Municipal Corporation Tender
... More
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Municipal Corporation - GHMC Tender
Civil And Construction
Drainage Work
Opening Date24 Feb 2025
Closing Soon5 Mar 2025
Tender Amount₹ 18,22,111
Costs
EMD
₹ 18,221Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
577657Tender No
NIT No. 30/EE-30/SD Z/GHMC/2024-2025 (Item 2) Dt.21-02-2025Tender Authority
Municipal Corporation ViewPurchaser Address
-Website
http://https://www.ghmc.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Desilting 2025;Supply of Gloves -18'' Long etc. including cost and conveyance and all charges etc., complete.
36
65
2340
... More
Desilting 2025;Supply and Delivery of M S Bolts / Nuts / Washers Complete for finished item of work.
50
93
4650
... More
Desilting 2025;Supply and fixing of Hot dipped Galvanized Iron Chain link mesh 8 gauge - (4.0 mm) as per IS: 2721-1979 - PVC Coated - 2"x2" (50 mm x 50 mm) - 8 Gauge including cost & conveyance of all materials to site including cost of seigniorage charges on all materials, all taxes, labour charges etc., Complete for finished item of work. TBSC-E.II-08
111
727
80697
... More
Desilting 2025;S& F 50 mm Nominal Bore GI pipe Medium Grade properties & weight as per IS 1239 ISI mark with GI fittings including the cost of pipe & its fittings & labour charges complete etc., Complete for finished item of work. TBSP-G.I-12
180
547
98460
... More
Desilting 2025;columns
0.54
9246
4993
... More
Desilting 2025;footings
1.73
8416
14560
... More
Desilting 2025;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and i including all operational, incidental and labour charges such as machine mixing, laying concrete, vibrating, curing etc.,complete but excluding cost of steel and its fabrication charges, centering and shuttering charges for finished item of work. (cement: 400kg) {50% natural river sand + 50% rock sand}
-
-
-
... More
Desilting 2025;Supply and fixing of MS gate/ Window grills, Iron doors/ Iron windows as approved by the dept officers including cost and conveyance of metarials, fabrication charges, cost of welding rods, power charges, labour charges for fixing of gate in position etc complete (SSR item)
330
107
35310
... More
Desilting 2025;Supplying, fitting and placing HYSD Fe 500 Grade steel for RCC works complete as per drawings and technical specifications for Bars below 36 mm dia including over laps and wastage, including cost of all materail like HYSD bars, binding wire, chairs, space bars and all labour charges for cutting, bending, placing position, shifting to site, tying etc.. complete where they are not welded
181.6
58
10694
... More
Desilting 2025;Plain Cement Concrete M20 nominal mix with 20mm metal with concrete mixture, using 400kgs of cement including Cost and Conveyance of all materials like Cement Sand Coarse Aggregate Water Etc., to Site, and Labour Charges for mixing , laying Concrete tamping, lifting, curing, finishing including hire charges of machinary but excluding Centering Shuttering Charges and cost of steel and fabrication charges Etc., Complete for finished item of Work.1 Cum {50% natural river sand + 50% rock sand}
5.4
6378
34444
... More
Desilting 2025;Flush Pointing to RR Masonary in Cement Mortor 1:3 Prop . including cost & conveyance of all materials like cement, sand to site, including labour charges on all materials, curing etc., Complete for finished item of work. {50% natural river sand + 50% rock sand}
9
115
1041
... More
Desilting 2025;Randum Rubble Masonry in Cement Mortor 1:6 Prop using hard granite (CR stone), Rough stone, Bond stones including Cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones,Rough stone, bond stone etc.,including Labour charges for cutting Stones to required size and shape at mixing of Cement Mortor Construction, Scaffolding, lift and curing Charges etc., Complete for Finished item of Work .Per 1 Cum {50% natural river sand + 50% rock sand}
24.3
4612
112088
... More
Desilting 2025;Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202 MORD / MORTH (cement concrete)
24.3
885
21518
... More
Desilting 2025;Engaging Shovel 0.85 cum 110 hp including fuel and all operational charges etc,complete
28
3557
99616
... More
Desilting 2025;Carting of desilted dry silt with mechanically loading, transporation to jawahar nagar to an average lead of 24 kms(approx) from the circl-30 jurisdiction including cost and conveyance of all materials and all labour charges, contractor profit and over head charges etc., complete for finished item of work as directed by GHMC officers.
1589.59
395
628206
... More
Desilting 2025;Excavation of drain with Excavator for removal of silt /Slussy including fuel and all other operartional charges complete as per specification.
2238.19
52
116386
... More
Desilting 2025;Carting of desilted dry silt with mechanically loading, transporation to jawahar nagar to an average lead of 24 kms(approx) from the circl-30 jurisdiction including cost and conveyance of all materials and all labour charges, contractor profit and over head charges etc., complete for finished item of work as directed by GHMC officers.. (Desilting of Catchpits)
390.07
395
154156
... More
Desilting 2025;Engaging of bucket cleaning machine with the aid of bucket running by 10 HP motors and iron rods to remove sludge/silt by running a suitable size bucket through a pipe strom water drain and box strom water drain inclusive of carting of removed sludge/silt to a lead of 5kms upto intermediate Transfer Station located at Lower Tank Bund and all hire,fuel charges and other operational and maintenance charges etc., complete
250
250
62500
... More
Desilting 2025;Removal of wet silt and sludge from sullage drains, with aid of baskets and vessels, etc with initial lift of 3 m and lead of 50 m.
582.19
522
303903
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%