Municipal Corporation Tender

... More
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Municipal Corporation - GHMC Tender

Works
Paints and Enamels
Opening Date17 Jan 2025
Closing Date23 Jan 2025
Tender Amount₹ 5,36,300 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Renovation of Park;Laying and raimming of carpetgrass

445

58

25854.5

... More
Renovation of Park;Regualr watering and maintainanace of Lawn , removal of weeds and protection for 45 days

455

9

4499.95

... More
Renovation of Park;Digging the pits of size 0.45 x 0.45x 0.45 m refilling the pit with red soil including cost of red soil and farmyard manure 4: 1 ration , internal transportation of plants and planting the plants including inculding the application of fertilizers and pesticides ( @ 20 gms / pit/ sqmt etc complete but exculding the cost of fertilizers ( @ 20 gms /pit/ sqmt 0 and plants material

60

194

11644.2

... More
Renovation of Park;Digging the pits of size 0.30 x 0.30 x 0.30 m refilling the pit with red soil including cost of red soil and farmyard manure 4: 1 ration , internal transportation of plants and planting the plants including inculding the application of fertilizers and pesticides ( @ 20 gms / pit/ sqmt etc complete but exculding the cost of fertilizers ( @ 20 gms /pit/ sqmt 0 and plants material

700

56

39200

... More
Renovation of Park;Cost of Gravel including internal transportation , application and spredding complete =250*0.1*2.1 = 52.5

55

432

23789.7

... More
Renovation of Park;PRE CAST AAC KERBS PATH WAY Supply and Fixing of pre cast AAC Kerbs with size 600 mm x 375 mm x 110mm, semi bated at top in M30 grade including cost and conveyance to site and labour charges for laying true to allotment and pointing with cement mortor(1:3) prop etc. For planting of shrubbery in the Lawn

30

227

6810

... More
Renovation of Park;Add 18% GST

1

-

39500.03

... More
Renovation of Park;Maintenance of Lawn, Mannaual watering (4 Months) (1) Watering the lawns@10 liters / Sqm. / day basing on the season and weather conditions (sub soil moisture shall be maintained contionously). The watering shall be carried out DAILY during non rainy days. (2) Lawn mowing and edging of the lawns in the following frequency. Keeping the lawn grass blade not more than 2 cm. (i) June to November - once in 15 days (ii) December to May - once in 30 days. (3) Edging of the lawns in such a way that the lawn grass do not penetrate innto the plants and in a defined perfect geaometric shapes or smootha curves. (4) Keeping the lawns in lush green & weed - free condition. (5) Application of fertilizers, insecticides, Fungicides etc. (a) With manual watering. (b) With Drip / Sprinklers system. (4) Months

455

924

16818.8

... More
Renovation of Park;Maintenance of individual shrubs, rose plants, topiary, ornamental bamboo and palms etc i) Trimming once in 15 days.(ii)Watering once in a day @ 5 litres / per plant / per day (sub soil moisture shall be maintained continuously). The watering shall be carried out DAILY during non rainy days. (iii) Formation of basins for each and every plant upto 1 ft. away from the plant. (iv) Application of fertilizers, insecticides, Fungicides (@ 20 gms/pit/sqmt) etc.,(a)With Manual watering for 4 months

760

612

18623.34

... More
Renovation of Park;Add 18% GST

1

-

6379.59

... More
Renovation of Park;Cost of Folidol dust

30

35

1050

... More
Renovation of Park;Cost of Chemicals and Fertilizers ( for Maintainanace )

50

50

2500

... More
Renovation of Park;Tools and Implements (Hose pipes and other implements etc )

1

-

10000

... More
Renovation of Park;Erection of Name Board complete etc

1

-

20000

... More
Renovation of Park;Errection of New Gate inclusing Loading and Unloading and complete .etc

1

-

30000

... More
Renovation of Park;Painting to old walls with 2 cots of ready mix Oil bond washable distember (Water Proof ) of a approved brand and shade over a base coat of appropriate primer of approved brand making 2 coats in all to give a even shade after throlly brushing the surface to remove all durt and remanance of loose powder material , including cost and convinenance of all material to works site and all operational , incidental , labour charges etc complete for finished item of work . Including Terracota , Artistic work with white paint .

1

-

80000

... More
Renovation of Park;Painting with Synthetic enamel paint 2 coats of approved color of best quality etc. complete including cost & conveyance of all material at site as per standard specification for finished item of work

200

110

23930.9

... More
Renovation of Park;Add 18% GST

1

-

28024.56

... More
Renovation of Park;Cost of Plant Material

1

-

40000

... More
Renovation of Park;Misc

1

-

27.73



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.