Municipal Corporation Tender

... More
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Municipal Corporation - GHMC Tender

Works
Civil And Construction
Civil Works Others
Excavation
Opening Date22 Feb 2025
Closing Date25 Feb 2025
Tender Amount₹ 6,63,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Development of Park;Bed preparation : Dressing the surface to the desired shape, laying 6" layer of fine red soil, covered with a thin layer of sand watering, rolling with hand roller (4" thickness after rolling), including the cost of red earth, sand and labour charges etc. complete but excluding the cost of fertilizers, chemicals and grass.

200

333

66750

... More
Development of Park;Carpet grass laying and ramming

200

58

11620

... More
Development of Park;Hedge / shrub planting: Digging the trench of size 15 cm depth, refilling the trench with red soil including cost of red soil and farmyard manure at 4:1 ratio, internal transportation of plants and planting the plants including the application of fertilizers and pesticides etc., (@ 20 gms/pit/sqmt) complete but excluding the cost of the fertilizers (@ 20 gms/pit/sqmt) and plant material.

100

317

31768

... More
Development of Park;Digging the pit of size 0.30x0.30x0.30 m, refilling the pit with red soil including cost red soil and farmyard manure at 4:1 ratio, internal transportation of plants and planting the plants including the application of fertilizers and pesticides (@ 20 gms/pit/sqmt) etc., complete but excluding the cost of the fertilizers (@ 20 gms/pit/sqmt) and plant material.

150

129

19468.5

... More
Development of Park;Digging the pit of size 0.45x0.45x0.45 m, refilling the pit with red soil including cost red soil and farmyard manure at 4:1 ratio, internal transportation of plants and planting the plants including the application of fertilizers and pesticides (@ 20 gms/pit/sqmt) etc., complete but excluding the cost of the fertilizers (@ 20 gms/pit/sqmt) and plant material. ( Individual-200 no's and Periperals- 100 no's)

100

194

19407

... More
Development of Park;Maintenance of Lawns: Watering the lawns @ 10-15 ltr/Sqm/day basing on the season and weather conditions (Sub Soil moisture shall be maintained continuously) ii) Lawn moving and edging of the lawn in edging of the lawns in the following frequency, keeping the lawn grass blade not more than 2 cm 1) June to Nov - Once in 15 days. 2) Dec to May - Once in 30 days. 3) edging the lawns in such a way that the lawn grass do penetrate into the plants and in a defined perfect geometric shapes or smooth curves. 4) Keeping the lawns always in lush green & weed free condition. 5) Application of fertilizers, insecticides, fungicide etc., with manual watering for (3) months

200

924

5544.66

... More
Development of Park;Maintenance of hedge/ shrub planting 1) Trimming of hedges once in 15 days 2) Watering hedges/shrubs once in a day @ 5 Ltrs per plant/per day ( Sub soil moisture shall be maintained continuously) 3) Formation of basins 1 feet away from the hedge. 4) Application of fertilizers, insecticides, fungicide for one year one labour daily must be present at the site and carry the necessary operations. It is responsible of the contractor to get the work done by the labou

100

2930

8792.37

... More
Development of Park;Maintenance of Individual shrubs: i) Trimming of shrubs once in 15 days ii) Watering to shrubs once in a day @ 5 litres / per plant / per day (sub soil moisture shall be maintained continuously) iii) Formation of basins for each and every plant upto 1 ft away from the plant iv) Application of fertilizers, insecticides, fungicides etc. a) with manual watering (for 3 months)

250

612

4594.57

... More
Development of Park;Cost, supply and installation of back rest support Cement Benches including transportation, loading, unloading and labour charges completed etc.,

8

7500

60000

... More
Development of Park;Cost, supply and installation of Name board 3 feet x 4 Feet

1

15000

15000

... More
Development of Park;Cost of good quality korean / mexican/shade carpet grass turf of 2'X1' or 2'X2' size duly rolled and of atleast once moved, with grass blades not more than 1 cm. height, without pumps and tufts, uniform in colour and texture, devoid of weeds, to be delivered at twin cities (220 x 10.76 = 2152 )

2152

10

22596

... More
Development of Park;Cost of plant materials as per the choice of the GHMC officials

-

200000

200000

... More
Development of Park;GST 18 %

1

67148

67148.67

... More
Development of Park;Misc

1

207

207.14



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.