Municipal Corporation Tender
... More
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Municipal Corporation - GHMC Tender
Civil And Construction
Drainage Work
Opening Date5 Mar 2025
Closing Soon19 Mar 2025
Tender Amount₹ 1,55,69,154
Costs
EMD
₹ 1,55,692Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
579498Tender No
NIT No.26/12/SE-M/LBNZ/GHMC/J2&J3/2024-25, date:01.03.2025Tender Authority
Municipal Corporation ViewPurchaser Address
-Website
http://https://www.ghmc.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Construction of RCC box Drain;Excavation for foundations in hard rock (blasting prohibited) with rock breakers including breaking rock, and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work excluding seigniorage excluding dewatering charges etc 5% OF EW QTY (Mechanical means )
192.57
889
171229.1
... More
Construction of RCC box Drain;Filling with Crusher Stone dust finer than 3mm with not more than 10% passing 0.075 sieve, including supply and delivery of crusher stone dust finer than 3mm for filling, including cost of crusher stone dust, seinourage charges and conveyance to site, filling charges, watering, tamping and rammming and all labour charges and operational charges complete as directed by the Departmental officers.
101.25
1192
120755.81
... More
Construction of RCC box Drain;Supply and placing of Ready Mix Concrete M 10 as per IS-4926:2003 of following grades with minimum cement content as per IS-456:2000 and Standard mix design as per IS-10262:1982, with coarse aggregate of nominal size 20mm and fine aggregate of Zone II as per the mix design approved by the Department from Standard suppliers including cost and conveyance, vertical pumping and Horizontal pumping on all materials, etc., works for basic cost including leveling, grading, spreading, curing for 14 days, centring, vibrating, compacting, finishing etc., as required including, material taxes, pumping, transportation, approved admixture etc., complete.(RMC-M10) Note: 1.Manufactured Sand (Rock sand) and natural river sand in the ratio of 50:50 shall be used.2. The quantities for cement, coarse aggregates and fine aggregates are for estimating purpose only. The exact quantities will be as per mix design.
101.25
4958
502001.55
... More
Construction of RCC box Drain;Carting of excavated surplus earth to an initial lead 10.00 km from site of work including loading, unloading, & conveyance charges etc., complete finished item of work.
1155.4
204
235702.62
... More
Construction of RCC box Drain;Supply and placing of RCC M 30 as per IS-4926:2003 of following grades with minimum cement content as per IS-456:2000 and Standard mix design as per IS-10262:1982, with coarse aggregate of nominal size 20mm and fine aggregate of Zone II as per the mix design approved by the Department from Standard suppliers including cost and conveyance, vertical pumping and Horizontal pumping on all materials, etc., works for basic cost including leveling, grading, spreading, dewatering , curing for 14 days, centring, vibrating, compacting, finishing etc., as required including, material taxes, pumping, transportation, approved admixture etc., complete. Note: 1.Manufactured Sand (Rock sand) and natural river sand in the ratio of 50:50 shall be used. 2. The quantities for cement, coarse aggregates and fine aggregates are for estimating purpose only. The exact quantities will be as per mix design. -bottom Raft
340.2
5724
1947491.91
... More
Construction of RCC box Drain;Supply and placing of RCC M 30 as per IS-4926:2003 of following grades with minimum cement content as per IS-456:2000 and Standard mix design as per IS-10262:1982, with coarse aggregate of nominal size 20mm and fine aggregate of Zone II as per the mix design approved by the Department from Standard suppliers including cost and conveyance, vertical pumping and Horizontal pumping on all materials, etc., works for basic cost including leveling, grading, spreading, dewatering , curing for 14 days, centring, vibrating, compacting, finishing etc., as required including, material taxes, pumping, transportation, approved admixture etc., complete. Note: 1.Manufactured Sand (Rock sand) and natural river sand in the ratio of 50:50 shall be used. 2. The quantities for cement, coarse aggregates and fine aggregates are for estimating purpose only. The exact quantities will be as per mix design.- Side Walls
364.5
8494
3096358.24
... More
Construction of RCC box Drain;Supply and placing of RCC M 30 as per IS-4926:2003 of following grades with minimum cement content as per IS-456:2000 and Standard mix design as per IS-10262:1982, with coarse aggregate of nominal size 20mm and fine aggregate of Zone II as per the mix design approved by the Department from Standard suppliers including cost and conveyance, vertical pumping and Horizontal pumping on all materials, etc., works for basic cost including leveling, grading, spreading, dewatering , curing for 14 days, centring, vibrating, compacting, finishing etc., as required including, material taxes, pumping, transportation, approved admixture etc., complete. Note: 1.Manufactured Sand (Rock sand) and natural river sand in the ratio of 50:50 shall be used. 2. The quantities for cement, coarse aggregates and fine aggregates are for estimating purpose only. The exact quantities will be as per mix design.- Top Slab
255.15
8273
2110973.32
... More
Construction of RCC box Drain;Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and technical specifications for Bars below 36 mm dia including over laps and wastage, where they are not welded
95985
66
6422356.35
... More
Construction of RCC box Drain;Bailing out water from pipe line renches with oil engine drain pumpsets including hire charges fuel charges and wages for helper etc, complete(5HP Diesel)
160
377
60320
... More
Construction of RCC box Drain;Supply and fixing of DI cover and outer frame (0.750x0.750X0.125) of weigth 130 kg including cost and conveyence of all materials, labour charges etc..,
25
19800
495000
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%