Municipal Corporation Tender

... More
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Municipal Corporation - GWMC Tender

Works
Civil And Construction
Building Construction
Opening Date2 Apr 2025
Closing Soon15 Apr 2025
Tender Amount₹ 33,66,797 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of Compound Wall, Painting and repairs of the Mepma Building at Rajivgruhakalpa houses,;pvc connection pipes

4

341

1367.92

... More
Construction of Compound Wall, Painting and repairs of the Mepma Building at Rajivgruhakalpa houses,;taps

4

312

1249.76

... More
Construction of Compound Wall, Painting and repairs of the Mepma Building at Rajivgruhakalpa houses,;naunhy trap with jolly

6

152

913.44

... More
Construction of Compound Wall, Painting and repairs of the Mepma Building at Rajivgruhakalpa houses,;wastabge pipes

4

122

490

... More
Construction of Compound Wall, Painting and repairs of the Mepma Building at Rajivgruhakalpa houses,;urinal pans

2

1249

2499.52

... More
Construction of Compound Wall, Painting and repairs of the Mepma Building at Rajivgruhakalpa houses,;SANITARY ITEMS: wash basin

2

1754

3508.42

... More
Construction of Compound Wall, Painting and repairs of the Mepma Building at Rajivgruhakalpa houses,;TBSP-H.II-01 : Providing & Placing on Terrace (at all floor levels) polyethylene water storage tank with Double layer approved brand & manufacture with cover and suitable locking arrangement & making necessary holes for inlet & outlets and overflow pipes but without fittings & base support for tanks

1000

11

11360

... More
Construction of Compound Wall, Painting and repairs of the Mepma Building at Rajivgruhakalpa houses,;Painting with Synthetic Enamel paints grade-1 - One Coat - for New Wood Work, Old Wood Work & New Iron Work including cost and conveyance of all materials to site, sales & other taxes, incidental, operational and all labour charges etc., complete for finished item of work. (APSS No. 1201, 1207 & 1212).

46.8

96

4518.54

... More
Construction of Compound Wall, Painting and repairs of the Mepma Building at Rajivgruhakalpa houses,;Windows repairs with G.I Sheet including cost and conveyance of all materials etc complete

1

18000

18000

... More
Construction of Compound Wall, Painting and repairs of the Mepma Building at Rajivgruhakalpa houses,;Arrengement of ELECTRICAL ITEMS

1

30000

30000

... More
Construction of Compound Wall, Painting and repairs of the Mepma Building at Rajivgruhakalpa houses,;Flooring with Non-skid red or white full body Ceramic floor tiles of size 300 x 300 mm and thickness between 7-8 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designsceramic tiles, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete, including complete for finished item of work

313.12

996

311870.65

... More
Construction of Compound Wall, Painting and repairs of the Mepma Building at Rajivgruhakalpa houses,;Roofing with Pre-painted Galvanized Trapezoidal Profile Roofing sheets, fixing with G.I ?J? bolts & nuts 8 mm dia G.I plain washers complete including seigniorage charges etc., complete for finished item of work, but excluding the cost of purlins, rafters, trusses & cost of conveyance of all materials ? upto 600 pitch.

20.25

1243

25176.83

... More
Construction of Compound Wall, Painting and repairs of the Mepma Building at Rajivgruhakalpa houses,;Painting to new walls with 2 coats of water proof cement paint of apporved brand and shade over a base coat of approved cement primer grade II making making 3 coats in all to give an even shade after thourughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 912 for external walls

2924

277

810562.04

... More
Construction of Compound Wall, Painting and repairs of the Mepma Building at Rajivgruhakalpa houses,;Plastering 20mm thick two coats with base coat of 16mm thick in C.M. (1:6) and top coat of 4mm thick in C.M. (1:3) with dubara sponge finishing including cost & conveyance of all materials like cement, Sand , Water, etc., to site, charges, all operational, including charges, labour charges for mixing mortar, finishing, scaffolding, lift charges, curing , including cutting grooves where ever necessary etc., complete for finished item of work of uneven surfaces of walls. (External walls)

923.9

592

547096.62

... More
Construction of Compound Wall, Painting and repairs of the Mepma Building at Rajivgruhakalpa houses,;Brick Masonry work in CM (1:8) prop with Flyash Cement solid blocks of size 290 x 225 x 140 mm for manufacturing of flyash solid blocks using flyash of 80 kgs, cement of 15 kgs. Gypsum of 5 kgs. and stone dust including cost and conveyance of all materials, labour charges, scaffolding and curing etc., cpomplete with a compresive strength not lessthan 50 kg/sqm for walls for Superstructure Walls.

78.66

7692

605081.82

... More
Construction of Compound Wall, Painting and repairs of the Mepma Building at Rajivgruhakalpa houses,;Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) Fe 500 grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc., complete for finished item of work in all floors.( APSS No.126)

1271.7

66

84008.5

... More
Construction of Compound Wall, Painting and repairs of the Mepma Building at Rajivgruhakalpa houses,;coloumns

0.9

13924

12532.29

... More
Construction of Compound Wall, Painting and repairs of the Mepma Building at Rajivgruhakalpa houses,;pedestals

0.75

10715

8036.97

... More
Construction of Compound Wall, Painting and repairs of the Mepma Building at Rajivgruhakalpa houses,;BLD-CSTN-3-14-(31) - A : S: Supply and placing of the M-20 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site . sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering and suttering charges etc.,complete but excluding seignorage charges, cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code for PLINTH, PEDESTALS and FOOTINGS. Note : 1) The cement content is adopted as 350Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 350 Kgs/ Cum the defference in cost shall be deducted (a) for Plinth beams

12.06

13260

159923.44

... More
Construction of Compound Wall, Painting and repairs of the Mepma Building at Rajivgruhakalpa houses,;BLD-CSTN-6-13-(68) : Construction of RR Masonary in Cement Mortor ( 1:8 ) Prop using hard granite stone including cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones, including Charges on all Materials, ,labour charges for cutting Stones to required size and shape, mixing of Cement Mortor ,Construction, Scaffolding Charges curing etc., complete for finished item of Work .

95.31

4910

467996.88

... More
Construction of Compound Wall, Painting and repairs of the Mepma Building at Rajivgruhakalpa houses,;BLD-CSTN-3-4 (21) -Hand mixing up to Plinth Level : Plain Cement concrete nominal mix (1:4:8) prop (Cement : fine aggregate: coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , charges on all materials, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed.

14.54

5422

78840.53

... More
Construction of Compound Wall, Painting and repairs of the Mepma Building at Rajivgruhakalpa houses,;Filling with Stone dust in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO.309 & 310)

14.54

686

9983.45

... More
Construction of Compound Wall, Painting and repairs of the Mepma Building at Rajivgruhakalpa houses,;Earthwork in excavation for as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD /

88.99

297

26452.28



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.