Municipal Corporation Tender
... More
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Municipal Corporation - GHMC Tender
Civil And Construction
Drainage Work
Opening Date5 Mar 2025
Closing Date12 Mar 2025
Tender Amount₹ 40,13,778
Costs
EMD
₹ 40,138Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
579656Tender No
50/EE/CIR-20/SLPZ/GHMC/1-15/2024-25 Dt:03.03.2025Tender Authority
Municipal Corporation ViewPurchaser Address
-Website
http://https://www.ghmc.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Construction of Storm water drain;Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202 MORD & 1100, 1600 MORTH for Bars below 36 mm dia including over laps and wastage, where they are not welded.
17688
66
1183504
... More
Construction of Storm water drain;Supply and placing of RCC M30 as per IS-4926:2003 of following grades with minimum cement content as per IS-456:2000 and Standard mix design as per IS-10262:1982, with coarse aggregate of nominal size 20mm and fine aggregate of Zone II as per the mix design approved by the Department from Standard suppliers including cost and conveyance, vertical pumping and Horizontal pumping on all materials, etc., works for basic cost including leveling, grading, spreading, curing for 14 days, centering, vibrating, compacting, finishing etc., as required including, material taxes, pumping, transportation, approved admixture etc., complete. Note: 1.Manufactured Sand (Rock sand) and natural river sand in the ratio of 50:50 shall be used.2. The quantities for cement, coarse aggregates and fine aggregates are for estimating purpose only. The exact quantities will be as per mix design..(Slab)
56.28
8268
465325
... More
Construction of Storm water drain;Supply and placing of RCC M30 as per IS-4926:2003 of following grades with minimum cement content as per IS-456:2000 and Standard mix design as per IS-10262:1982, with coarse aggregate of nominal size 20mm and fine aggregate of Zone II as per the mix design approved by the Department from Standard suppliers including cost and conveyance, vertical pumping and Horizontal pumping on all materials, etc., works for basic cost including leveling, grading, spreading, curing for 14 days, centering, vibrating, compacting, finishing etc., as required including, material taxes, pumping, transportation, approved admixture etc., complete. Note: 1.Manufactured Sand (Rock sand) and natural river sand in the ratio of 50:50 shall be used.2. The quantities for cement, coarse aggregates and fine aggregates are for estimating purpose only. The exact quantities will be as per mix design.. (wall )
80.4
9120
733260
... More
Construction of Storm water drain;Supply and placing of RCC M30 as per IS-4926:2003 of following grades with minimum cement content as per IS-456:2000 and Standard mix design as per IS-10262:1982, with coarse aggregate of nominal size 20mm and fine aggregate of Zone II as per the mix design approved by the Department from Standard suppliers including cost and conveyance, vertical pumping and Horizontal pumping on all materials, etc., works for basic cost including leveling, grading, spreading, curing for 14 days, centering, vibrating, compacting, finishing etc., as required including, material taxes, pumping, transportation, approved admixture etc., complete. Note: 1.Manufactured Sand (Rock sand) and natural river sand in the ratio of 50:50 shall be used.2. The quantities for cement, coarse aggregates and fine aggregates are for estimating purpose only. The exact quantities will be as per mix design.. (Bottom )
84.42
5558
469238
... More
Construction of Storm water drain;Plain Cement Concrete 1:2:4 prop using Hard Granite Machine Crushed metal including Cost and Conveyance of all materials like Cement Sand Coarse Aggregate Water Etc., to Site on all materials, and Labour Charges , laying Concrete for foundation tamping, vibrating, lifting, curing, finishing top surface for benching, Kerbing, lintel & table drain, But Excluding Centering Shuttering Charges ,Seigniorage Charges cost of steel and fabrication charges Etc., Complete for finished item of Work
60.3
5980
360633
... More
Construction of Storm water drain;Construction of granular sub-base by providing well graded / Close Graded material, mixing in a mechanical mix plant at OMC, carriage of mixed material to work site upto lead of 1000 m spreading in uniform layers with motor grader on prepared surface and compacting with smooth/vibratory wheel roller 80-100 kN to achieve the desired density, complete as per Technical Specification Clause 401 MORD/MORTH
60.3
2188
131988
... More
Construction of Storm water drain;Carting away earth excavated with a lead of 15km including, loading but excluding stacking SSR conveyance charges.
663.3
291
193352
... More
Construction of Storm water drain;Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH
753.75
332
250931
... More
Construction of Storm water drain;Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause202 MORD / MORTH
60.3
1006
60665