Municipality Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Municipality Tender
Civil And Construction
Excavation
Opening Date5 Jan 2024
Closing Date12 Jan 2024
Tender Amount₹ 15,89,263
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
489370Bid Award Id
ViewTender No
TKJL/E/18/69WORKS/2023-24Tender Authority
Municipality ViewPurchaser Address
-Website
http://tender.telangana.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Laying of SWD;Construction of sewer circular conical manhole as per type design using flyash Bricks of size 225 x 10 x 6 cms having minimum Crushing strength 75 Kgs Per Sqm as per IS:12894-1990 - CLASS - 7.5 using Sulphete resisting cement in CM (1:3) prop; including CC (1:4:8) bed for foundation and of M15 (1:2.5:5) prop. using 20mm HG metal for benching and channels, inside plastering with 20mm thick using Sulphete resisting cement in CM (1:3) prop; and outside plastering with 20mm thick using OPC in CM (1:3) prop; the foundation concrete in CC (1:4:8) prop. using 40mm nominal size hard broken granite stone and supporting incoming pipes with concrete block / masonary wherever necessary including finishing the gap with CM (1:3) prop. on both the sides including excavating pits upto required depth in all types of soils and supply and fixing of 560mm dia manhole frame and cover (HD-20) and PVC encapsulated steps including cost & conveyance of all material, labour and all other incidental and operational charges etc., complete.
24
12897
309546.96
... More
Laying of SWD;PHE-LJSW-13: Supply, Lowering and laying in ready made trench true to alignment and gradient, jointing, and testing of stone ware pipes including cost of jointing material such as cement mortar (1:1) proportion and Spun yarn including cost and conveyance of pipe. (Reference to specifications BIS No. 6530/72) 300mm dia
400
2260
904100
... More
Laying of SWD;RBR-FNDN-1- (i-A) In ordinary soils, by Mechanical means: Earthwork excavation in all kinds of soil for Pipe line trenches as per drawings and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material , dressing of sides and bottom as per Technical Specification 304 MORTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for laying sewer/water lines including divertion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete for Pipe Lines by mechanical means.
400
127
50876
... More
Laying of SWD;BLD-CSTN-2-7 - (15) ; Earth work excavation in Hard rock (blasting prohibited)-Upto 3 m depth for pipeline trench and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work including seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308).
68.85
2268
156169.7
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements