For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Municipality Tender

Works
Civil And Construction
Drainage Work
Opening Date19 Sep 2023
Closing Date26 Sep 2023
Tender Amount₹ 1,53,438 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
CC Drain and Drilling of Bore;Drilling of borewells by down hole hammer (DTH) drilling to finished dia of 163mm(61/2" dia) in all formations to the depth specified and reaming the bore to the required dia to suit lowering (insertion) of 175mm intenal dia casing pipe with couplings , lowering , fixing of transportation from point to point, crew charges, consumbles, shifting of rig and all other charges etc., in all over the district. The bore wells should be true & vertical and work should be carried out to the satisfaction of the department and carried out as per IS-2800 part-1/1979 and amendments if any from time to time and fixing of casing pipe and supply and fixing of Well Cap- Above 61 m

30

439

13170

... More
CC Drain and Drilling of Bore;Drilling of borewells by down hole hammer (DTH) drilling to finished dia of 163mm(61/2" dia) in all formations to the depth specified and reaming the bore to the required dia to suit lowering (insertion) of 175mm intenal dia casing pipe with couplings , lowering , fixing of transportation from point to point, crew charges, consumbles, shifting of rig and all other charges etc., in all over the district. The bore wells should be true & vertical and work should be carried out to the satisfaction of the department and carried out as per IS-2800 part-1/1979 and amendments if any from time to time and fixing of casing pipe and supply and fixing of Well Cap-Up to 61 m

61

439

26779

... More
CC Drain and Drilling of Bore;Carting of excavated Earth up to an initial lead of 5 KM including including loading ,unloading but excludding stacking charges etc., Comp.

4.37

72

317

... More
CC Drain and Drilling of Bore;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, but excluding centering, shuttering.

1.44

10916

15719

... More
CC Drain and Drilling of Bore;Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and technical specifications for Bars below 36 mm dia including over laps and wastage, where they are not welded BLD-CSTN-2-18

144

86

12521

... More
CC Drain and Drilling of Bore;VCC nominal mix (1:2:4) prop. ( cement : fine aggregate : coarse aggregate) using 20 mm size HBG crushed metal including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc.,to site seniorage charges on all materials, labour charges for mixing, laying concrete,raming in 15 cm layers finishing top surface to the required level curing etc., complete for finished item of work.(Bottom bed & Haunch Portion)

0.21

5700

1197

... More
CC Drain and Drilling of Bore;VCC nominal mix (1:2:4) prop. ( cement : fine aggregate : coarse aggregate) using 20 mm size HBG crushed metal including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc.,to site seniorage charges on all materials, labour charges for mixing, laying concrete,raming in 15 cm layers finishing top surface to the required level curing etc., complete for finished item of work.(Drain walls)

1.45

9326

13514

... More
CC Drain and Drilling of Bore;Plain Cement Concrete (1:4:8) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 40mm size HBG (SS5) metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, all operational, incidental, and labor charges such as mixing, laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete, etc.,using concrete mixer complete for finished item of work for Foundations and Flooring Bed (APSS No. 402)

0.84

4591

3857

... More
CC Drain and Drilling of Bore;Collection, Supply and Filling with Stone dust of 2.36 mm & below in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

0.84

1165

979

... More
CC Drain and Drilling of Bore;Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work including seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308).Any Soil Upto 3 m depth

1.09

270

295

... More
CC Drain and Drilling of Bore;Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work including seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308).Any Soil Upto 3 m depth

4.37

127

556



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.