Municipal Corporation Tender
... More
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Municipal Corporation - GWMC Tender
Civil And Construction
Building Construction
Opening Date27 Mar 2025
Closing Soon7 Apr 2025
Tender Amount₹ 46,93,644
Costs
EMD
₹ 46,936Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
585191Tender No
01/SE/GWMC/CTN 11 Recall/e-procurement/2023-24, Dated:- 24-03-2025Tender Authority
Municipal Corporation ViewPurchaser Address
-Website
http://https://gwmc.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Construction of 2nd floor at SSK Seva Samaj in Division No. 26 (Old), New Div. No. 24;Columns
12.96
14643
189785.44
... More
Construction of 2nd floor at SSK Seva Samaj in Division No. 26 (Old), New Div. No. 24;Landing Flight 125 mm thick
15
1699
25494.29
... More
Construction of 2nd floor at SSK Seva Samaj in Division No. 26 (Old), New Div. No. 24;Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) Fe 500 grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc., complete for finished item of work in all floors.( APSS No.126)
1555.2
76
118770.62
... More
Construction of 2nd floor at SSK Seva Samaj in Division No. 26 (Old), New Div. No. 24;Brick Masonary 2nd Class Ground moulded or treditional size 23x11x7 Cm in Cement Mortor 1:6 Prop including Cost & conveyance of all Materials like Cement, Sand, Bricks, Water, etc., to site cost of charges on all materials, including all labour charges like mixing Cement Mortor, scaffoding charges lift charges , curing charges etc., complete for finished item of work
68.61
8498
583136.01
... More
Construction of 2nd floor at SSK Seva Samaj in Division No. 26 (Old), New Div. No. 24;Plastering 20mm thick two coats with base coat of 16mm thick in C.M. (1:6) and top coat of 4mm thick in C.M. (1:3) with dubara sponge finishing including cost & conveyance of all materials like cement, Sand , Water, etc., to site, charges, all operational, including charges, labour charges for mixing mortar, finishing, scaffolding, lift charges, curing , including cutting grooves where ever necessary etc., complete for finished item of work of uneven surfaces of walls. (External walls)
339.24
566
192226.95
... More
Construction of 2nd floor at SSK Seva Samaj in Division No. 26 (Old), New Div. No. 24;Plastering with 15mm thick in single coat in CM (1:4) finished smooth including cost and conveyance of all materials to site, charges on all materials, finishing, curing, scaffolding and all operational, incidental, labour charges etc., including cutting grooves where ever necessary etc., complete for finished item of work. (As per SS 903)
339.24
199
67647.85
... More
Construction of 2nd floor at SSK Seva Samaj in Division No. 26 (Old), New Div. No. 24;Flooring Supply of Double charged / multi charged stain free full body porcelain vitrified tiles with double layer pigment of size 1000 x 1000 mm and thickness between 12-15 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs and designswith vitrified tiles of 1st quality, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete, including, etc., complete for finished item of work
495.18
1323
655133.04
... More
Construction of 2nd floor at SSK Seva Samaj in Division No. 26 (Old), New Div. No. 24;Roofing with Pre-painted Galvanized Trapezoidal Profile Roofing sheets, fixing with G.I ?J? bolts & nuts 8 mm dia G.I plain washers complete including seigniorage charges etc., complete for finished item of work, but excluding the cost of purlins, rafters, trusses & cost of conveyance of all materials ? upto 600 pitch
495.18
1494
740130.69
... More
Construction of 2nd floor at SSK Seva Samaj in Division No. 26 (Old), New Div. No. 24;Supply and Fixing in position of MS steel works like Window Grills, Compound Wall Grills, Iron Doors, Windows etc, including cost and conveyance of all material , labour charges for fabrication and fixing in postion etc,. Complete
15730
133
2093191.1
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%