Municipal Corporation Tender
... More
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
₹ 12,307Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
584769Tender No
32/EE/GHMC/DIV-21/2024-25 (Item No. 01) Dt: 22.03.2025Tender Authority
Municipal Corporation ViewPurchaser Address
-Website
http://https://www.ghmc.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Sumps and Harvesting pits;Supply and Transportation of -------------single phase ISI submersible motor pumpset suitable for 4" Bore well. Makes: Flowell / Waterman / Ellen / Kirlosker / Samudra (1.50 HP 21 Stage )
2
32000
64000
... More
Sumps and Harvesting pits;Manufacture as per BIS:12592 (Part 1&2) Supply & Delivery of manhole covers and frames with ISI marking anywhere in A.P., F.O.R. destination including, loading, un-loading & stacking at site but excluding central excise duty, sales tax, octroi and other Govt levies etc., as applicable. ISI mark ( HD 20 - 24 X 24)
4
2408
9632
... More
Sumps and Harvesting pits;Carting away earth excavated with a lead of 15.00 K.Ms including loading but excluding stacking SSR conveyance charges.
61.32
291
17874.78
... More
Sumps and Harvesting pits;Filling with useful available excavated earth (excluding rock) in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work.
246.64
41
10257.76
... More
Sumps and Harvesting pits;S&F of 15 mm brass body premium variety Chromium Plated finish bib tap with wall flange of not less than 500 grams weight with quarter turn spindle with either internal or external threaded connection conforming to IS 8931 and with 10 years warranty
15
938
14070
... More
Sumps and Harvesting pits;S&F premium make CPVC Pipes of 15.90mm OD Pipe
300
155
46500
... More
Sumps and Harvesting pits;Providing impervious coat to exposed RCC roof slab surface with CM(1:3), 20mm thick with 1kg of water proof compound per bag of cement laid over roof when it is green including cost of all materials, seigniorage charges, excluding conveyance charges of materials and including all operational, incidental and labour charges for mixing mortar, laying, rendering smooth and thread lining, curing, rounding off junctions of wall and slab etc,, complete for finished item of work
20
698
13964.2
... More
Sumps and Harvesting pits;Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202 MORD & 1100, 1600 MORTH for Bars below 36 mm dia including over laps and wastage, where they are not welded.
4332
73
317708.88
... More
Sumps and Harvesting pits;Supply and placing of RCC M 30 as per IS-4926:2003 of following grades with minimum cement content as per IS-456:2000 and Standard mix design as per IS-10262:1982, with coarse aggregate of nominal size 20mm and fine aggregate of Zone II as per the mix design approved by the Department from Standard suppliers including cost and conveyance, vertical pumping and Horizontal pumping on all materials, etc., works for basic cost including leveling, grading, spreading, curing for 14 days, centring, vibrating, compacting, finishing etc., as required including, material taxes, pumping, transportation, approved admixture etc., complete. Note: 1.Manufactured Sand (Rock sand) and natural river sand in the ratio of 50:50 shall be used. 2. The quantities for cement, coarse aggregates and fine aggregates are for estimating purpose only. The exact quantities will be as per mix design SLAB-300MM
9.94
8472
84212.18
... More
Sumps and Harvesting pits;Supply and placing of RCC M 30 as per IS-4926:2003 of following grades with minimum cement content as per IS-456:2000 and Standard mix design as per IS-10262:1982, with coarse aggregate of nominal size 20mm and fine aggregate of Zone II as per the mix design approved by the Department from Standard suppliers including cost and conveyance, vertical pumping and Horizontal pumping on all materials, etc., works for basic cost including leveling, grading, spreading, curing for 14 days, centring, vibrating, compacting, finishing etc., as required including, material taxes, pumping, transportation, approved admixture etc., complete. Note: 1.Manufactured Sand (Rock sand) and natural river sand in the ratio of 50:50 shall be used. 2. The quantities for cement, coarse aggregates and fine aggregates are for estimating purpose only. The exact quantities will be as per mix design WALL-300MM
23.4
8191
191674.31
... More
Sumps and Harvesting pits;Supply and placing of RCC M 30 as per IS-4926:2003 of following grades with minimum cement content as per IS-456:2000 and Standard mix design as per IS-10262:1982, with coarse aggregate of nominal size 20mm and fine aggregate of Zone II as per the mix design approved by the Department from Standard suppliers including cost and conveyance, vertical pumping and Horizontal pumping on all materials, etc., works for basic cost including leveling, grading, spreading, , curing for 14 days, centring, vibrating, compacting, finishing etc., as required including, material taxes, pumping, transportation, approved admixture etc., complete. Note: 1.Manufactured Sand (Rock sand) and natural river sand in the ratio of 50:50 shall be used. 2. The quantities for cement, coarse aggregates and fine aggregates are for estimating purpose only. The exact quantities will be as per mix design RAFT -350MM
9.98
5751
57396.78
... More
Sumps and Harvesting pits;Plain Cement Concrete 1:5:10 prop using 40mm Hard Granite Machine Crushed metal including Cost and Conveyance of all materials like Cement Sand Coarse Aggregate Water Etc., to Site , and Labour Charges for mixing , laying Concrete for foundation tamping, vibrating, lifting, curing, finishing top surface for benching, Kerbing, lintel & table drain, But Excluding Centering Shuttering Charges cost of steel and fabrication charges Etc., Complete for finished item of Work. Excluding Cost of Seigniorage Charges on all materials
4.75
5458
25925.64
... More
Sumps and Harvesting pits;Filling with crusher stone dust finer than 3 mm with not more than 10% passing 0.075 sieve including supply and delivery of crusher stone dust finer than 3 mm for filling including cost of crusher stone dust and convenance charges ,filling charges watering tamping and rammiing and all labour charges and operational charges complete as directed by the departmental officer.
5.51
1173
6465.38
... More
Sumps and Harvesting pits;Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work including seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308).Ordinary soils-Manual Means-Upto 3 m depth08).
107.96
322
34861.36
... More
Sumps and Harvesting pits;Scoffolding charges including cost and covenyance and all material charges etc., complete.
2555.8
11
30209.56
... More
Sumps and Harvesting pits;Front Wall Painting of niche design, color contrast facilitated by the artist impression of best expression of shades for effective GRC design projection and Yoga pose contrast. Artistic paintings only for GRC and Front Wall background only.
2555.8
110
281138
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements