For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
₹ 9,029Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
538304Bid Award Id
ViewTender No
GHMC/KC/E/1/9/2024-25/3, dt.21.08.2024.Tender Authority
Municipal Corporation ViewPurchaser Address
-Website
http://https://www.ghmc.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Balance work for Construction of Community Hall;Plastering with CM 2 coats, 20 mm thick, base coat in CM (1:6), 16mm thick and top coat in CM (1:4), 4mm thick with Dubara sponze finishing including cost & conveyance of all materials like cement, Sand , Water, etc., to site cost of seigniorage charges on all materials , all operational, including charges, labour charges for mixing mortar, finishing, scaffolding, lift charges, curing , including cutting grooves where ever necessary etc., complete for finished item of work of uneven surfaces of walls. (As per S.S. 904)
120.38
5460
65731
Balance work for Construction of Community Hall;S& F 50 mm Nominal Bore GI pipe Medium Grade properties & weight as per IS 1239 ISI mark with GI fittings including the cost of pipe & its fittings & labour charges complete
174
547
95178
Balance work for Construction of Community Hall;Brick Masonary 2nd Class Ground moulded or treditional size 23x11x7 Cm in Cement Mortor 1:6 Prop having minimum Crushing strength 40 Kgs Per Sqm including Cost & conveyance of all Materials like Cement, Sand, Bricks, Water, Etc., to site Cost of Seigniorage Charges on all Materials, all taxes including all labour charges like mixing Cement Mortor Scaffoding Charges lift charges , Curing charges Etc., Complete for finished item of work. (S.S. No. 504)
2.63
7613
19995
Balance work for Construction of Community Hall;Flush Pointing to RR Masonary in Cement Mortor 1:3 Prop . including cost & conveyance of all materials to site, cost of seignaiorage charges on all materials, all taxes, labour charges on all materials, curing etc., Complete for finished item of work.
69.6
1108
7717
Balance work for Construction of Community Hall;Plain Cement Concrete (1:2:4) nominal mix using 20mm metal with hand mixing using 330kgs of cement including Cost and Conveyance of all materials like Cement Sand Coarse Aggregate Water Etc., to Site, and Labour Charges , hire charges of macinery , laying Concrete tamping, lifting, curing, finishing but excluding Centering Shuttering Charges Etc., Complete for finished item of Work.1 Cum. For Benching Only
3.93
5965
23452
Balance work for Construction of Community Hall;Random Rubble Stones in Cement Mortor 1:6 Prop using hard granite stone including Cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones, Etc., including cost of Seigniorage Charges on all Materials, all taxes including Labour for cutting Stones to required size and shape mixing of Cement Mortor Construction, Scaffolding charges Curing , Etc., complete for finished item of work. (As per BLD-CSTN-48)
36.54
4587
167643
Balance work for Construction of Community Hall;Supply and placing of mild steel flats, angles, channels I-sections including its all necessary fittings & fixtures etc., complete
560
111
62608
Balance work for Construction of Community Hall;Plain Cement concrete (1:5:10) using (Cement 129.60kgs) 40 mm metal with Concrete mixture including cost and conveyance of all materials like cement, sand , coarse aggregate water etc., to site, seigniorage charges on all materials, Turn over Tax and labour charges, for mixing, laying , concrete ramming in 15 cm layers, finishing top surface to the required level curing etc., Complete for finished item of work as per .
7.39
4777
35298
Balance work for Construction of Community Hall;Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work including seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308).
39.54
277
10981
Balance work for Construction of Community Hall;Painting to new walls with 2 coats of water proof cement paint of approved brand and shade over a base coat of approved cement primer grade I making making 3 coats in all to give an even shade after thourughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 912 for internal walls
337.24
2610
88034
Balance work for Construction of Community Hall;Plastering with CM 2 coats, 20 mm thick, base coat in CM (1:6), 16mm thick and top coat in CM (1:4), 4mm thick with Dubara sponze finishing including cost & conveyance of all materials like cement, Sand , Water, etc., to site cost of seigniorage charges on all materials , all operational, including charges, labour charges for mixing mortar, finishing, scaffolding, lift charges, curing , including cutting grooves where ever necessary etc., complete for finished item of work of uneven surfaces of walls. (As per S.S. 904)
39
5460
21296
Balance work for Construction of Community Hall;Flooring with ceramic tiles, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete, including seigniorage charges, etc., complete for finished item of work, but excluding the cost of conveyance of all materials.
10.08
1092
11013
Balance work for Construction of Community Hall;Supplying, laying, jointing and testing 152.4 mm SWG SP-1pipes of ISI make onforming to ISI 651 & 4127 with airtight cement joints in CM 1.5:1 prop. including excavation ftrenches and socket pits in any soil except rock requiring blasting) up to 1524 mm(5'0") depth and refilling with watering and amping.
45
858
38610
Balance work for Construction of Community Hall;S& F 25 mm Nominal Bore GI pipe Medium Grade properties & weight as per IS 1239 ISI mark with GI fittings including the cost of pipe & its fittings & labour charges complete
60
326
19560
Balance work for Construction of Community Hall;Providing & Placing on Terrace (at all floor levels) polyethylene water storage tank with Double layer approved brand & manufacture with cover and suitable locking arrangement & making necessary holes for inlet & outlets and over flow pipes but without fittings & base support for tanks
1000
10
10000
Balance work for Construction of Community Hall;Supplying & fixing approved make Indian pattern white glazed W.C 1st quality ISI marked conforming to IS:2556-Part-3-2004 with "P" or "S"trap: 580 mm Long ,including cost and conveyance of all material,labour charges etc., complete.
1
1628
1628
Balance work for Construction of Community Hall;Supply of 6.0 Sqmm WPSC (Weather Proof Single Core) ISI mark Alluminium Wire.Makes : Polycab / GM / Million / V-Guard/ Gold Medal / Kundancab / HPL / RPG /Nandicab / Nakoda / Payal / Finecab /Gemini / Vimal / Suncab / Stanjo /Rajnigandha / Orbit / Airson /Beljin /Savera Champion / Rhino / Pawancab ,including cost and conveyance of all materials labour charges etc., complete.
30
18
556
Balance work for Construction of Community Hall;Painting with Synthetic Enamel paints - One Coat - for New Wood Work, Old Wood Work & New Iron Work (Synthetic Enamel paints in all shades Grade - I Asian/ Berger/ Nerolac / Indocem/ PMCC/ ESSAR or equivalent)
19.08
770
1470
Balance work for Construction of Community Hall;Providing skirting to internal walls to 15 to 18cm height/risers of steps with 17mm thick polished shabad stone length equal to flooring stones, set over base coat of CM (:3) 12mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like shabad stone, cement, sand and water etc., complete including seigniorage charges, etc., complete for finished item of work
8
8461
6769
Balance work for Construction of Community Hall;Flooring with high polished granite 16 to 18 mm mm thick slabs other than black set over base coat of cement mortar (1:8), 20 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like cement, sand water and tilesetc., complete, including seigniorage charges, labour charges for dressing of tilesetc., complete for finished item of work, but excluding the cost of conveyance of all materials
72.5
4150
30091
Balance work for Construction of Community Hall;MCBs (AS PER IS:8828) Supply of 6-32A SP MCB10KA, C/D Curve ISI Mark. Makes : Legrand-DX3 / Schneider-Acti9 / Siemens / L&T Exora / Cabtree / Indo Asian / BCH including cost and conveyance of all material charges etc., complete
6
309
1854
Balance work for Construction of Community Hall;Supply of 26W Pin type CFL Lamp.Makes : Phillips / Crompton / Bajaj /Surya / Havells / HPL / Halonix. including cost and conveyance of all material charges etc.,complete
4
143
572
Balance work for Construction of Community Hall;Supply and transportation of 20W+/-10%, >/ 2000 lumens, 1200mm length LED retro tube light, housing made with alluminium anodised body, wide operating voltage with double side connection, PF=0.9, Surge protection:> 2KV, THD<15%, with inbuilt driver and osted cover CCT: 3000K - 6500Kas desired by the department and as per IS specifications, minimum CRI=80,.etc complete with 5 years warranty with BISCertification.LUMINAIRE MAKE: Phillips / OSRAM /Wipro / Crompton / Bajaj / Havells /Jaquar / IB LED / Panasonic / Halonix /HPL / Syska / Eveready / Surya /Keselec/ FIEM / Arraystorm / GM/Goldmedal .LED MAKE : PHILIPS LUMILEDS/CREE/NICHIA / OSRAM/SAMSUNG / LG LEDs.
6
560
3360
Balance work for Construction of Community Hall;Supply of 48" (1200mm) Sweep decorative Ceiling Fan 1 Star Rated with all accessories etc., complete.Makes : Crompton / Havells / Orient ,including all charges etc., complete.
25
2000
50000
Balance work for Construction of Community Hall;Supply of 2.5 Sqmm FRLSH / HFFR PVC insulated 1100V grade as per IS:694/1990, IS 17048 specification for Copper cable. Makes : Finolex / RR kabel / Havells / Polycab /Beljin (HFFR) /Ollvin(HFFR) / Finecab Gold (HFFR) / GM(HFFR) / Gold Medal(HFFR) / Million(HFFR) /KEI (HFFR) / V-Guard (HFFR)./ DEC (FRLS / HFFR) / Bonton (HFFR) and Avocab (HFFR) / Fortune Arrt (HFFR) / SPM (HFFR) / Sudhakar (HFFR) / Nakoda (HFFR) / HPL (HFFR) / GLOSTER (HFFR) / Rajnigandha (HFFR) / Pawancab (HFFR) / South King (HFFR) (ELEC-1.5.1 B)
180
37
6682
Balance work for Construction of Community Hall;Supply of 1.0 Sqmm FRLS / HFFR PVC insulated 1100V grade as per IS:694/1990 specification for Copper cable.1723 a Makes : Polycab / HPL / RPG / Kundancab / Nakoda / Anchor / GM / Million / Gold Medal / Power Flex / Fine Cab / Sun Cab/ Fortune Arrt / Bonton /Gloster /Gemini / Uniflex / Sudhakar / Nandicab..(ELEC-9.2.8 B)
180
11
2128
Balance work for Construction of Community Hall;Dummy Cover to PVC junction boxes(ELEC-1.2.10)
10
6
60
Balance work for Construction of Community Hall;Supply of 3 Plate Jumbo Ceiling Rose. Makes : GM G Home / Gold Medal Olive /Million Zoom / Anchor Penta Cherry /Great white Omega / HPL / Vimal / CPL.(ELEC-1.7.1 M)
10
23
230
Balance work for Construction of Community Hall;Supply of MC Holder.Makes : GM / Million / Gold Medal /Anchor / Great white..(ELEC-1.7.2 E)
10
24
240
Balance work for Construction of Community Hall;Supply of Stepped type Electronic Regulator.Makes : GM G Home / Gold Medal Olive /Million Zoom / Anchor Penta Cherry /Great white Omega / HPL / Vimal / CPL.(ELEC-1.7.1 L)
3
242
726
Balance work for Construction of Community Hall;Supply of 6 / 10A 1 Way 1 Module Modular Switch-Makes : Legrand Arteor / Schneider Zencelo / Honeywell Blenge Plus / CabtreeAmare / Logus Platina / Gold Medal GIFA/ GM-Zenova/ L&T- Englaze (ELEC-1.9.1 a)
30
116
3480
Balance work for Construction of Community Hall;Supply of 4 Module box including cost and conveyance of all material charges etc., complete
2
120
240
Balance work for Construction of Community Hall;Supply of 8 or 9 Module box orizontal/Vertical including cost and conveyance of all material charges etc., complete
2
213
426
Balance work for Construction of Community Hall;Supply of25mm dia 1.5mm thick Medium grade PVC Bends.Makes : Sudhakar / Finolex / Modi / VIP / Precision / DEC / Beljin / Champion /Austro ,including all charges etc., complete.
20
10
200
Balance work for Construction of Community Hall;Supply of PVC Junction Boxes Deep size Makes : Sudhakar / Finolex / Modi / VIP / Precision / DEC / Beljin / Champion / Austro ,including all charges etc., complete.
8
33
264
Balance work for Construction of Community Hall;Supply and fixing of consealed box P.V.C. / M.S with Hook for fan including cost and conveyance of all material charges etc., complete
3
138
414
Balance work for Construction of Community Hall;Supply of ISI 25mm outer dia heavy grade with IS:9537 part 3 rigid PVC pipe. Makes : Sudhakar / Finolex / Modi / VIP /Precision / Universal / Million Plast /Gold / Polycab / DEC / Beljin /Champion / Austro ,including cost and conveyance of all material charges etc., complete
60
43
2580
Balance work for Construction of Community Hall;Providing impervious coat to exposed RCC roof slab surface with CM(1:3), 20mm thick with 1kg of water proof compound per bag of cement laid over roof when it is green including cost of all materials, seigniorage charges, excluding conveyance charges of materials and including all operational, incidental and labour charges for mixing mortar, laying, rendering smooth and thread lining, curing, rounding off junctions of wall and slab etc,, complete for finished item of work
90
5873
52859