For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
₹ 37,955Document Cost
Refer DocumentsTender Fee
₹ 2,000
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
585945Tender No
MCN/ME/E1/04/2024-25Tender Authority
Municipality ViewPurchaser Address
-Website
http://tender.telangana.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
infrastructural developments;Engaging of Labours/Mazdoor for attending emergency works of Sanitation or Water Supply utilities etc., as directed by the Engineer inc charge ., ( including Municipal Area Allowance @ 20%) (as per SSR 2024-25)
50
575
28750
... More
infrastructural developments;Hiring of Tipper Tipper- 5.5 Cum for shifintg dismantled material ( including CP @ 13.615%) (as per SSR 2024-25)
6
1454
8728.38
... More
infrastructural developments;Hiring of Tractor ( including CP @ 13.615%) (as per SSR 2024-25)
4
581
2326.84
... More
infrastructural developments;Hiring of Dozer( D 50 ) ( including CP @ 13.615%) (as per SSR 2024-25)
9
2197
19775.79
... More
infrastructural developments;Hiring of Front end loader ( including CP @ 13.615%) (as per SSR 2024-25)
7
2304
16128.77
... More
infrastructural developments;Hiring of Hydraulic Excavator more than 110 HP capacity including Crew & Fuel charges ( including CP @ 13.615%) (as per SSR 2024-25)
5
4042
20210.4
... More
infrastructural developments;Manufacture, Supply and Delivery of R.C.C. Socket and Spigot pipes conforming to B.I.S. 458/2003 at ex-factory (rate per pipe) Excluding transportation ,taxes & duties for NP3 Class pipes
20
6521
130433.4
... More
infrastructural developments;Manufacture, Supply and Delivery of R.C.C. Socket and Spigot pipes conforming to B.I.S. 458/2003 at ex-factory (rate per pipe) Excluding transportation ,taxes & duties for NP3 Class pipes
12
4108
49297.8
... More
infrastructural developments;Vibrated reinforced cement concrete of M30 grade using 20mm & 10mm HBG crushed stone aggregate including cost and seignorage, conveyance of all materials and labour charges centring, machine mixing, laying, vibrating, curing etc., including other incidental hire and operatioal charges of all T&P as per approved drawings and as directed during execution but excluding cost of steel and its fabrication charges for finished item of work.
4.24
5867
24876.59
... More
infrastructural developments;Supply and placing of M25 grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work.BLD-CSTN-2-14
15.3
13489
206384
... More
infrastructural developments;Supplying, fitting and placing HYSD bar reinforcement in foundation completed as per drawings and technical specification 1000 & 1202 MORD &1100 ,1600 MORTH for bars below 36mm dia including over laps and wastage, where they are not welded etc.
2719
77
210151.51
... More
infrastructural developments;Providing Vibrated Cement Concrete M15 Nominal Mix ( 1:2:4 ) usng 20 mm metal size HBG crushed stone graded metal and fine aggregate conforming to table 1000-2 of MoRT&H including cost, seigniorage conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including all other incidental and operational charges of all T&P etc., complete for finished item of work as per MoRT&H specification 1500,1700, 2200 (4th Revision) and as directed by the Engineer-in-Charge for Side Wall
54.37
5746
312418.18
... More
infrastructural developments;Providing Vibrated Cement Concrete M15 Nominal Mix ( 1:2:4 ) usng 20 mm metal size HBG crushed stone graded metal and fine aggregate conforming to table 1000-2 of MoRT&H including cost, seigniorage conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including all other incidental and operational charges of all T&P etc., complete for finished item of work as per MoRT&H specification 1500,1700, 2200 (4th Revision) and as directed by the Engineer-in-Charge for Side Wall
4.73
5525
26133.91
... More
infrastructural developments;Providing Vibrated Cement Concrete (1:5:10) mix using 40mm size HBG crushed stone aggregate and fine aggregate conforming to table 1000-2 of MoRT&H excluding cost, seigniorage and including conveyance of all materials to site and labour charges, centering, machine mixing, laying, Vibrating, curing etc., including all other incidental and operational charges of all T&P etc., complete for finished item of work as per MoRT&H specification 1500,1700, 2100 (4th Revision) and as directed by the Engineer-in-Charge
33.23
4465
148394.88
... More
infrastructural developments;Filling(Quarry Rubbish) in foundation trenches as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH (RBR-FNDN-2)
22.16
460
10209.11
... More
infrastructural developments;Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and brancing, removal of stumps and other deleterious material and desposal upto a lead of 50 m, dressing of sides and bottom and backifilling in trenches with eccavaed suitable material as per Technical Specification 305 MORD / 304 MORTH.
188.32
285
53739
... More
infrastructural developments;Saw cut joints for freshly paid concrete pavement including all materials and labour charges.
248.8
99
24875.02
... More
infrastructural developments;Curing compound, including spraying at 0.25 Ltr/Sqm
1244
44
55469.96
... More
infrastructural developments;Vaccum drying of freshly laid cement concret floor using 100% air tight suction mat of suitable size and length, vaccum pump to maintain vaccum pressure 0.70-0.80 atmospheres as per the standard procedure floating with power floater, mechanical, trawelling, finishing wit sound edges and corners, including hire and operational charges of mechinery, labour fuel etc., complete for finished item of work as directed by Engineer in Charge of the work.
1244
85
106001.24
... More
infrastructural developments;Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prpared sub base, with 43 grade cement or any other type as per clause 1501.2.2 - M30 (Grade), coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick plythene film wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridges / culvert and construction joints admixtures as approved, curing of concrete slabs for 14-days, curing compound (where spcified) and water finishing to lines and grade as per drawing and Technical specification clause 1501 MORD.
186.6
6535
1219447.79
... More
infrastructural developments;RBR-CCPV-13 - ii: Providing and Laying of Interlocking Concrete Block Pavements using CC M30 having thickness 60 mm as per drawing and Technical Specification Clause 1504 MORD
45
561
25249.05
... More
infrastructural developments;Providing Vibrated Cement Concrete (1:5:10) mix using 40mm size HBG crushed stone aggregate and fine aggregate conforming to table 1000-2 of MoRT&H excluding cost, seigniorage and including conveyance of all materials to site and labour charges, centering, machine mixing, laying, Vibrating, curing etc., including all other incidental and operational charges of all T&P etc., complete for finished item of work as per MoRT&H specification 1500,1700, 2100 (4th Revision) and as directed by the Engineer-in-Charge for base coarse below CC Pavement.
36.61
4465
163488.91
... More
infrastructural developments;Providing, laying, spreading and compacting graded stone aggregates to Wet Mix Macadam specification including cost & conveyance of all material, hire and operational charges of T&P, labour charges for all operations, premixing the material with water at OMC in mechanical mix plant, carriage of material by tipper to site, laying in uniform layers with paver finisher in subbase/ base course on well prepared surface and compacting with vibratory roller to achieve the desired density, including lighting, grading, barricading and maintenance of diversion of trafic, etc., complete for finished item of work, as per table 400.13 of technical specification clause 406 MORTH(5th Revision). excluding GST & Seignoriage Charges
90.53
2007
181722.68
... More
infrastructural developments;Cutting road surface including stacking of excavated materials for pipe line trench work. ( including CP @ 13.615%) (as per SSR 2024-25)
1.8
1280
2304.79
... More
infrastructural developments;Cutting road surface including stacking of excavated materials for pipe line trench work. ( including CP @ 13.615%) (as per SSR 2024-25)
9
2664
23978.43
... More
infrastructural developments;Supply and spread of Gravel Road formation including cost seignorage charges and including conveyance of all material to work site and spreading in uniform layers by approved means on prepared surface and compacting with vibrated roller to achieve the desired density at OMC etc., complete for finished item of work as per Morth specification and as directed by the Engineer-in-Charge
495
637
315620.91
... More
infrastructural developments;Excavation for Hard Rock (blasting prohibited) -Mechanical Means-Upto 3 m depth. For foundation - Open Excavation
3.9
1607
6270.81
... More
infrastructural developments;Earthwork excavation for Roads as per drawing, technical specification clause 305.1 including setting out, construction of shooting and bracing removal of slums and other deleterious material and disposal upto a lead of 50 m dressing of site as per Technical Specification 305 MORD / 304 MORTH
228
305
69708.72