For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Municipal Corporation - GWMC Tender
Civil And Construction
Civil Works Others
Opening Date5 May 2025
Closing Soon12 May 2025
Tender Amount₹ 1,43,20,797
Costs
EMD
₹ 1,43,208Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
593952Tender No
05/SE/GWMC/CTN 02/e-procurement/2025-26, Dated:- 30-04-2025Tender Authority
Municipal Corporation ViewPurchaser Address
-Website
http://https://gwmc.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Package (A) Construction of compound wall at Padmashali Community Hall, Beside Kakatiya Canal, Err;Plain Cement concrete (1:5:10) using 40 mm metal with Concrete mixture. All work upto plinth level including cost and conveyance of all labour and materials charges etc., complete for finished item of work
41.87
5055
211666.67
... More
Package (A) Construction of compound wall at Padmashali Community Hall, Beside Kakatiya Canal, Err;Masonary 2nd Class Ground moulded or treditional size 23x11x7 Cm in Cement Mortor 1:6 Prop including Cost & conveyance of all Materials like Cement, Sand, Bricks, Water, etc., to site cost of charges on all materials, including all etc., Complete
197
8534
1681199.97
... More
Package (A) Construction of compound wall at Padmashali Community Hall, Beside Kakatiya Canal, Err;Supply and placing of the M-20 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site . sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering and suttering charges etc.,complete but excluding seignorage charges, cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code for PLINTH,PEDESTALS and FOOTINGS.Note :1) The cement content is adopted as350Kg/cum for estimating purpose only.Theexact quantities will be as per mix design. 2) As per mix design, if the cement
1
-
-
... More
Package (A) Construction of compound wall at Padmashali Community Hall, Beside Kakatiya Canal, Err;Plastering 12mm thick sigle coats with base coat of finishing including cost & conveyance of all materials like cement, Sand , Water, etc., to site, charges, all operational, including charges, labour charges for mixing mortar, finishing, scaffolding, lift charges, curing , including cutting grooves where ever necessary etc., complete for finished item of work of uneven surfaces of walls. (External
1876
219
411331.76
... More
Package (A) Construction of compound wall at Padmashali Community Hall, Beside Kakatiya Canal, Err;Construction of RR Masonary in Cement Mortor ( 1:8 ) Prop using hard granite stone including cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones, including Charges on all Materials, ,labour charges for cutting Stones to required size and shape, mixing of Cement Mortor ,Construction, Scaffolding Charges curing etc., complete for finished item of Work .
321.19
4890
1570731.52
... More
Package (A) Construction of compound wall at Padmashali Community Hall, Beside Kakatiya Canal, Err;Construction of Retaining Wall
1
-
-
... More
Package (A) Construction of compound wall at Padmashali Community Hall, Beside Kakatiya Canal, Err;Filling with dust in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work.
41.87
686
28748.78
... More
Package (A) Construction of compound wall at Padmashali Community Hall, Beside Kakatiya Canal, Err;PCC (1:2:4) prop using ,20 mm and 10mm Walls Including coat of all materials like cement, coarse aggregate, fine aggregate and water etc., to site and Labour charges for machine mixing, layin concrete in position, vibrating and curing etc., including all incidental charges and operational charges etc., completed.
456
5215
2378459.52
... More
Package (A) Construction of compound wall at Padmashali Community Hall, Beside Kakatiya Canal, Err;Construction of compound wall
1
-
-
... More
Package (A) Construction of compound wall at Padmashali Community Hall, Beside Kakatiya Canal, Err;For Columns
38.88
14142
549876.34
... More
Package (A) Construction of compound wall at Padmashali Community Hall, Beside Kakatiya Canal, Err;Footing
60.75
9947
604336.14
... More
Package (A) Construction of compound wall at Padmashali Community Hall, Beside Kakatiya Canal, Err;Plain Cement concrete (1:4:8) using 40 mm metal with Concrete mixture. All work upto plinth level including cost and conveyance of all labour and materials charges etc., complete for finished item of work
64.85
5422
351669.88
... More
Package (A) Construction of compound wall at Padmashali Community Hall, Beside Kakatiya Canal, Err;Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) Fe 500 grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc., complete for finished item of
4000
76
304480
... More
Package (A) Construction of compound wall at Padmashali Community Hall, Beside Kakatiya Canal, Err;Earth work excavation in Ordinary Soil by Manual Means-Upto 3 m depth for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work including excluding dewatering charges etc as per SS - 20 B (APSS 308). for FOUNDATIONS
360.37
297
107119.98
... More
Package (A) Construction of compound wall at Padmashali Community Hall, Beside Kakatiya Canal, Err;Supply and placing of the M-20 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site. sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering and suttering charges etc.,complete but excluding seignorage charges, cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code for PLINTH,PEDESTALS and FOOTINGS.Note :1) The cement content is adopted as350Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement
1
-
-
... More
Package (A) Construction of compound wall at Padmashali Community Hall, Beside Kakatiya Canal, Err;Footing
35.02
9947
348376.16
... More
Package (A) Construction of compound wall at Padmashali Community Hall, Beside Kakatiya Canal, Err;Construction of Gravel base including cost, and conveyance of all materials to work site and spreading in uniform layers by approved means, on prepared surface and mpacting with three wheel 80-100 kN static roller / Vibratory Roller 80-100 kN to achieve the desired density at OMC etc., complete for finished item of work as per MoRT&H Specification 401& 408 (5th revision) and as directed by the Engineer- in-charge. ( Payment will be made based on levels for finished item of work )..( for filling low level area)
912
714
651396
... More
Package (A) Construction of compound wall at Padmashali Community Hall, Beside Kakatiya Canal, Err;Filling with Sand in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work.
64.85
2808
182142.25
... More
Package (A) Construction of compound wall at Padmashali Community Hall, Beside Kakatiya Canal, Err;Plinth beam
16.01
13260
212303.01
... More
Package (A) Construction of compound wall at Padmashali Community Hall, Beside Kakatiya Canal, Err;Earth work excavation in Ordinary Soil by Manual Means-Upto 3 m depth for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work including excluding dewatering charges etc as per SS - 20 B (APSS 308). for FOUNDATIONS
368.27
297
109468.26
... More
Package (A) Construction of compound wall at Padmashali Community Hall, Beside Kakatiya Canal, Err;Raft
377
6388
2408479.58
... More
Package (A) Construction of compound wall at Padmashali Community Hall, Beside Kakatiya Canal, Err;Coloumns
33.73
14142
477040.02
... More
Package (A) Construction of compound wall at Padmashali Community Hall, Beside Kakatiya Canal, Err;Pedestal
19.44
10715
208318.26
... More
Package (A) Construction of compound wall at Padmashali Community Hall, Beside Kakatiya Canal, Err;Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) Fe 500 grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc., complete for finished item of
6367.8
76
484716.94
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%