Municipal Corporation Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
₹ 43,740Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
533135Tender No
NIT No.09/4/SE-M/LBNZ/GHMC/J2/2024-25, Date:03.08.2024Tender Authority
Municipal Corporation ViewPurchaser Address
-Website
http://https://www.ghmc.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Construction of 1st Floor;Supply of 12 Way SPN DB with IP 20/30 Protection as per IS:13032 and suitable for 12 Nos S.P out goings and for 1 No Incommer etc complete. Makes : Havells / HPL / Hager / Indo Asian (Gold Plus) / Delton / Honeywell sentry / Benlo / Panasonic. -ELEC-2.16.2(e)
2
1113
2226
... More
Construction of 1st Floor;Supply of 6-32A 10KA SP MCB ISI Mark of Makes : ABB /Havells / HPL(Techno)/Hager/C&S/Delton/Honeywell/sentry /Benlo /Salzar-ELEC-2.14.2(a)
8
240
1920
... More
Construction of 1st Floor;Supply of Stepped type Electronic Regulator. Makes : GM G Home / Gold Medal Olive / Million Zoom / Anchor Penta Cherry / Great white Omega / HPL/Vimal / CPL-ELEC-1.7.1(l)
40
242
9680
... More
Construction of 1st Floor;Supply of 6 / 10A 1 Way 1 Module Modular Switch Legrand Arteor / Schneider Zen celo / Honeywell Blenge Plus / Cabtree Amare / Logus Platina / Gold Medal GIFA / GM-Zenova/ L&T- Englaze -ELEC-1.9.1(a)
60
116
6960
... More
Construction of 1st Floor;Supply of 2.5 Sqmm FRLS / HFFR PVC insulated 1100V grade as per IS:694/1990 specification for Copper cable. Makes : Khanthi / Vimal / Stanjo / Orbit-ELEC-1.5.3 (b)
500
26
13155
... More
Construction of 1st Floor;Supply of 1.0 Sqmm FRLS / HFFR PVC insulated 1100V grade as per IS:694/1990 specification for Copper cable.Makes : Benlo / Khanthi / Vimal / Stanjo / Airson / Rajnigandha / Orbit -ELEC-9.2.8(c)
800
10
8184
... More
Construction of 1st Floor;Supply & fixing of 12 Module box vertical.ELEC-1.3.1(f)
20
258
5160
... More
Construction of 1st Floor;Supply & fixing of ISI 25mm dia 3 rigid PVC pipe of makes Sudhakar / Maco Plast / Modi.ELEC-1.2.2.(b)
150
31
4650
... More
Construction of 1st Floor;Supply & fixing of ISI 20mm dia 3 rigid PVC pipe of makes Sudhakar / Maco Plast / Modi.-ELEC-1.2.2.(a)
130
23
2990
... More
Construction of 1st Floor;Providing & Placing on Terrace (at all floor levels) polyethylene water storage tank with Double layer approved brand & manufacture with cover and suitable locking arrangement & making necessary holes for inlet & outlets and over flow pipes but without fittings & base support for tanks
3000
10
30000
... More
Construction of 1st Floor;S& F 25 mm Nominal Bore GI pipe Medium Grade properties & weight as per IS 1239 ISI mark with GI fittings including the cost of pipe & its fittings & labour charges complete
400
326
130400
... More
Construction of 1st Floor;S& F 15 mm Nominal Bore GI pipe Medium Grade properties & weight as per IS 1239 ISI mark with GI fittings including the cost of pipe & its fittings & labour charges complete
400
223
89200
... More
Construction of 1st Floor;Providing impervious coat to exposed RCC roof slab surface with CM(1:3), 20mm thick with 1kg of water proof compound per bag of cement laid over roof when it is green including cost of all materials, seigniorage charges, excluding conveyance charges of materials and including all operational, incidental and labour charges for mixing mortar, laying, rendering smooth and thread lining, curing, rounding off junctions of wall and slab etc,, complete for finished item of work
266.6
666
177592.92
... More
Construction of 1st Floor;Painting to new walls with 2 coats of ready mixed oil bound wahsable distemper of approved brand and shade over a base coat of appropriate primer of approved brand, making 3 coats in all to give an even shade after thourughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 911 for internal walls on new plastered surface -Ground, First and second
2618.94
166
434744.04
... More
Construction of 1st Floor;Flooring with 15 to 18 mm thick polished shabad stones/Tandur Stone Slabs set over base coat of CM (1:8) over already laid CC bed / RCC Roof Slab, including neat cement slurry of honey like consistency spread @ 3.3 kgs per sqm. & Jointed with neat cement to full depth including cost of all materials like cement, sand, and water and flooring stones etc., complete, including seigniorage charges, labour charges for dressing of flooring stones etc., complete for finished item of work, but excluding the cost of conveyance of all materials.
301
883
265861.26
... More
Construction of 1st Floor;Plastering 20mm thick two coats with base coat of 16mm thick in C.M. (1:6) and top coat of 4mm thick in C.M. (1:4) with dubara sponge finishing including cost & conveyance of all materials like cement, Sand , Water, etc., to site cost of seigniorage charges on all materials , all operational, including charges, labour charges for mixing mortar, finishing, scaffolding, lift charges, curing , including cutting grooves where ever necessary etc., complete for finished item of work of uneven surfaces of walls. (As per S.S. 904) per 10 Sqm-For 1st floor
982.28
621
610565.6
... More
Construction of 1st Floor;Brick Masonary 2nd Class Ground moulded or treditional size 23x11x7 Cm in Cement Mortor 1:6 Prop having minimum Crushing strength 40 Kgs Per Sqm including Cost & conveyance of all Materials like Cement, Sand, Bricks, Water, Etc., to site Cost of Seigniorage Charges on all Materials, all taxes including all labour charges like mixing Cement Mortor Scaffoding Charges lift charges , Curing charges Etc., Complete for finished item of work. (S.S. No. 504), per 1 Cum-For 1st floor
74.46
8685
646751.36
... More
Construction of 1st Floor;Providing and fixing of Two shutter Sliding Windows made of Galvanized Steel as per IS 513, D quality, galvanized as per IS 277 with powder coated with Pure polyester powder up to 50-60 microns thick with total coated thickness of 0.8 mm for Outer Frame and 0.58 mm thickness for Sliding Shutter Section, the Outer Frame for Two Tracks without grill provision is of 75 mm x 50 mm and the Window Shutter section of 58 mm x 36 mm and the outer Frame with two integrated guide tracks of 12mm width and 24mm deep for provision to slide the Shutter / sash frame and facilitates with a water drain outlet component made of PVC and the shutter frame fitted with 5mm thick plain float glass of reputed make and fixed with EPDM weathering seal resistant accessories and handle made of Aluminium 1 No. per each shutter including installation of window system at site using anchor fasteners, Silicon sealant applied at the Outer frame corners inclusive of conveyance of all materials accessories, labour charges, and erection at site with complete finished item of work for Window with Two Sliding Shutters and with Grill-TBSC-M.II-03 -Doors
40.32
6273
252927.36
... More
Construction of 1st Floor;Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and technical specifications for Bars below 36 mm dia including over laps and wastage, where they are not welded -Column up to roof level Ambedkar Seva Sangham
8313.33
70
582099.09
... More
Construction of 1st Floor;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, but excluding centering, shuttering. (400 Kgs Cement) - Sunshades
1.16
12504
14465.32
... More
Construction of 1st Floor;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, but excluding centering, shuttering. (400 Kgs Cement) - Lintels
1.33
15776
20988.02
... More
Construction of 1st Floor;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, but excluding centering, shuttering. (400 Kgs Cement) -Steps
3.02
14252
43115.2
... More
Construction of 1st Floor;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, but excluding centering, shuttering. (400 Kgs Cement) - Slab 150mm thick
296.7
1950
578775.66
... More
Construction of 1st Floor;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, but excluding centering, shuttering. (400 Kgs Cement)-For 1st floor -Roof Beams
14.96
14890
222747.72
... More
Construction of 1st Floor;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, but excluding centering, shuttering. (400 Kgs Cement)-For 1st floor -Column up to roof level
4.97
16083
79902.48
... More
Construction of 1st Floor;Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202 MORD / MORTH-Existing Reinforced Cement Concrete and prestressed Concrete
2.75
3005
8262.52
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements