with Gravel in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310) floor area
7.34
455
3346.67
... More
Repairs;Plain Cement concrete (1:3:6) using 20 mm HBG graded metal machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including seigniorage charges, sales & other taxes on all materials and including all charges for machine mixing, Centering and laying concrete in under bed and side walls, compacted by vibration including curing for 14 days complete but excluding cost of steel and its fabrication charges for finished item of work as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH. RBR-FNDN-4 For Retaining wall
15.39
6791
104519.03
... More
Repairs;BLD-CSTN-6-6-(61) : Construction of CRS Masonary 2nd Sort in Cement Mortor ( 1:6 ) Prop using hard granite stone including cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones, including, on all Materials, labour charges for cutting Stones to required size and shape, mixing of Cement Mortor, Construction, Scaffolding Charges curing etc., complete for finished item of Work Above Ground level Toilet - Horizontal Long walls Toilet - Horizontal Short walls Toilet - Vertical Long walls Toilet - Vertical Short walls
5.95
5601
33329.7
... More
Repairs;BLD-CSTN-6-13-(68) : Construction of RR Masonary in Cement Mortor (1:8) Prop using hard granite stone including cost & Conveyance of all materials like Cement, Sand, Water, Granite Stones, including labour charges for cutting Stones to required size and shape, mixing of Cement Mortor, Construction, Scaffolding Charges curing etc., complete for finished item of Work . Below Ground Level Toilet - Horizontal Long walls Toilet - Horizontal Short walls Toilet - Vertical Long walls Toilet - Vertical Short walls
4.62
5070
23427.65
... More
Repairs;BLD-CSTN-3-7-(24) Using Concrete mixture all works up to Plinth Level: Plain Cement concrete nominal mix (1:5:10) prop (Cement : fine aggregate: coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site, on all materials, labour charges, for mixing, laying, concrete, ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed. for Flooring Bed Toilet Urinals
5.37
5483
29446.45
... More
Repairs;BLD-CSTN-2-7 - (15) ; Earth work excavation in Hard rock (blasting prohibited)-Upto 3 m depth for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work including seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308). in Hard rocky soils
3.5
2202
7708.64
... More
Repairs;BLD-CSTN-2-1 (9): Earth work excavation in Ordinary Soil by Manual Means-Upto 3 m depth for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring, sheeting, planking, strutting, etc. complete for finished item of work including seigniorage excluding dewatering charges etc as per SS-20 B (APSS 308). in all types of soils for footings
13.99
258
3610.26